World Class Manufacturing Asset Utilization

13
Improving Asset Utilization Improving Asset Utilization The Key to World Class The Key to World Class Manufacturing Manufacturing PROPRIETARY NOTICE The information contained on all pages of this document consists of technical, commercial, and / or financial information which is confidential and proprietary to Woodard & Curran. This information is presented in confidence to our Customer with the understanding that it may not be reproduced or used, in whole or in part, for any purpose other than evaluation of the services described herein.

description

This is a program that we can offer to improve your operations.

Transcript of World Class Manufacturing Asset Utilization

Page 1: World Class Manufacturing Asset Utilization

Improving Asset UtilizationImproving Asset Utilization

The Key to World ClassThe Key to World ClassManufacturingManufacturing

PROPRIETARY NOTICE

The information contained on all pages of this document consists of technical, commercial, and / or financial information which isconfidential and proprietary to Woodard & Curran. This information is presented in confidence to our Customer with the understanding thatit may not be reproduced or used, in whole or in part, for any purpose other than evaluation of the services described herein.

Page 2: World Class Manufacturing Asset Utilization

Our ObjectiveOur Objective

Woodard & Curran values this beverage client asWoodard & Curran values this beverage client asa major strategic client.a major strategic client.

We want to be the consultant of choice inWe want to be the consultant of choice inengineering services.engineering services.

Assist client in their path toward a moreAssist client in their path toward a morecompetitive, worldcompetitive, world--class, efficiencyclass, efficiency--driven, agile & growthdriven, agile & growth--oriented supplyoriented supply

chain networkchain network

Page 3: World Class Manufacturing Asset Utilization

Focus on ManufacturingFocus on ManufacturingPerformancePerformance

Methodology Parameters:Methodology Parameters:–– Measures effectiveness of an assetMeasures effectiveness of an asset

–– Based on industry standards to compare & benchmarkBased on industry standards to compare & benchmarkbase line metricsbase line metrics

–– Repeatable and consistentRepeatable and consistent

–– Flexible and scalableFlexible and scalable

–– Based upon an open technologyBased upon an open technology

Metric to be used is:Metric to be used is:

Overall Equipment Effectiveness (OEE)Overall Equipment Effectiveness (OEE)

Page 4: World Class Manufacturing Asset Utilization

How is OEE derived?How is OEE derived?

Single ShiftSingle Shift

Lunch BreaksLunch Breaks

MeetingsMeetingsAvailable TimeAvailable Time

Sto

psS

tops

Overall Equipment Effectiveness =Availability x Performance x Quality(EA) x (PE) x (QR)

Overall Equipment Effectiveness =Availability x Performance x Quality(EA) x (PE) x (QR)

Availability = Available Time – Down TimeAvailable Time

Availability = Available Time – Down TimeAvailable Time

Equipment FailureEquipment Failure

Setup & AdjustmentSetup & AdjustmentRun TimeRun Time

Dow

nT

ime

Dow

nT

ime

Reduced SpeedReduced Speed

Idling & Minor StopsIdling & Minor StopsFull CapacityFull Capacity

Spe

edLo

sses

Spe

edLo

sses

Performance = ProductionRated Speed x Run Time

Performance = ProductionRated Speed x Run Time

Quality = Production -RejectsProduction

Quality = Production -RejectsProduction

RejectsRejects

Reduced YieldReduced Yield

GoodProduction

GoodProduction

Rej

ects

Rej

ects

Time Example Time Lost Causes Key Performance Indicators

90.0%90.0%Overall OEEOverall OEE

99.9%99.9%QualityQuality

95.0%95.0%PerformancePerformance

90.0%90.0%AvailabilityAvailability

World ClassWorld ClassOEE FactorOEE Factor

Page 5: World Class Manufacturing Asset Utilization

What is the program Woodard &What is the program Woodard &Curran proposes???Curran proposes???

Analyzeequipment data

Implementsolution

Measure OEE

Page 6: World Class Manufacturing Asset Utilization

Phase 1: MeasurePhase 1: Measure

Evaluate/upgrade line communicationEvaluate/upgrade line communicationarchitecturearchitecture

Map data in OEM control processorsMap data in OEM control processors

Install data server and concentratorInstall data server and concentrator

Install KPI softwareInstall KPI software

ThenThen …… collect data for three monthscollect data for three months

Page 7: World Class Manufacturing Asset Utilization

Quick road to the benefitsQuick road to the benefitsPackaged KPI application?Packaged KPI application?……

Decreased timeDecreased time--toto--deploymentdeployment–– Accelerates payback and ROIAccelerates payback and ROI

Reduced project risk and costReduced project risk and cost–– Well defined scopeWell defined scope

–– Proven, preProven, pre--packaged application functionalitypackaged application functionality

–– Based on extensive domain expertise, knowledge ofBased on extensive domain expertise, knowledge ofmarket best practices, and operational/businessmarket best practices, and operational/businessprocessesprocesses

Sustainability of solutionSustainability of solution–– Packaged software upgraded periodically to stopPackaged software upgraded periodically to stop

technology stagnationtechnology stagnation

Page 8: World Class Manufacturing Asset Utilization

Phase 1: DeliverablesPhase 1: Deliverables

Factory Metrics installedFactory Metrics installedon two lineson two lines

Facility controlsFacility controlsarchitecture upgraded andarchitecture upgraded anddocumenteddocumented

Listing of data tables inListing of data tables inOEM equipmentOEM equipment

Page 9: World Class Manufacturing Asset Utilization

Phase 2: AnalyzePhase 2: Analyze

Performance affected by:Performance affected by:

–– Line designLine design

–– Equipment reliabilityEquipment reliability

–– Equipment integrationEquipment integration

–– Packaging materialPackaging materialsupplierssuppliers

–– Operator trainingOperator training

–– Plant culture andPlant culture andmanagementmanagement

Page 10: World Class Manufacturing Asset Utilization

Phase 2: DeliverablesPhase 2: Deliverables

Recommendations forRecommendations forimprovementimprovement

Prioritize problems toPrioritize problems totackletackle

Contractual options forContractual options forW&C to implementW&C to implementsolutions with possiblesolutions with possibleperformanceperformance

guaranteeguarantee

Page 11: World Class Manufacturing Asset Utilization

Phase 3: ImplementPhase 3: Implement

Procure equipment andProcure equipment andcontractors as neededcontractors as needed

Schedule upgrades onSchedule upgrades onplant equipmentplant equipment

Implement additionalImplement additionaltraining as neededtraining as needed

The key to successThe key to success…… ourourPartners in ChangePartners in Change

Page 12: World Class Manufacturing Asset Utilization

The Change Management TeamThe Change Management Team

Woodard & CurranProgram Manager

W&C Engineers KPI Software Supplier OEMsOrganization

Training Consultants

Controls Design

Programmers

Packaging Engineers

Primary Packaging Equipment

Secondary Packaging Equipment

Material Suppliers

Page 13: World Class Manufacturing Asset Utilization

Next StepsNext Steps

Client selects two target sitesClient selects two target sites

Preliminary Engineering ProposalPreliminary Engineering Proposal–– Evaluate controls architectureEvaluate controls architecture

–– Analyze OEM processor data structureAnalyze OEM processor data structure

Phase 1 and 2: Measure and AnalyzePhase 1 and 2: Measure and Analyze–– Implement necessary control upgradesImplement necessary control upgrades

–– Install Factory MetricsInstall Factory Metrics

–– Collect data and issue reportCollect data and issue report

Phase 3: ImplementPhase 3: Implement–– Implement corrective actionImplement corrective action