World University of Bangladesh. WELCOME TO OUR PRESENTATION.

21
World University of Bangladesh

Transcript of World University of Bangladesh. WELCOME TO OUR PRESENTATION.

Page 1: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

World University of Bangladesh

Page 2: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

WELCOME TO OUR PRESENTATION

Page 3: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

Submitted By:Md. Rakibul Islam ID NO: WUB-08/12/12/364

Khan Mahibur Rahman ID NO: WUB-08/12/15/419

Md. Al-Amin ID NO: WUB-08/11/15/421

Supervisor

Engr. Elias Khalil

Lecturer & Co-ordinator,

Department OF Textile Engineering

COMPARATIVE STUDY AMONG INDUSTRIAL PRODUCTION PROCESS OF DIFFERENT GARMENTS

Page 4: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

In a garment industry there are several items of garments can be produce. For different types of garments different time required to produce. SAM and SMV is one of them which calculate out the mean time for produce a complete garment. Here the study going to about the time variation for producing different kind of garments item.

Introduction

Page 5: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

o Production study is used to calculate the actual production of a worker per hours.

o To calculate the actual production we have to see the total working minute in hour without lost time.

o To know target of a worker.

o To evaluate the finishing time of an item or product.

o Production study helps for planning to maintain the layout and line balancing of machine and product.

o For use as the basis for determining the unit cost of manufacture and the wage rate.

o For use the basis for introducing a production control system.

Aim and Objective

Page 6: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

o Stop watch

o Time Study Format

o Pen

o Paper

o Calculator

o Camera

o Measurement Tape

o Scissor

Materials

Page 7: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

Sl. No. ItemNumber of Processes

Number of Type of Machines

Used

No of M/C Used Number of

Manpower Needed

Standard Allowed Time.(SAM)Min.

Sewing Thread Consumption

(m/dz)Cost/Pc

1 T-Shirt 17 8 13 19 6.48 106.71 $ 6.202 Denim Pant 47 10 40 57 23.00 295.56 $ 9.52

3Jacket (Dual Hood

with Fur across Hood)

84 10 78 107 66.54 603.4 $ 18.63

4 Shirt (5 Pocket) 48 12 42 52 19.53 306.52 $ 8.15

5 Cargo Pant 73 12 66 73 44.6 201.36 $ 9.25

6 Army Jacket 97 12 86 97 57.18 589.23 $ 16.82

7 Short Pant 53 13 46 50 20.09 95.45 $ 3.158 Kids Pant 37 12 32 40 17.95 76.32 $ 6.59

9 Double Pocket Shirt 54 11 38 53 20.00 256.5 $ 7.69

10 Girls Denim Pant 64 12 53 66 26.40 285.36 $ 12.38

Data Table for Various Garments Items

Page 8: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

Sl. No.

OperationAverage Cycle

time(sec)Estimated

SMV

01.SMV for Number matching front to back part

15 0.24

02. SMV for Shoulder joining 17 0.2703. SMV for Neck make 16 0.2604. SMV for Neck joint 19 0.3005. SMV for Neck piping 18 0.29

06.SMV for Round neck edge tack

20 0.32

07. SMV for Back tap top stitch 38 0.6008. SMV for Main label attaching 19 0.3009. SMV for Sleeve hem 19 0.3010. SMV for Sleeve match 18 0.2911. SMV for Sleeve joining 38 0.6012. SMV for Side joining 51 0.8013. SMV for Care label joining 13 0.2914. SMV for Body turning 20 0.3215. SMV for Side top stitch 38 0.6016. SMV for Neck top stitch 22 0.3517. SMV for Bottom hem 22 0.35Total SMV 6.48

Production Summary of a T-Shirt

Page 9: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

Production Summary of a T-Shirt

Page 10: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

In comparing between T-shirt and a Stylish 5 pocket Shirt we see that there is a huge

difference in SAM (T-shirt-6.48 and 5 Pocket shirt- 19.53). But in case of costing there is

only $1.95 difference. In this case our concerned industry will give the production priority

to T-Shirt. Where requires less time more production and more profit.

Comparison Between a T-shirt and a Stylish 5 Pocket Shirt

Page 11: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

Production Summary of a Denim Pant

Page 12: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

Production Summary of a Girls Denim Pant

Page 13: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

oIn comparing between Denim Pant and a Girls Denim Pant we see there are small

difference in SAM (Denim Pant-23 and Girls Denim Pant-26.40) and cost ($ 2.8

difference). But Girls denim pant requires more processes and manpower. Also it has

critical type of laser treatment for allover design. In this case the company should give

priority to denim pant. But for a special purpose that to attract buyer for collect more

orders, the company will give priority to Girls Denim Pant which is a fancy style.

Comparison Between a Denim Pant and a Girls Denim Pant

Page 14: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

Production Summary of a Hoody Jacket

Page 15: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

Machine SAM Manpower

S/N 31.2 52

D/N 1.9 3

Angular(D/N) 0.0 0

C/S 0.3 0

K/S 0.0 0

S/N (E/C) 5.8 11

3 O/L 0.6 1

5 O/L 6.9 12

PUNCH 0.3 1

S/B 0.4 0

Velcro 0.0 0

BTK 0.9 1

Operators 48.1 81

Helper 6.2 11

IRON 2.9 5

Helper 9.1 16

Operators + Helpers 57.18 97

Operators Target @100% Eff @ 10Hours

1011

Operators Target @80% Eff @ 10 Hours

809

Operators Target @70% Eff @ 10 Hours

708

Expected Pcs/Machine 8.74Expected Pcs/Man(Operators +

Helpers) @ 65% Eff7.29

Production Summary of a Army Jacket

Page 16: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

oIn comparing between Dual Hood Jacket and Army Jacket we see a small difference in

SAM (Jacket with dual hood-66.54 and Army Jacket-57.18). Also costing difference is

small ($1.81 difference). But there are big difference in no of processes are used where

Dual Hood Jacket requires more manpower and machine. So the planning department of

the company give more priority to the Army Jacket.

Comparison Between a Denim Pant and a Girls Denim Pant

Page 17: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

Machine SAM Manpower

S/N 23.1 47F/L 0.4 1

3 O/L 3.0 65 O/L 2.1 4

BTK 2.0 3K/S 2.1 4

FOA 1.1 2S/B 2.0 4

CHAIN ST. 0.5 1APW 0.3 1N/H 0.5 1

Vi-be 0.5 1Operators 37.5 75

Helper 4.2 8IRON 3.0 6

Operators+Helpers 44.6 89Operators Target @ 100% Eff @ 10 hours 1202  

Operators Target @ 75% Eff @ 10 hours 901  Operators Target @ 65% Eff @ 10 hours 781  

Expected Pcs/Machine 12  Expected Pcs/Man(Operators + Helpers) @

75% Eff 10

Production Summary of a Cargo Pant

Page 18: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

                      

Machine SAM Manpower  

S/N 9.1 24S/N (E/C) 1.2 3

D/N 1.5 43 O/L 1.5 45 O/L 1.0 3F.O.A 1.0 4A.P.W 0.4 1

K/S 0.3 1BTK 0.7 2

F/L 0.3 1Belcro Att: 0.6 2

B/H 0.2 1B/A 0.2 0

Operators 18.0 50HELPER 3.0 7

IRON 0.0 0Operators + Helpers 20.90 57

Operators Target @ 100% Eff/ 10 Hours 1671  Operators Target @ 75% Eff /10 Hours 1253

Expected Pcs/Machine @ 100% Eff 25Expected Pcs/Man(Operators + Helpers) @

75% Eff19

Production Summary of a Short Pant

Page 19: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

oIn comparing between Cargo Pant and Short Pant we see cargo pant requires more

SAM, more cost, more manpower and processes than a short pant. In this case the factory

should give more priority to short pant. But the Cargo Pant give more profit than a short

pant and it increases the efficiency of worker. Also this item requires a long lead time

which keeps the whole production process busy for a long time.

Comparison Between a Cargo Pant and a Short Pant

Page 20: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

This research is based on some effective layout model of different garments items where to use balancing process using short cut method. During the research it is seen thread trimming is being done manually using helper which is non-value added unnecessary operation can be removed by setting auto trimmer along with machine or by using auto machine. The study shows that this balanced layout model has brought a better synchronization among man machine and materials increasing the efficiency and productivity.

Conclusion

Page 21: World University of Bangladesh. WELCOME TO OUR PRESENTATION.

Thanks To All