world bank giving to the loans from chile

18
WORLD BANK CONTRIBUTION TO CHILE BY OMKHESH REDDY .G

Transcript of world bank giving to the loans from chile

Page 1: world bank giving to the loans from chile

WORLD BANK CONTRIBUTION TO CHILE

BYOMKHESH REDDY .G

Page 2: world bank giving to the loans from chile
Page 3: world bank giving to the loans from chile
Page 5: world bank giving to the loans from chile

ABOUT CHILE Chile has been one of Latin America’s fastest-

growing economies over the past decade. However, following the 2010-2012 economic expansion, GDP growth fell to 1.9% in 2014 and 2.1% in 2015, as a result of the slowdown in the mining sector due to the end of the investment cycle, and the decline in copper prices and private consumption. The unemployment rate also rose slightly, from 5.7 percent in July 2013 to 5.8 percent in January 2016.

Page 6: world bank giving to the loans from chile

The fiscal deficit increased following the economic

slowdown, the decrease in copper prices and the implementation of expansionist policies. The central government’s fiscal balance shifted from a surplus of 0.5 percent of GDP in 2013 to a deficit of 2.1 percent in 2015 due to reduced tax revenue resulting from weaker domestic demand and lower copper prices, despite the 2015 tax reform.

Growth is expected to recover gradually as private-sector prospects improve. The pace of growth is expected to slow in 2016, to an estimated 1.9 percent in light of low copper prices and the lack of recovery of domestic demand. Growth is expected to recover slowly in 2017-2018 thanks to increasing copper prices and levels of private investment. A growth rate of 2.1 percent is forecast for 2017.

Page 7: world bank giving to the loans from chile

The percentage of the population considered poor (those

who live on US$ 2.5 per day) declined from 7.7 percent in 2003 to 2.0 percent in 2014, and moderate poverty (US4 per day) fell from 20.6 percent to 6.8 percent during the same period. Moreover, between 2003 and 2014, the average income of the poorest 40 percent of the population increased by 4.9 percent, a figure considerably above the average income growth of the population as a whole (3.3 percent).

The country still faces important challenges, however. Macroeconomic management must be fiscally responsible in order to provide a solid foundation for maintaining and increasing the country’s medium- and long-term growth and for achieving more inclusive growth. Despite strong growth over the past 20 years, Chile’s per capita income still falls short of that of higher-income countries (in 2014, the per capita income of US$ 21,980 was still far below the average of US$ 41,035 for OECD countries).

Page 8: world bank giving to the loans from chile

STRATEGY The Country Partnership Strategy (CPS) for 2011-2016 builds

on the successful experience of the prior World Bank Group strategy in Chile. The strong institutional framework, stable economy and relatively advanced development level facilitate an engagement in which the Bank’s added value lies mainly in the knowledge agenda.

In a context of low financing needs and abundant access to capital markets at low spreads, Chile’s demand for Bank services concentrates on the provision of technical assistance and other knowledge products in areas in which the Bank has a comparative advantage and can support the country’s efforts to achieve its development goals. This is an important two-way investment for the Bank given that Chile’s development experiences of the past decades are highly valued among other clients and continued engagement should allow for important spillovers into the Bank’s work in other countries, as well as stronger south-south cooperation.

Page 9: world bank giving to the loans from chile

The CPS aims to support the Government of Chile's vision of eradicating

extreme poverty and becoming a developed country by the end of the decade. This support will be carried out through focused interventions in specific themes in three areas that broadly coincide with the government's development agenda:

Public sector modernization; Job creation and equity improvement; and Promotion of sustainable investments.

The strategy includes a flexible program implemented mainly through studies requested by the Government of Chile and a portfolio of small loans and grants.

The six-year Country Partnership Strategy focuses mainly on knowledge products, which are delivered through studies structured around a Joint Studies Program funded by the World Bank (US$400,000 annually) and the Government of Chile. The government has also requested the possibility of additional timely assistance through fee-for-service to analyze budget allocation and specific public policies. The World Bank will continue to mobilize technical and financial resources for projects in areas where its support adds value.

The main objective of support from the International Finance Corporation (IFC) is to foster entrepreneurship in advanced fields and to develop innovative business models in a narrow range of sectors. Investments target tertiary education, vocational training, infrastructure, energy and financial services.

Page 10: world bank giving to the loans from chile

RESULT The World Bank’s current program in Chile includes a

portfolio of two operations totaling US$140 million: a higher education project and a social inclusion and education project and a water resource project.  The first project seeks to improve the quality and relevance of higher education for students by strengthening the link between the financing of institutions of higher learning and performance-based accountability. The second project provides assistance for development policies to promote equity and social inclusion through actions that contribute to increased access to quality education, improved poverty measurements and increased targeting of social programs.

Since 2010, the World Bank has prepared 31 studies for the higher education reform process, the national water sector reform, the concession strategy for infrastructure works and the efficient management of the public sector.

Page 11: world bank giving to the loans from chile

International Finance Corporation (IFC)

interventions in the country focus on activities with a strong potential for development results, mainly in infrastructure, energy, the financial sector, education and agribusiness, with small and medium enterprises (SMEs) being a crosscutting theme. Since July 2015, the IFC in Chile had a portfolio totaling US$1.028 billion, which consisted of approximately US$694 million for the IFC on its own, and about US$334 million with other financial sources, including commercial banks and other foreign direct investments to support projects.

Page 12: world bank giving to the loans from chile
Page 13: world bank giving to the loans from chile

The development objective of Technical Assistance for Sustainable Geothermal Development Project for Chile is to assist the Government of Chile (GoC) in resolving specific barriers to improve the geothermal energy market conditions. By addressing key legal, social and market barriers, this technical assistance will contribute to the development of commercializable geothermal resources. This project has two components. 1) The first component, Improve policy framework and strengthen management capabilities to help mobilize Project ID P152820

Country Chile

Region Latin America and Caribbean

Status Active

Approval Date (as of board presentation) October 12, 2016

Closing Date N/A

Total Project Cost** US$ 3.50  million

Commitment Amount US$ 0.00  million

Team Leader Migara Jayawardena, Mariano Gonzalez Serrano

•PROJECT AT-A-GLANCE

Page 14: world bank giving to the loans from chile

Project ID P130378Country Chile

Region Latin America and Caribbean

Status Active

Approval Date (as of board presentation) August 27, 2014

Closing Date September 4, 2017Total Project Cost** US$ 3.00  millionCommitment Amount US$ 0.00  million

Team LeaderJanina Andrea Franco Salazar, Patricia Marcos Huidobro

The development objectives of Partnership for Market Readiness (PMR) Project for Chile are: (i) to provide technical assistance to the Beneficiary in the design and implementation of a Monitoring, Reporting and Verification (MRV) framework and registry; and (ii) in the design and preparation of one or more carbon pricing instruments in the energy sector. In accordance with the objectives, the project provides additional funds of three million US dollars to Chile to help with assessment of the viability of an Emission Trading  

PROJECT AT-A-GLANCE

Page 15: world bank giving to the loans from chile

Project ID P154213

Status Active

Approval Date November 16, 2015

Closing Date December 30, 2016

Country Chile

Region Latin America and Caribbean

Environmental Category N/A

Team Leader Carlos Rodriguez Castelan

Borrower*** REPUBLIC OF CHILE

Implementing Agency

MINISTRY OF FINANCE

Total Project Cost** US$ 100.00  million

Commitment Amount

US$ 100.00  million

Tertiary education 50%

Central government administration 17%

General education sector 17%

Other social services 16%

Social Inclusion 33%

Education for all 33%

Social safety nets 17%

Poverty strategy, analysis and monitoring

17%

ThemesSectors

Basic Information

Page 16: world bank giving to the loans from chile

Project ID P085621

Country Chile

RegionLatin America and Caribbean

Status Active

Approval Date (as of board presentation)June 7, 2013

Closing Date August 15, 2019

Total Project Cost**US$ 63.86  million

Commitment Amount US$ 0.00  million

Team Leader Peter Jipp

The objective of the Sustainable Land Management Project for Chile is to develop a national framework for sustainable land management to combat land degradation, mainstream biodiversity into national policies, and protect forest carbon assets. The project has 5 components. (1) National sustainable land management (SLM) framework component will: (a) carry out of an assessment of the potential of the member country's existing agriculture, forestry, ranching and conservation programs to be part of the SLM framework; and (b) develop  

PROJECT AT-A-GLANCE

Page 17: world bank giving to the loans from chile

Project ID P130378

Status Active

Approval Date August 27, 2014

Closing Date September 4, 2017

Country Chile

Region Latin America and Caribbean

Environmental Category C

Team Leader

Janina Andrea Franco Salazar, Patricia Marcos

Huidobro

Borrower*** GOVERNMENT OF CHILE

Implementing Agency MINISTRY OF ENERGY

Total Project Cost** US$ 3.00  million

Commitment Amount US$ 0.00  million

General energy sector 100%

Climate change 50%

Environmental policies and institutions

50%

Basic Information

ThemesSectors

Page 18: world bank giving to the loans from chile