World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

112
14001 (1996V-12Xflt*) -ILE COPY 1997 5 A 94Pe21 6A/T- Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

Page 1: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

14001

(1996V-12Xflt*)

-ILE COPY1997 5 A

94Pe21 6A/T-

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl
Page 3: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl
Page 4: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

158 `3

* (CIP)R#

S FAXewt MFeRieR**/Bgi - tS:*

1997. 5

(:ff-~it VAg H M V,t ISBN 7-302-02475-8

I .g ... I .# ... a (DA [f l r3t4Ft2i-va0-ImW GD1WRF3W4-pgw-9 TV. F831. 6-62

+Pl4*Mzt&WCIP ft-%*fr-(97)M 06630 4

1ffl)Wl: M*t* Lb ,VCX*tZ , ffg 100084)PIUM:t **$Q*flOJF

F *: 787X1092 1/16 fP*: 7 !r-f: 1351

£ IN 1997 &f 6 * 1 )K 1997 4f 6 q9 1 &EP10

* 1: ISBN 7-302-02475-8/F - 146

p t0001-3100

Page 5: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

1995 $ 1 R AfAi ((fAt j* -fo-*))1996 $ 8 )# l )kffiA t* *9 +t

Page 6: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I

i

I

Page 7: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

1.1 H- - ----------------- .................................................................. 3

1.2 -ftjfuka--- ............................ 3

I. 5 1 f tm ------------ ............................................................ 4

1. 6 - * -......................................... 4

1.9 gg j JM 4 w .- - - - -5

1.10 t ......................................... ... 5

1.11 *,A ............................................................................. 6

1.12 ..I................................... 6

1.13 SjX3R - - -......................................... ------.... 6

1.14 Xf, ........................................................................ 6

1.15 V W ........................................ 7

2. ...*t* ............................................................................. 8

(1),,)Fiq *....................................................................................11

2.1 WA.................................................................................... 11

2.2 r.M t VJ - -----.......................................................... 11

2. 6 .fT............................................12

2.7 & pJf.----........................................................................12

2.9 ............................................................... 13

(2) ..t. . ..t. *13

2.11 A ................................................................................. 13

2.13 A Alt * -- if-.............................. . ...................... 14

2.15 i *------ I...14

2.16 VT-, HA Of- .............................................................. 14

2.19 j *-------------------------------------------------................................. 15

2.20 i61t--------................................................................. 15

2.21 4ffr. *-------------------------------------------------.............................. 15

Page 8: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

2.24 *4At tt ........................................................................... 162.26 p........................................................................17

2.28 $.ffiRZ ........................................................................... 172.29 & 6;j ffi ...........................................................................- 172.31 ) t ttt,gti§ F t *-- *---- *-- *-- *-- *-- *- *---- *-- A- ................................ 182.32 . .....f.. l.182.34 ..................................................................- 182.37 AJW J ........................................................................... 192.38 X........................................................................19

2.40 0 it M -*, iM ............................................................ 192.41 ........................................................................... 192.42 ......................................................... 20(3) Jf j CT,R t f' -MO............................................................... 202.43 t£I ..4fbj . .....*-------.--....................-------------------- 202.44 JfVRt. *-- *j-- -. *-----------..-----..--------------------.*--------.20

2.45 Xf&f1 -Afl W, *-......-------------------------------------------- 202.46 g.t .............................................................................. 21

2.47 t.f;T st} n - -F-............................................................... 212.48 X 4-T ,bT i L .t. *........................................................... 212.54 P. p,. *-- *...........................................................................22

2.56 *.T£ A f.M f t. *.............................................................. 222.57 XfT£,,k n gf 4 -----....................................................... 232.58 T.*- - * - -......................................... -. *----. *-----23

2. 59 t.i^.fi.fi£h.T *.------------------------------------------------------------------ 23(4) . *----------------------------.......................... 242.63 4 ..................................................................... 242.65 ........................................................................- 24

3 .. . .. . .. . .. . .. . .. . .. . .. . . .....................---.-------------------------- 253. 1 ,A 0r --- ------------.---------------------------------------------------------------.---.--- 2 73. 2 ;W)jC(LIB) ............................................................... 273. 3 j J. ........------------------------------..--- 27

3- 5 A * (-TE WA]---- --------------- ----- ---- ------------............................ 283. 7 jE ( >K) ............................................--.---.---.---.---. 283. 8 8 I-- --- .......................................................... 29

Page 9: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

v

3.9 A IK* PI#LflAA -n- ............................................................... 293.10 jF;CA It A ..................................................................... 29

3.11 .*tt ...........................................................................--- 29

3.12 mIW11k #t4R An AM& ........................................ 303.13 jk*- 9A, X- ff i " (BT) t fpr* l -E..PA.........CA............. 30

3.14 T #N ir Af ........................................ 30

3.15 M:4----------------- .------------------ 31

3. 5Ei .......................................... . . . . . . . . . . . . . 31

ffi t 1 . etg r "T *--------- n f ......................................... ...... 35eff i A 2. Pi t LK .............................................. 3

fffA 4. t . .............................................................. 41.33 FM * - ---..------------------------------------------ 44

.Si44

Page 10: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl
Page 11: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

#Rnrl et I I T1991 *9MiqrWih&fi 4(fiAVIT9,Mllj F] 6-1~C X-tXX *)) ( UTs"*" A# -- * IRrr t 1Ml, 4*1993 * 5 o A-jtt fI-( P)-"

PM X)ROT-IW"E" 6, rwa"*t IfA-A*A)KmX w- t 4A

1995 4- 1 'tllhiXj" f T ' } j tLt

1BO :LfTt StLf4S X4flHt SBD tGlH~T h A tRW Ifi3 fli, J Me4 B. t"t*"TO, SBD

4i 0 oi A ff" SB D It - jj,-i S Af i TR[Mi f IIT ongf

f , 'j AVT +;T-,a4VL fIA,"*Efit< 5VMLqR [ RffiA At

C42g"X;*"b§4t, MAJEXtS.atHo #XRgb9S,2. k 19 96 V- 7 A8

1 Fi X, N At[t IT ,;talH rp 1Xix 4r-pl",ft tI T @ IN /T lBgPl eQfJt TE, 1

1vT R EW" *"tA+dtM

m fI fflJ tiW J 1M:HaA f SB 9 t ff , 6Xa ¢W~ Mfm akAk I T, X2 +t-7 -I *a jg I]«

Page 12: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

oT~

F 2~AdE~2{LV ~44~ Hi i& E fR tit & -kA - tA U

E 1 ' ~"tJ*" hf t%4aA"ttk(it"N P#M4'4 N

/ I A 6;XI 1 Mr*' 3- TXV (Thirkg ff OX & AdFt

gtAM^gXtL1I"at,6X¢"W"AMmAt"fleoRAtht,gHJf 4' on t m / r o fI i -E

R~~~~~~~~~~~~~~~~~~~~~~~~ v X5ff Mzl 5fiff tHgA#FAEaJ A 5EE@

-Al VH. s4 I ASIMIw6Ak.- 1X1 laA; nF g tt MVA 18flF R-M xp-tl

tht, Xt#RaltE WE§$+ntXn Jdiiyi E% J4A iE+ 1n

hfl f A * ttiw::>: tZh@ I w;Ath rp] tXg 4fit,i

Page 13: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

1996 * 12 A

Page 14: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

iI

Ii

i

i

I

Page 15: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

1. a

Page 16: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl
Page 17: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

1. *3 3

t2+) c 1 _{Xu 11tt g H EsA [ IVi , I (IBRD)

1. 2 y$f} , &-f *f " 1,

(a) XtA4 AgtEet+ aTMto"

(b) 4{t fltf*

(C) We% rT ff AYA, WIM, ~A fK it R b*lfp, -lk ltlJ; $1 i-. JA;

c 1 3 tiP ,b 9 " .I " ,it;l l,tl!S iilQ< il<glW lll/o

C4 3

C 5

c 6J ,, gL6&

Page 18: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

4 M

J;- 3 V N *,%- 9 /'T, n *, 4 M T N fiM 3A 0 t,WA AtL-Z4 d &T, g~j+9TV*hk" ftZ -Mi;4,$ttS r±

1. 4 NT51

R, itStb f RE ±J9RE T o W:tST tSA

1.5 fiS,@Rtft 6 PSl5t o g Km*Z X , 4AVT T,[

fAMf 5e mHttWwWt n op t+T CT,M

I IT ft TtA141 it \ NAeX+ B*Xtt H, EX I]/R X n O E ,r K

(a 9§ ) YDRCfN *ZAq)l 8 Xt4-:1 1 H,X5 1 V. 0 LL g ;

7 ~~~~~~~~~~~~~~~~~~~~~~~~~er

Page 19: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

1 . 8 X Fj&§Jb l

(aR ) -'>h PE -5 / t 9 T a It A i0 i t 4440 vl PI T- --IlJ "t Wf E - 0MX #--A +1T

HpIEE# (,A~ Aq;6i) t 0 in. -iK A C'A 49 ,t,Xt 1 iXt * - * 8 LB

(b) t hi;#}kM$hI@I*4EFlAt5l Iff, i at j-imwft n -m (iX,@avmta#W*N3tiTv ewXi tm ; bSA

(d)Rtt/§ 1.k t R A 'o

M At !Te lm'kt (ii) kt'ttt Lg N 2

1. )R *+-tl T A nt -f t tT 4A 4,MPA -T9L* !T t tfl--,- 0VI-T ~

t~/-Tz T -AAITt/ )U M 3 MA 113 f0 f KAIMY,gMTl- r1-1 A ,-~ 4:

- (0 ,d),V Rf ~ ~i A I**1 1()£T@ Es t*Ti %, z R 4 ]AAVrPf-3! . R v FT XiE

V -0 9M AX 4E p u J# It A- - HE / A42E m M @e

Pb5 tA 0 A g fLNCE 4,,- Afn*'k-i V-M 4 lt A R Oe4Rk A i W P AEA 1A f*R6 . wr I i*p - qa XP- fFi n 3yt$1 i iK f* R9f C;T ;t4 T, 11 gA -E Dt °

tB^, cA It, f t t M 6t S*g .

0io 10 5M;2.5&,Cilr M3.8&cn j!MM# fffl*ViLW,

Page 20: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

6 g i

1.12 f _

(a) 1 w;(b yl;iffi1E, A1 1 ':"A ff 413 V f14 T- X H } M 0lt

1. 13 H 3XtSAMtaXtWIJEt

IS +t X@ SR t 1 l 5EI-- l 0 qff fAfi-ffi VA -FifIf"X

W5pt tX4th,4i x442{Rfwj tA}F'X" (f-C1t2) A 1ff 4 4(A 4 T ' e S , A

tbt~~~*14 [9ftA, IV -t A ff Xf Xt -6 -t iw- A vt ia r)W a, it"SA I-t n - E9 N Z 3 * i P,* Mt *, -L* Hf nVR OW iL A, )lqJ W )tf l-q* -L A

iW[WP rP A flT +XI* L 'I, Ac;Z ;Xf 11f P Ji l n I9f fP"to iW-

C12)12

Page 21: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

7

1. 15 .( X-11

(a) 5

(ii "it~i4"N<tX"B} W itR

(b) If t RtT, 31i,, rp]ta ee 6 tA fe

(c) W ,~Xt>;tMtt n;Lt*4*vX

At Rn i Mt, ff f"iVkR A RRt AW it- On MT tAS n -4 J i

(d) R*§ifit2

(e) A l fQ * jE@Relu tAttWgMRt ffi Mrg4@9?kf0*~kJ

ffe 11 I) btl -II rX llpX tA 0 EJ twxfni t~ htH4

Page 22: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

r

i

i

i

I

Page 23: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

PI 0

11o

I~~~~~~~~~F

Page 24: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl
Page 25: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

2. 1EA@tE 11

(1) ,s PFI

2.42 1,4t x-4 t tMt f {HtiX

~~IiQit~~ ~~ 4111414f

rp V to it51T IEM n Ti ]A )I FnlMTQ: * l iT-> F e gAXa

2.4 A* Ttl To

ti3t:IW5M§J&f~~~~~~~~~~~~~~~~~ WA Mt- XIfo C

2. 4 ±Mfj-, TnV fn Tt -L V,SatR v MP] ti.1- jX -1 At4I W

T v i -f 4RI -*Ag.p ME -All-rJ I p4E V itf A To I Vit4 a ' n f 5- c R31MI-t7-'u V ftl TF-R ± 1T ,6A P-I M -t M(u X'l4 t FE- #A

A, . XAA4A -pif +XI R Q:i STRIt i-t ifl IO X H 91DA ol 3AM5FW N 0

C131 X*l1.6&

Page 26: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

12

2.6I"t¢ t muJXto ikX<A

2.Y~ 06hLTi * 0, 0 v , JfE IA A

~~~~~~~~~~

2.7I iRt@A Rif t fT, A w6I R tO4fftM

k)~~~~~~~~ X 9 f/r R i tk k 0 *fl ff i t, I1 ge It VPT A +IXMtTl3KN nn1 t MTE A T f i£ iWf g/:,fn t A 8E%% "iEb f9a*13 H -I, 44 9l 5t$K it fif -- gU 9 4 O/if

C # 118)O43

1z6S 3tHi§R;g-aB3Xt%bSlR7gtiRtiW~H N>§188 t o -IIMP:20433

Page 27: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

~~~~~~~~~~21~~~~~~~~~~~~~~~~~~~~~~~~~~~

2.10 _+0AttWtXa,t4t8

m FT r i t A4 WoR * itn R *t 1! t ̂'!L, rta -i W_ f :v PAiM Lk.AM .~ FrBL 1oIr4]ft4 AARCT,WtAE jr1u",A Wtt>tc t

2.7 W<XeNWE#ttStI #P 2. 8j1tEp2°j 0

SWitMet@4WWg S, ijXkS a.2.11

a -i*tz AA L l R Xt 9M1- AI n Al la I4dN2 /81 H" 4 Jbt mi Bri w AX, ~o t--t

C21O

2. 1 0 it 4I,% 4 { )1t SUF.T W. A rFM2. 7 2. 8 RKNU+AXo<tMXt%t4

AbtlR X WEt#e;X-&tX6AIEl<El ~QtZ;X ghtT W1E 7KER W&z fn Jf

Af M XLtXINf f1pA aRV, FffAitJX*at6TA fpb' W Ak -R

2. 1 1 TBt;T,6tX M t6 g --Z 1Iaa fA-:iF f

A T " f MT- M1 .- V iA I,BfT"xI- A IM 1,6-9 fT, A R ';f) ; aFX Gt, -t ; A; pHVix;-" P*;W N MA f*t *,Ak f fl ,, ; *AL, q flRI-; 91 VA MAW-m MgAV

ci90 Q*2.43f2 .3 o[20) Q*2.g54&Y2.55&~

C2 1 zdJXf, ri%ttt2

Page 28: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

14 T

f S 1,-~ I3t oAM2.12 A

2.13 fA' klk

2. 14 7tMT4iffi- R~ &fVT-, WAgX!bX pg ,Xt

4 R,il 1tT i* t6iiE Ma>t& i&bktA R 0mitW A *X6 Tk

RV A% Xtnilt iA6 r"]M FtiJt o: -i irm;jELA

2. 16 )f;tTiS ii21itit 56& ;

2.15 ~ iE~ Ifff4g, t m't fifi , g

tSAis X~~~~~fA JSt- M fi!F f n ! o EM IV, 4 11f-J*-VWO S Xift M A m S0 f

T T A iIA V it }-;Zj -44 RI 7{ij{ T * il , aA I 4 k5liS at OhIiO n I

O,'X T$b t A

Page 29: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

2. 17 T,"'+'tjBf;T74t$>, islFd it,S ,kA

2.174j fT, R &0X9 4 M1t>V1frR ot W,, * ; 4 JbI fnj if t f;T,V , A

9gh ff, 4-1u --k I Ak4 iA t&wA4X tAR pl VT,ti o IJ

W~~~~~~~J * I:l&,AR@tt tH8 Rf fH]>% &t, a A kX Hf

2. 19 :fig AWt t t S ;tN

2.216ti"M< t>6t2 TtI H .,Xi'S

Page 30: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

16 MMfa@tL24

vo n i4 AR;A LlkIt MO 94K*, Anr±"AW"1 HPIM-, Zj-gWRIQfT-,,kiqt4-9KM *F -Afl4ft gE

2 22 _E3Li& AHW T I f;T£ , 4 ' fQ t % A WTfI

38ffiteMi@^ga gt9z' pW tiE{09Xt&,C25)

2. 23 ,t7tcMtt6 XxtIte-+4

2. 24 t;, ti3j (j)Nf;Rft, [f ; -R (ii)

It! A M: 1 8r) Albert 1 38 75008 .CIF -,*U W- d, kPAiE

- M t- X X#b 0f ( * h i k T), tZ k9-1T m 1 f9 o A

C2 93i~ Ill FhE )m v -*f4iA

F 25 1Is_qti£ q JR 3; m l VI ftV1)f Ano (<1gP iib 5k p fi).fi TA- 4i [is> E;T-1-'M1ki'~-!-A - VM,fi-,H R ,fn f o :,', ,IfXff42eX t 0, M, x- r'6geivM; o-

lA f 9 a l fi& Ak 11E IbSi

C23J~~;j -j " M (EXW ~ ). -W,f X' T,J fl.-Qft )2, iXF jet 4 W4" 4p iW,e

Page 31: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

2. MEIIIS 17

2. 2 6 TRf, )Z4tiit A gtA9fft2.21 r-f C_

FOBA CR t(ff 4niWt' fl+L At 3 Ti FA,

a #,W 6ITE , ffI;kT-UL t A;_i6-S iXx 4iX f9 2.27 4U4JfT{X -4nULt W it*

2.29X tg{+,'ARFH 2. 21 &gYI CIF( H "A)AI( f t) if CIP Pl# WrXe FO( ) f*t ( H 4')C6

CF. fftIN" PR

CFRo flEl TX6T, SJ&t;T-,T# CIF2flCIP J*,EfHVk-PlV, FOBCFR +4iM$4gg(-);R fl*JTet4

FOB.R C CFR ),*> of. fInHl' H tA T- *0 W -rl iA 4% , fA k -. S Hloitifif H

E4XSJ AX n -pi !A vm-i Atg A 9W1- fi -1-r&S; fft *A A 1b am 4

2.28 t6 W a,; gettb ALA ,tW t6

p1t2. 299.3 )tf()i&,Ag&,6 Wt

C26) 'CRk/'94l* Rt;i)e A NS t6

C27D M §G A 7t£,.Xe EX?af; ii X 8;

b928D S

Page 32: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

18 ,

2.30

XXXiSTR_9mAA#tFStffi XaiwN WWWR9+At

$,'11"gititit Ltt't

2t.3 _LVVUT2t-ff Tffi A

2.3414t± ~H ~

A&t#FStffi ) o ttAkS$%AtSX-AtSXS(an tA@e)_fi - p AX

(a) ~ ~ ~ ~ ~ ~ ~ ~ lt L QC)AA

W&, A IiC$8 X 4 W M f H m T-A 1- U -9- + + , 1A PEA R M T 44 -E? , R 6-1 FfV

M~~1j4 4*+4}'ft444H

189 1

2.32 5 t ; + F, 4VT, ffiy 2. 33 ff% tE#Fffi~~~~~~~fif l R VttC$t6tT,6 AKti -. --JZr -*,6- e t-f4

2-F l 34 I-It;wffl 5 f* A ,) Rf; A$AR+Tl Wr ~ItIW i- L* I lW r y,R;T tM _f

(a) TA M MtEJIA¢ Lf (lab§S @I-tg ts p It

Ad0Cbit *iR TF 2I.- , TEA- 4t X f, t+HM n

(b) AiT 0EA',,X$ -"iX,i*W"tA

2.35 ft+I|0@ Jt9f88ffit{1teg8

1ttt"X~~t ME V M CT, 1- F t. A tMZt

2. 36 fl1 !22ti¢f 4 ;Atb,t A 4 N

Page 33: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

2. rnAtt 19

2.37

2.38 _ f VI,,,' l

2.39 Pn{IAM9 M%AW, k1diM@X =,fLI' A%@i tAg

2.41 _gFfo AXit

2.iI eRI H 4,P- k "-non-WAf1jfilk tnp*ffiWr M w

2. fi T N 39 ra ITit-gI px T- T, Wt ftig+ wt

Page 34: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

20 N

dAmo3F*mmva"

2.42 f t

C30J tEAtERtoS, M ARtWtESEt

itI^M wt-n , V/Tft§ [M Itlam f P'XtRffi*A"~~~# b9f@J RAIiLTTA-W* W bg g5$ZO

2. 43 &MeWX't2%ttgt*w9M

A fl 1P I A RA ' M E AibltAB6r09F3M ltZ i VT

RlfI05X ;Jfittig8 & o Xwii AAP#fl2fa&;gMS

2. 4 f fTo ,R ITi- ;RRfrIt p AV tAlv:310 f)T l rlJ~1if - l-j

iE7iJt~~~~~~~~~~~~~~~~;, f T A f af

2.44 i^tw641'%t4gl 681'8MttXC3°33 F/4',, e T,

tEEtX6ffi+ Tj I/to .1URA AtI jIel I* inA -*Ri A 4 itz n i iA f VT

2. 45 M t 0* 2. 61 0£ 2. 62 t£/W2T ,7-1 *-I4 j:MVT kA: -fXziJtE

C29DM§A&,4oXAkgFXt tkpAt6

C 30D ," &tE X'tf P1@t'fit @ 1*

Page 35: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

2. B 21

2. 4 6 /ff fTR Z -U I rP fTR A & f np; -0, -'j R t;T- n AA

2.47 fii,V 5tW-TT\ -3(i)A:ft **fM 1.6 R£,,tbn

GO A fi E ,4 it-l0 j" , n IGO Aw RMf,#j:#* g tUR if:i, (iv) A f I TR ;T-,)z4:

3tAEt T iTlIt n LE t

2 . 4 8 i$T fT, 0,f n tAtta,tig A ItkT\nKf ;- 40i -L I , I A5 itw64XtA,ttA*o T 2.57 Ifii$fe*321 nR

2. 49 f4;{JTfitl-j O fo f

(CIP)P) fnA fA\(Ex-w works) s)W,t,4

2.51 P, S#,,2t% tit6@tSf4X

4lanZE2 *{ 0 X4tmZZttFt4WtieXi$,44

T * i R A * f n -VT E evit I 4 0w rn K n PT J A i I NA l Al-WbiI n A @ 1t

gI;Wtog%31 l 2ffit,et6 tAE8tMA

rlC3211 hi i * #6 - t

Page 36: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

22

2.52 E

(a33) V

2.56 V ,~, ~~4W49

2. 4 t g NCXt< t8 5UAX AEtMP*, n *,4f T, igF 4t 4 g ,Q5#-F, - T, I-f n, TS 3FFq'l T, - 5- M tA 0 ftSA °

(a) 53 LtAE ^@iftit6 f , nV a0I jJJ*V- n [A t I]InRVA 0* CT,Rf -fgt -TA f

XI 54tl4 !tAfXw k+@g,51!W -ffif l6Srb

23 55 M (L .2,5

MT2~ AFM ! 45 14 ; * ---A -t §iF &)VT1Mk & A &T,IR*(A REtWSa A-, R VT A 4.UkA tl:J ,*> fiA>% aT* L_ gP!2b9t, 1'H AX4 o PL r97- h~

2 C33)t£4W sX!i806#iFjtttB Xogw4 C34)9Q JIttX 6t 1 t1 9llXS Fit£i7f;

Page 37: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

2. H,t4 f; 23

2.57 ,

rBTTl)z4rpAEl5- h4 -a t>AM -1)\* t i A L V,4tffARf;-IA*t o ~ RA# I a TRf ER'I A t T -t 9- 01 JRA -PT U- * RT,As, A &ZtEt +iRM JT0 l

2.58 1f J,i ' M,t,H AMTTw6EvZXi P ZW*t6ttA#XRGi) A Vi AAWft;6T353I,

2.59 I X_tiJ O f , ` I R t, A

U- A I b# 4 kf ~t lR Tlt.l n-l&/ b9§ o fill ra1, -tt

2- 60 #pfifitFSXitt 5EttAt 011-t"f2.60

AX3;5X18a1^8itioW PTN t 4 W A W4

2. 61 T J .F 4, -JA4 E f, n4 -fi F 4- F, ffl A & T-

-A I f ERiZit A A-A.-A , flan ik&, lf : l ;Xv M a ff A w f (RV, ) Af wW5

_ARL K-1*VMAOAMPAs VT t e %2 N1AM fi' AaA

X4 aklf-A4 "lmMtr

2.62+~ 4 n*E-ti Xt I I]

Page 38: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

24 F

(4) 1l IF

2. 63 f49:i ti L4Q^ 1 ic14

2. 6 4 IMI-r EFtERfig tW -6RS>ak +o t

il)OiWg; fA tfl T ! J11Z f YSJ A J~ o ;H pg a ; rT 0 4 k b;! Mt 4; I wJ 12- An 1* + -A @

2.65 _ iTffr , i 4.{LlA 9

BWtRee f;T-I? -f11 MP iXAth t-tM A h

C36D .2 ~A

Page 39: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

3. AA,T

Page 40: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl
Page 41: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

3. ttgtt ~~~~~~~~~~~~~~~~~~27

in, ij

3. 1 A~ht'*a-F, SFtFTfffi<fitRAX

*fPM9#-T,(LIB)

3.2 tIW,6R-s/ejr mXX*t6a-

FI-V,-w + t +9 T,- o tEg R, 6-,f -"'An3 A < A , iX t ff+lE WE L , (i)hrp a Vi,/I ,, i)AA DPHR kt I W, ;( Gi DAAi i)4 t*JF 4nA -T a ,H)lT'-Gi -kM

[AVT '-w 4T,t -G,6 a X R i e P-i i W]A n-3f; o, RStE VE,-r -0 I, f IRM k f- 'A'A J 34ti@FEtMACt~~Aml'l*r4*Rvr, NaffffKA;h ~MM'A)M

WitXcat4tWffigeS GO --L3Tw)Me*iMtj'-AGv)-RAPTV

B'2C37'ttWRL^X§Stt<tA

Page 42: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

28 Hi

UR a ttSki 1K oEER4ioPPAH vJ pi It $4t aP Z H rF1- f 0 A 'Al 4f

iE3. T C fA itN$t /M; 5b9 j9X -"r T HpP tgEi86#< 9f Y kA PFJiR A n

iT i-E 2 T h V

ttaXFittE< 5ikMM avSsMPoetut6

Page 43: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

3. A 29

(a) ittit &RRIZ

(b) TJ'fli 3t, --- iA fATit i1tEx h5 i : T IS )Q tI/>A f iL U A n MS

(d) gT- "fif t T f PP VT n TX1PA ;;21' N 4fl - I

(e) tigStStC J

3.9 '*lk

te, 48XfgtRR

3.VOOO N 1 r I tEk *AEt [AIT 3 gn O< S>g rl tAIt A Z 3, IA It A -,Lbfft (& f Fl i311k) Hu fl%$

{1atttegt3, t 7eAfP'&7,O ' {ff7e' ~F5f

IMV t t3 8I KA0iEr aiW5,i t4 l " V t tAit 9RV

C3eC

Page 44: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

30 V A

tetet[~~~39) 't 6il6 T t fnt &t

3.13 4fl x-'>jPBOO -~[BOT yjBOOT 4 0 j~

m~~~~~~ 1' '1' T{{"ifJ

'tt VA*o Al--' kik0 i,R zA, V 3 Ttt §1'1 -T A VJ, i'AG tl fS A WtN

t@-i-"2(BOT)~~~~~~~~~~~(1 ;3Cl14l1# A

(a) BOO/BOT/BOOT UT p4 1 1 4

C4fl l fitie,Mfi 4F{A$iE,6E t RW

ONeA +tg#>t N W ,$m aHK n)f- A i!WMVtt&IMJ-l r41 OL, * T, 0la4t 9t -InA L'tW %t;T-,*' : f Aff )l*o

(b)~~~~~~~~~~ Ehig@i, 3()KJAl93#i&i#Jgl A-LL

3. 14 tXeMtttfX tAAt

*. f fWflt J a3 -c 9- Aob g2A tLgRS * t A f44 + 4t .a f *1 f+

C40 BOO:3gj'X'9RBOT: gi-q lwWi

BOOT: gtit,f 4, Kflfl W k

C4 1 )v 2A>0isf>w[+*:wXg

Page 45: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

3. t 31

n±itett,><TfiUfi llttggwJ,>>tA 1.5 5

JEo

3. 15 S4 4tt^ XS 4AtSt

;7g@l434bttomA(ii) AJ t # LK tf fl/.RA ift R*Ab l -j .R GO I"tETX%1

1997 $ 3 A 24 El +k AL 4- -,AgikT % 4q

1. 169 T h7:

"1. 16. AXttXSCStatt'tu&wX

fA- t I A w iA . t i4t # K A ft AtFt + la tiV -r-PM fT\ rpt

Page 46: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

l

Page 47: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

Fn

Page 48: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl
Page 49: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

35

FI1

oSl Rltflil IT * A ki f %A *I-A11 * 1h mf t 1 x ( ; t aV_iAtll'eXM :

WXJ7 AAXA-LE 'AR11P@,At FX@A W4To

(a) l

tsXE 1 AwtW1EN gi Ow3 af l1 A t iRi k1 il etS,ffiE

* 'ubJi1taAW1eg& 0 e,Anf1T&A_*,fA

(b) AE;6 Ifl'64 4 'E' X ;&, fp'(XEif88

*f fTT, M TT, W; VJ ± 3tt T ,V g-R Ai0t* Z 4 4 ( A A 'i -fi5t!) 0

MAtWAsK%, i4*At>601XSSKJW~x~JM -k

_)ft)IM 4 f g 0 tn f tM1A MCT, AALbMIi KotfT, ¾tff FIv A TAU IE 4tE4E MA O i,-~R7ClWtT r ±f~fiI PnI wV tt

(c) T I,t P,5t 4 k : l RfTI 1 I -W fiT, 4 a A v fiiTt

0, A, fih tlkld) - t&tW $11, G tE X b lVIT t At fc * an A

Page 50: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

36

4ff WtRu A AT, NU- "ETA- A UPA"fl, NCXk iAR) L

(d) tfitX X t6t lz4@l3Agw>tttolb44VrTo6ii n tg sXgtBJttt'

(e vi-TPn-,rb-t 1E1 o vfz4T ma zmax ,ko9

-tWAMMiD rpnfmVI*-aA@9,lnLLAXHastm

tAEiE-nrnp t 0Aw= # im -wRimS,rPm r-I 1919-1 -t ;W;kVa OKP 1WV -AH-E--PWp 0 rr k .P l

~o

3. t+ -a-nif-eeV QAAkik H

f1f 4RtA-f- ng* Wt-* . A E$MEtSZg

vi *At 1 Sff--trn Oily- &ttTttS gq ra AP i+aA3 Xt -

4- 35 T ;` -"ng 2 Vkf-;A?r6-tM@ S t -

ir tA G -- tmt, rp-YJf no wn- nmqI*-*, iiPx-ovf neAl'EY

&f AX RJ*R4etkb21411 4r_AViK nPit¢¢AX3tWASt 0p VJVjEr#j*-,

tTmC42)EC2FRwXCe1WXEffwIM'

Page 51: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

37

5. n- MffXi S n

%4 3 C43" t* *gfiO iirff 'Am*AAW31fi -*r

an* rpJi 4*rR At rHT -tttREt

C 4 3 2. 15o

Page 52: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

38

2

2. t,t9 {t:(a) A f ;T-,

(b) B 9: I [ [A N n Y, fih-L V-(c) C l:*: N#E* F g#RAn4A

3. A ;&,&gtdig@RigtES"S;* AA

$gBt:Wg44tE ItM1/EttK811XtKo A «&FAg B &aX}It.LMx {JAptE144Rt 0a9* C aF<MXkttt CIF iUJ fA

4 g~~~~ tn,*ffiTt;TR * f& A n*ft VL$ M,)ri kl2fA- A

5 ,u h;iC 4 TO 8 C

f CM&,knb9l ri9i,k C RXf tblSk1g g 1(

Page 53: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

39

h S mC IweCF fJfr CIP &t6t45jE15 0 o)

j~) , C A LVTbT fJTW * I& A f f1{- VAiW-LFtaA Et&Ftiglw6eX%i,ttA@~~~~tt O - -- M; at, )NIIIJA- A j!

g 4 Q LVfAZn' f C MnAffii**nRO

6 _fl "_6 p t@1A,nfffi teMtAE H _A-

.*i P" Fo thlE rPe[ PAtS5Z T V;;R)ifiM@$J i(a 0) oCIF*gC CIP kJ 4

RTA i! *A r i F CF g ( M t- fn -t 0 n WW A EA ILM , tL An iik t, +

,R fA-;6 b f# A fm1; [A ViR 3$ 0 - ft &t T,6 rP n C IF Al C IP * M , ft h nLT-1-1-K'Amtna 11 ANMtmK t I A-fftz+H(15 % ), vjfv t

7.(i) A : T 4 T, T, M+ It r, 17, 4 VT rO-& P t-L,4,, B _(7. 5o 7) 50t0, Vt T 1

ttW tXtiprgl;ff4bgJ $5~~~~C46)oAts8EikJ J2

(b) f "i tAt 4 ]R f;T-, 45 n-`a -T+T, ZJ", TA-4 4Ann f- t ft~, R T, 11 wftf:(i) A 9 : t 4h 9gM -I-S P j;b§ P A N JAb§a 17 6o;-,GOi B gfi t i:A tt

t MT)j,*-flTRig IT WL* Lt!O, Xf B 9tO*fTR,A-tutwf TXAR+T~ff 7. 5 %

CW

Page 54: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

40 M

1. ;1R H tZffRttt"g S tt +tIg ffl"7V

2. 4 S E ) p Y

tA7E3V a tE I*t9ItfAXiiZWknMkFP*bA1tSSbJ9

ffaA A tt iEI ffl 1-7 A- i n IIffiFi Xtt2. 1,k

vh(Sx4iIEa$3;g5/X9XA&S4X{LkJZJEF

t .t Es IttEtt,AJMVt

t" t oo~ 33%Xtt§AMX; ZXaJ 0WM$(t

Page 55: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

41

4

1. 1. 2

2. i 1.2 &9it I

4k&1,6< itt,ei¢&J;<lAl o -n ItZAXtAW4ttAtT M lA & 21i

4_ - 2.12 ATTt¢^~~~~~~~~~~~~~~~~~~~~.1

3- - -jEtn$* 1-, 11 QA@ it>geT<tO

&t,6tiRg-n , k1^iRXt,wtb2@EKStRtMtte1. 15

4.PM(8%+tE x3gt **

NormttttXet X ,Xt(if*5. Dg F/T A J@+tSff i4X3t lEl r: RJ 2. t*t* 21 R)W 3 Q

Page 56: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

42 NPTIAt@tXf@e

42~~~~~~~~~4

81 M, JlRkt Mil rp,R4C48 iffRBi ZV tt S4p1f'o '@,@ -f fNAE'- .,r L

6iEAw49ax- 0t6 * RiJt ffl w]1t-, 9 4 , tA -figf Uw - *R ;, 4kAP1^tJn-R T A Rw- di§tXa72 +14 1 AffAiA~4, T, 4 I a --A tH I; l olA Pi -RI ;h fi

A+p1ag, R*WRt%M-Ft AEFt3AUTMI4l Rf;lkAo7. A AIjffl u

R,~~T~~c4 0 T- (f;TfP, -- 1- 4~IhO HA4~QT-- a~

10. Aift 2.46 , t $ 6A1-(418 E k1 IJXAJt 18, LLWtK+,4MTP6{3LLiWAM

[K-AIL TMEK,H 1818 hij- I3 S:20433.

Page 57: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

Rf 43

11. at6g1tetAX'EiKee itXaR

12. VT-, , ILt&F MZni J" N O~fi, A nfiM OWil

13. !E, ft:_IHTX e$ *

tt1, e 44 * fVAf,k AI t, f l4tt A0 ff4(n -pti A a 0 ) 4 RI

rr-IfrfA -ffl wA EX A RtX

fr i A[l 9KWIFRttR- fl f KAI o,P 4 c if- fI2~&Y ]0AA-Afi

Page 58: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

44 MtXHgEttR

((rpm SXt ar a* M A 93,6 A3* )) ( 9*) O PI' iTf 444 PIJ

RI -l&rj%kO*h A A tWhAl- jR I$ X V

Kt M 'MJt f9i if fEWp i GA In RPII f T I-VrI 9i 41olA r 1 9 m 1-4tf

JAVrTP f* t t IIt &Sf1*X I -E8k lffI p[At$ g brXhle, I tdA 4 % F/,8 - ~P

ITEfiEtt ARE9 t4 01S P IjTV191 n f>§ Et,/Xt

* A J r tP X A ff ' 3tI-)W NA ' r]"19g aLL JK- *((AWA]44, M) ~Xi7k

A;t:$ 9 "9 m fy, T WfA c ~Ait 3-4 V-N tX- 0-Ztr O T f" t* +§I o XW t

1996~~~~~~~~~~~~~~~19 4- 712 Ha*f

Page 59: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

GuidelinesProcurementunderIBRD LoansandIDA Credits

January 1995

Revised January and August 1996

Page 60: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

iIi

I

i

i

II

Page 61: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

Contents 3

CONTENTS

I. Introduction .................................--- 7

1.1 Purpose .*--------------------------- 7

1. 2 General Considerations ............................................................... 8

1. 5 Applicability of Guidelines .9------ g

1. 6 Eligibility .9------------------------------- g

1. 9 Advance Contracting and Retroactive Financing .............................. 10

1. 10 Joint Ventures ........................................................................- 11

1. 11 Bank Review .11

1. 12 Reserved Procurement ............................................................ 11

1. 13 Misprocurement .....................................................................- 12

1. 14 References to Bank ..................................................................- 12

1. 15 Fraud and Corruption ............................................................... 12

II. International Competitive Bidding ...................................................... 15

A. General ....................................................................................- 15

2. 1 Introduction ...........................................................................- 15

2. 2 Type and Size of Contracts .........................................................- 15

2. 6 Two-Stage Bidding .................................................................. 16

2. 7 Notification and Advertising ...................................................... 17

2. 9 Prequalification of Bidders ......................................................... 18

B. Bidding Documents ..................................................................... 19

2. 11 General .19

2.13 Validity of Bids and Bid Security ................................................ 19

2. 15 Language ..............................................................................- 20

2. 16 Clarity of Bidding Documents ................................................... 20

2. 19 Standards ..............................................................................- 21

2. 20 Use of Brand Names ............................................................... 21

2. 21 Pricing .................................................................................- 22

Page 62: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

4 Guidelines Procurement under IBRD Loans and IDA Credits

2. 24 Price Adjustment .................................................................. 23

2. 26 Transportation and Insurance ................................................... 23

2. 28 Currency Provisions ............................................................... 24

2. 29 Currency of Bid ..................................................................... 24

2. 31 Currency Conversion for Bid Comparison ....................................... 25

2. 32 Currency of Payment ............................................................... 25

2. 34 Terms and Methods of Payment ................................................ 25

2. 37 Conditions of Contract ............................................................- 26

2. 38 Performance Security ............................................................... 26

2. 40 Liquidated Damags and Bonus Clauses .......................................... 27

2. 41 Force Majeure ........................................................................- 27

2. 42 Applicable Law and Settlement of Disputes .................................... 27

C. Bid Opening,Evaluation,and Award of Contract . . 28

2. 43 Time for Preparation of Bids ...................................................... 28

2. 44 Bid Opening Procedures ............................................................ 28

2. 45 Clarifications or Alterations of Bids ............................................. 29

2. 46 Confidentiality ........................................................................- 29

2. 47 Examination of Bids ............................................................... 29

2. 48 Evaluation and Comparison of Bids ............................................. 29

2. 54 Domestic Preferences ............................................................... 31

2. 56 Extension of Validity of Bids ...................................................... 31

2. 57 Postqualification of Bidders ...................................................... 31

2. 58 Award of Contract .................................................................. 32

2. 59 Rejection of All Bids ............................................................... 32

D. Modified ICB .*----------------------------............................. 33

2. 63 Quick Disbursement Operations .............................. 33

2. 65 Procurement of Commodities .............................. 33

III. Other Methods of Procurement ................................ 35

3. 1 General . - - - - . ................................ 35

3. 2 Limited International Bidding ................................ 35

3. 3 National Competitive Bidding ............................. 35

3. 5 Shopping (International and National) .......................................... 36

Page 63: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

Contents 5

3. 7 Direct Contracting .................................................................. 36

3. 8 Force Account . - - - - - - . .................................... 37

3. 9 Procurement from United Nations Agencies .................................... 38

3. 10 Procurement Agents ...............................................................- 38

3. 11 Inspection Agents .................................................................. 38

3. 12 Procurement in Loans to Financial Intermediaries ........................... 39

3. 13 Procurement under BOT and Similar Private Sector Arrangements ...... 39

3. 14 Procurement under Loans Guaranteed by the Bank ........................... 40

3. 15 Community Participation in Procurement .................................... 40

Appendices .......................................................................................- 41

Appendix 1 - Review by the Bank of Procurement Decisions ..................... 41

Appendix 2 - Domestic Preferences ............. ....................... 45

Appendix 3 - Disbursements ............................................................ 48

Appendix 4 - Guidance to Bidders ............................ 50

Page 64: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl
Page 65: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I. Introduction 7

I. INTRODUCTION

Purpose

1. 1 The purpose of these Guidelines is to inform those carrying out a project that is fi-

nanced in whole or in part by a loan from the International Bank for Reconstruction and

Development (IBRD) or a credit from the International Development Association

(IDA) , c 1I of the arrangements to be made for procuring the goods and worksC I (in-

cluding related services) required for the project. The Loan Agreement governs the legal

relationships between the Borrower and the Bank, and the Guidelines are made applica-

ble to procurement of goods and works for the project, as provided in the agreement.

The rights and obligations of the Borrower and the providers of goods and works for the

project are governed by the bidding: 3 0 documents, and by the contracts signed by the

Borrower with the providers of goods and works, and not by these Guidelines or the

Loan Agreements. No party other than the parties to the Loan Agreement shall derive

any rights therefrom or have any claim to loan proceeds.

c 1 ) Procurement requirements of IBRD and IDA are identical, and references in these Guidelines

to the Bank include both IBRD and IDA, and references to loans include credits and project

preparation facilities (PPFs). Loan Agreement includes Development Credit Agreement and

Project Agreement.

C 2 ) References to "goods" and "works" in these Guidelines include related services such as trans-

portation, insurance, installation, commissioning, training, and initial maintenance.

"Goods" includes commodities, raw material, machinery, equipment, and industrial plant.

The provisions of these Guidelines also apply to services which are bid and contracted on the

basis of performance of a measurable physical output, such as drilling, mapping, and similar

operations. These Guidelines do not refer to Consultants' services, to which the current

Guidelines: Use of Consultants by World Bank Borrowers and by the World Bank as Execut-

ing Agency apply (referred to herein as Consultant Guidelines).

C 3 j For the purposes of these Guidelines, the words "bid" and "tender" shall have the same

meaning.

Page 66: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

8 Guidelines Procurement under IBRD Loans and IDA Credits

General Considerations

1. 2 The responsibility for the implementation of the project, and therefore for the

award and administration of contracts under the project, rests with the Borrower. [4)

The Bank, for its part, is required by its Articles of Agreement to ". . . ensure that the

proceeds of any loan are used only for the purposes for which the loan was granted, with

due attention to considerations of economy and efficiency and without regard to political

or other noneconomic influences or consideration, "c5 and it has established detailed

procedures for this purpose. While in practice the specific procurement rules and proce-

dures to be followed in the implementation of a project depend on the circumstances of

the particular case, four considerations generally guide the Bank's requirements:

(a) the need for economy and efficiency in the implementation of the project, includ-

ing the procurement of the goods and works involved;

(b) the Bank's interest, as a cooperative institution, in giving all eligible bidders from

developed and developing countries f 63 an opportunity to compete in providing

goods and works financed by the Bank;

(c) the Bank's interest, as a development institution, in encouraging the development

of domestic contracting and manufacturing industries in the borrowing country;

and

(d) the importance of transparency in the procurement process.

1. 3 The Bank has found that, in most cases, these needs and interests can best be re-

alized through International Competitive Bidding (ICB), properly administered, and

with suitable allowance for preferences for domestically manufactured goods and, where

appropriate, for domestic ContractorsC 73D for works under prescribed conditions. In such

cases, therefore, the Bank requires its Borrowers to obtain goods and works through

C 4 D In some cases, the Borrower acts only as an intermediary, and the project is carried out byanother agency or entity. References in these Guidelines to the Borrower include such agen-cies and entities, as well as Sub-Borrowers under on-lending arrangements.

C 5 D The Bank's Articles of Agreement; Article I , Section 5(b).

C 6 D See para. 1. 6.

C 7 D For purposes of these Guidelines, "Contractor" refers only to a firm providing constructionservices.

Page 67: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I . Introduction 9

ICB open to eligible Suppliers and Contractors. 8 Section 11 of these Guidelines de-

scribes the procedures for ICB.

1. 4 On the other hand, where ICB is clearly not the most economic and efficient

method of procurement, other methods of procurement are specified in the Loan Agree-

ment. Section m describes these other methods of procurement and the circumstances

under which their application would be more appropriate. The particular methods to be

followed for the procurement of goods and works for a given project are specified in the

Loan Agreement for such project.

Applicability of Guidelines

1. 5 Generally the Bank finances only a part of the cost of the project. The procedures

outlined in these Guidelines apply to all contracts for goods and works financed in whole

or in part from Bank loans. For the procurement of those contracts for goods and works

not financed from a Bank loan, the Borrower may adopt other procedures. In such cases

the Bank shall be satisfied that the procedures to be used will fulfill the Borrower' s obli-

gations to cause the project to be carried out diligently and efficiently, and that the

goods and works to be procured:

(a) are of satisfactory quality and are compatible with the balance of the project;

(b) will be delivered or completed in timely fashion; and

(c) are priced so as not to affect adversely the economic and financial viability of the

project.

Eligibility

1. 6 Funds from Bank loans are disbursed only on account of expenditures for goods

and works provided by nationals of, and produced in or supplied from, Bank member

countries. C 9 Under this policy, nationals of other countries or bidders offering goods

and works from other countries shall be disqualified from bidding for contracts intended

to be financed in whole or in part from Bank loans.

C 8 ) See para. 1. 6.

C 9 D See Section 5. 01 of General Conditions Applicable to Loan and Guarantee Agreements, dated

January 1,1985. The Bank maintains a list of countries from which bidders, goods, and ser-

vices are not eligible to participate in procurement financed by the Bank. The list is regularly

updated and can be obtained from the Public Information Center of the World Bank.

Page 68: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

10 Guidelines Procurement under IBRD Loans and IDA Credits

1. 7 In connection with any contract to be financed in whole or in part from a Bank

loan, the Bank does not permit a Borrower to deny prequalification, if required, to a

firm for reasons unrelated to its capability and resources to successfully perform the con-

tract; nor does it permit a Borrower to disqualify any bidder for such reasons.

1. 8 As exceptions to the foregoing:

(a) Firms of a member country or goods manufactured in a member country may be

excluded if, (i) as a matter of law or official regulation, the Borrower's country

prohibits commercial relations with that country, provided that the Bank is satis-

fied that such exclusion does not preclude effective competition for the supply of

goods or works required, or (ii) by an act of compliance with a decision of the

United Nations Security Council taken under Chapter Vll of the Charter of the

United Nations, the Borrower's country prohibits any import of goods from that

country or any payments to persons or entities in that country.

(b) A firm which has been engaged by the Borrower to provide consulting services for

the preparation or implementation of a project, and any of its affiliates, shall be

disqualified from subsequently providing goods or works (other than a continua-

tion of the firm's earlier consulting services) for the same project. This provision

does not apply to the various firms (Consultants, Contractors, or Suppliers)

which together are performing the Contractor' s obligations under a turnkey or de-

sign and build contract. (10D

(c) Government-owned enterprises in the Borrower's country may participate only if

they can establish that they (i) are legally and financially autonomous, and (ii)

operate under commercial law. No dependent agency of the Borrower or Sub-

Borrower under a Bankfinanced project shall be permitted to bid or submit a pro-

posal for the procurement of goods or works under the project. C")

(d) A firm declared ineligible by the Bank in accordance with subparagraph (d) of

paragraph 1. 15 of these Guidelines shall be ineligible to be awarded a Bank-fi-

nanced contract during the period of time determined by the Bank.

Advance Contracting and Retroactive Financing

1. 9 In certain circumstances, such as to accelerate project implementation, the Bor-

CioJ See para. 2. 5.

C1 1 Other than Force Account units, as permitted under para. 3. 8.

Page 69: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I . Introduction 1

rower may wish to proceed with the initial steps of procurement before signing the relat-

ed Bank loan. The procurement procedures, including advertising, shall be in accor-

dance with the Guidelines in order for the eventual contracts to be eligible for Bank fi-

nancing, and the normal review process by the Bank shall be followed. A Borrower un-

dertakes such advance contracting at its own risk, and any concurrence by the Bank

with the procedures, documentation, or proposal for award does not commit the Bank

to make a loan for the project in question. If the contract is signed, reimbursement by

the Bank of any payments made by the Borrower under the contract prior to loan signing

is referred to as retroactive financing and is only permitted within the limits specified in

the Loan Agreement.

Joint Ventures

1. 10 Suppliers and Contractors in the Borrower's country are encouraged to partici-

pate in the procurement process since the Bank encourages the development of domestic

industry. They may bid independently or in joint venture with foreign firms, but the

Bank will not accept conditions of bidding which require mandatory joint ventures or

other forms of mandatory association between domestic and foreign firms.

Bank Review

1. 11 The Bank reviews the Borrower' s procurement procedures, documents, bid

evaluations, award recommendations, and contracts to ensure that the procurement pro-

cess is carried out in accordance with the agreed procedures. These review procedures

are described in Appendix 1. The Loan Agreement shall specify the extent to which

these review procedures shall apply in respect of the different categories of goods and

works to be financed, in whole or in part, from the Bank loan.

Reserved Procurement

1. 12 When open competition would be the appropriate method of procurement for par-

ticular goods or works of the project, but the Borrower wishes to reserve this procure-

ment for one or more specific firms or enterprises, the Bank may accept such reserved

procurement only on condition that:

(a) it is not eligible for financing out of the Bank loan; and

(b) it will not significantly affect the satisfactory project implementation in terms of

costs, quality, and completion time.

Page 70: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

12 Guidelines Procurement under IBRD Loans and IDA Credits

Misprocurement

1. 13 The Bank does not finance expenditures for goods and works which have not

been procured in accordance with the agreed procedures in the Loan Agreement, and it

is the policy of the, Bank to cancel that portion of the loan allocated to the goods and

works that have been misprocured. The Bank may, in addition, exercise other remedies

under the Loan Agreement.

References to Bank

1. 14 If the Borrower wishes to refer to the Bank in procurement documents, the fol-

lowing language shall be used:

"(name of Borrower) has received (or in appropriate cases 'has applied for') a

loan from the International Bank for Reconstruction and Development in various

currencies equivalent to USD... toward the cost of (name of project), and in-

tends to apply a portion of the proceeds of this loan to eligible payments under this

contract. Payment by the International Bank for Reconstruction and Development

will be made only at the request of (name of Borrower or designate) and upon ap-

proval by the International Bank for Reconstruction and Development, and will be

subject, in all respects, to the terms and conditions of the Loan Agreement. The

Loan Agreement prohibits a withdrawal from the Loan Account for the purpose of

any payment to persons or entities, or for any import of goods, if such payment or

import, to the knowledge of the Bank, is prohibited by a decision of the United

Nations Security Council taken under Chapter VI of the Charter of the United Na-

tions. No party other than (name of Borrower) shall derive any rights from the

Loan Agreement or have any claim to loan proceeds. "112M

Fraud and Corruption

1. 15 It is the Bank's policy to require that Borrowers (including beneficiaries of Bank

loans), as well as bidders/Suppliers/Contractors under Bank-financed contracts, ob-

serve the highest standard of ethics during the procurement and execution of such con-

tracts. In pursuance of this policy, the Bank:

C 22 D Substitute "credit," "International Development Association," and "Credit Agreement," asappropriate.

Page 71: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I. Introduction 13

(a) defines, for the purposes of this provision, the terms set forth below as follows:

(i) "corrupt practice" means the offering, giving, receiving, or soliciting of any

thing of value to influence the action of a public official in the procurement

process or in contract execution; and

(ii) "fraudulent practice" means a misrepresentation of facts in order to influence

a procurement process or the execution of a contract to the detriment of the

Borrower, and includes collusive practices among bidders (prior to or after

bid submission) designed to establish bid prices at artificial, noncompetitive

levels and to deprive the Borrower of the benefits of free and open competi-

tion;

(b) will reject a proposal for award if it determines that the bidder recommended for

award has engaged in corrupt or fraudulent practices in competing for the contract

in question;

(c) will cancel the portion of the loan allocated to a contract for goods or works if it at

any time determines that corrupt or fraudulent practices were engaged in by repre-

sentatives of the Borrower or of a beneficiary of the loan during the procurement

or the execution of that contract, without the Borrower having taken timely and

appropriate action satisfactory to the Bank to remedy the situation;

(d) will declare a firm ineligible, either indefinitely or for a stated period of time, to

be awarded a Bank-financed contract if it at any time determines that the firm has

engaged in corrupt or fraudulent practices in competing for, or in executing, a

Bank-financed contract; and

(e) will have the right to require that, in contracts financed by a Bank loan, a provi-

sion be included requiring Suppliers and Contractors to permit the Bank to inspect

their accounts and records relating to the performance of the contract and to have

them audited by auditors appointed by the Bank.

Page 72: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

l~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

l

Page 73: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I . International Competitive Bidding 15

X . INTERNATIONAL COMPETITIVE

BIDDING

A. General

Introduction

2. 1 The objective of International Competitive Bidding (ICB), as described in these

Guidelines, is to provide all eligible prospective biddersC13) with timely and adequate noti-

fication of a Borrower' s requirements and an equal opportunity to bid for the required

goods and works.

Type and Size of Contracts

2. 2 The bidding documents shall clearly state the type of contract to be entered into

and contain the proposed contract provisions appropriate therefor. The most common

types of contracts provide for payments on the basis of a lump sum, unit prices, reim-

bursable cost plus fees, or combinations thereof. Reimbursable cost contracts are accept-

able to the Bank only in exceptional circumstances such as conditions of high risk or

where costs cannot be determined in advance with sufficient accuracy. Such contracts

shall include appropriate incentives to limit costs.

2. 3 The size and scope of individual contracts will depend on the magnitude, nature,

and location of the project. For projects requiring a variety of goods and works, separate

contracts generally are awarded for the supply and/or installation of different items of

equipment and plant C14 and for the works.

2. 4 For a project requiring similar but separate items of equipment or works, bids may

be invited under alternative contract options that would attract the interest of both small

c13) See para. 1. 6.

C14 For purposes of these Guidelines, "plant" refers to installed equipment, as in a production fa-

cility.

Page 74: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

16 Guidelines Procurement under IBRD Loans and IDA Credits

and large firms, which could be allowed, at their option, to bid for individual contracts

(slices) or for a group of similar contracts (package). All bids and combinations of bids

shall be received by the same deadline and opened and evaluated simultaneously so as to

determine the bid or combination of bids offering the lowest evaluated cost to the Bor-

rower. C1511

2. 5 In certain cases, such as special processes, closely integrated manufacturing, or

works of a special nature, the Bank may accept or require a turnkey contract under

which the design and engineering, the supply and installation of equipment, and the

construction of a complete industrial plant or works are provided under one contract. Al-

ternatively, the Borrower may remain responsible for the design and engineering, and

invite bids for a single responsibility contract for the supply and installation of all goods

and works required for the project component. Design and build, and management con-

tractingCl16 contracts are also acceptable where appropriate.

Two-Stage Bidding

2. 6 Detailed design and engineering of the goods and works to be provided, including

the preparation of technical specifications and other bidding documents, normally pre-

cede the invitation to bid for major contracts. However, in the case of turnkey contracts

or contracts for large complex plants or works of a special nature, it may be undesirable

or impractical to prepare complete technical specifications in advance. In such a case, a

two-stage bidding procedure may be used, under which first unpriced technical proposals

on the basis of a conceptual design or performance specifications are invited, subject to

technical as well as commercial clarifications and adjustments, to be followed by amend-

ed bidding documents and the submission of final technical proposals and priced bids in

the second stage. These procedures are also appropriate in the procurement of equipment

which is subject to rapid technological advances, such as major computer and communi-

r1 5 See paras. 2. 48-2. 53 for the bid evaluation procedures.

C 1 6 In construction, a management Contractor usually does not perform the work directly but

contracts out and manages the work of other Contractors, taking on the full responsibility

and risk for price, quality, and timely performance. Conversely, a construction manager is a

Consultant for, or agent of, the Borrower, but does not take on such risks. (If financed by

the Bank, the services of the construction manager should be procured under the Consultant

Guidelines. See footnote 2. )

Page 75: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

11 . International Competitive Bidding 17

cations systems. C17D

Notification and Advertising

2. 7 Timely notification of bidding opportunities is essential in competitive bidding.

For projects which include procurement on the basis of ICB, the Borrower is required to

prepare and submit to the Bank a draft General Procurement Notice. The Bank will ar-

range for its publication in Development Business (UNDB). CM The Notice shall contain

information concerning the Borrower (or prospective Borrower), amount and purpose of

the loan, scope of procurement under ICB, and the name and address of the Borrower'

s agency responsible for procurement. If known, the scheduled date for availability of

prequalification or bidding documents should be indicated. The Borrower shall maintain

a list of responses to the Notice. The related prequalification or bidding documents, as

the case may be, shall not be released to the public earlier than eight weeks after the

date of publication of the Notice. The General Procurement Notice shall be updated an-

nually for all outstanding procurement.

2. 8 The international community shall also be notified in a timely manner of the op-

portunities to bid for specific contracts. To that end, invitations to prequalify or to bid,

as the case may be, shall be advertised as Specific Procurement Notices in at least one

newspaper of national circulation in the Borrower's country (and in the official gazette,

if any). Such invitations shall also be transmitted to those who have expressed interest

in bidding in response to the General Procurement Notice. Publication of the invitations

in Development Business is also encouraged. Borrowers are also strongly encouraged to

transmit such invitations to embassies and trade representatives of countries of likely

Suppliers and Contractors. Additionally, for large, specialized, or important contracts,

Borrowers shall advertise the invitations in Development Business and/or well-known

technical magazines, newspapers, and trade publications of wide international circula-

C1 7 D As opposed to two-stage bidding, the Bank does not accept the two- or three-envelope sys-

tem in which bidders are required to submit separate qualification, technical, and price pro-

posals at the same time, but which are opened sequentially in separate sessions and evaluated.

1 8 Development Business is a publication of the United Nations Department of Public Informa-

tion, UN Plaza, New York, New York, 10017, U. S. A. A Development Business office is

maintained at the World Bank, 1818 H Street, N. W. , Washington, D. C. , 20433, U. S.

A.

Page 76: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

18 Guidelines Procurement under IBRD Loans and IDA Credits

tion. Notification shall be given in sufficient time to enable prospective bidders to obtain

prequalification or bidding documents and prepare and submit their responses. 19

Prequalification of Bidders

2. 9 Prequalification is usually necessary for large or complex works, or in any other

circumstances in which the high costs of preparing detailed bids could discourage compe-

tition, such as custom-designed equipment, industrial plant, specialized services, and

contracts to be let under turnkey, design and build, or management contracting. This

also ensures that invitations to bid are extended only to those who have adequate capabil-

ities and resources. Prequalification may also be useful to determine eligibility for prefer-

ence for domestic Contractors where this is allowed. (20 Prequalification shall be based

entirely upon the capability and resources of prospective bidders to perform the particular

contract satisfactorily, taking into account their (i) experience and past performance on

similar contracts, (ii) capabilities with respect to personnel, equipment, and construc-

tion or manufacturing facilities, and (iii) financial position. C21)

2. 10 The invitation to prequalify for bidding on specific contracts or groups of similar

contracts shall be advertised and notified as described in paragraphs 2. 7 and 2. 8 above.

The scope of the contract and a clear statement of the requirements for qualification shall

be sent to those who responded to the invitation. All such applicants that meet the spec-

ified criteria shall be allowed to bid. Borrowers shall inform all applicants of the results

of prequalification. As soon as prequalification is completed, the bidding documents

shall be made available to the qualified prospective bidders. For prequalification for

groups of contracts to be awarded over a period of time, a limit for the number or total

value of awards to any one bidder may be made on the basis of the bidder' s resources.

The list of prequalified firms in such instances shall be updated periodically. Verification

of the information provided in the submission for prequalification shall be confirmed at

the time of award of contract, and award may be denied to a bidder that is judged to no

longer have the capability or resources to successfully perform the contract.

lgjD See para. 2. 43.

C20) See paras. 2. 54-2. 55.

C 21 The Bank has prepared a Standard Prequalification Document for use by its Borrowers,

where appropriate.

Page 77: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I . International Competitive Bidding 19

B. Bidding Documents

General

2. 11 The bidding documents shall furnish all information necessary for a prospective

bidder to prepare a bid for the goods and works to be provided. While the detail and

complexity of these documents may vary with the size and nature of the proposed bid

package and contract, they generally include: invitation to bid; instructions to bidders;

form of bid; form of contract; conditions of contract, both general and special; specifi-

cations and drawings; list of goods or bill of quantities; delivery time or schedule of

completion; and necessary appendices, such as formats for various securities. The basis

for bid evaluation and selection of the lowest evaluated bid shall be clearly outlined in the

instructions to bidders and/or the specifications. If a fee is charged for the bidding docu-

ments, it shall be reasonable and reflect only the cost of their printing and delivery to

prospective bidders, and shall not be so high as to discourage qualified bidders. Guidance

on critical components of the bidding documents are given in the following paragraphs.

2. 12 Borrowers shall use the appropriate Standard Bidding Documents (SBDs) issued

by the Bank with minimum changes, acceptable to the Bank, as necessary to address

country- and project-specific issues. Any such changes shall be introduced only through

bid or contract data sheets, or through special conditions of contract, and not by intro-

ducing changes in the standard wording of the Bank's SBDs. Where no relevant stan-

dard bidding documents have been issued, the Borrower shall use other internationally

recognized standard conditions of contract and contract forms acceptable to the Bank.

Validity of Bids and Bid Security

2. 13 Bidders shall be required to submit bids valid for a period specified in the bidding

documents which shall be sufficient to enable the Borrower to complete the comparison

and evaluation of bids, review the recommendation of award with the Bank (if required

by the Loan Agreement), and obtain all the necessary approvals so that the contract can

be awarded within that period.

2. 14 Bid security, in the amount specified in the bidding documents, affording the

Borrower reasonable protection against irresponsible bids, may be required, but it shall

not be set so high as to discourage bidders. The bid security, at the bidder' s option,

Page 78: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

20 Guidelines Procurement under IBRD Loans and IDA Credits

shall be in the form of a certified check, a letter of credit or a bank guarantee from a

reputable bank. Bidders shall be allowed to submit bank guarantees directly issued by a

bank of their choice located in any eligible country. Bid security shall remain valid for a

period of four weeks beyond the validity period for the bids, in order to provide reason-

able time for the Borrower to act if the security is to be called. Bid security shall be re-

leased to unsuccessful bidders once it is determined that they will not be awarded a con-

tract.

Language

2. 15 Prequalification and bidding documents shall be prepared in either English,

French, or Spanish, and shall specify that the text of the contract documents in that

language is governing. However, contracts entered into with local bidders (excluding

joint ventures between local and foreign firms) may, at the Borrower's option, be in

the national language of the Borrower, which shall be the governing language for such

contracts.

Clarity of Bidding Documents

2. 16 Bidding documents shall be so worded as to permit and encourage international

competition and shall set forth clearly and precisely the work to be carried out, the loca-

tion of the work, the goods to be supplied, the place of delivery or installation, the

schedule for delivery or completion, minimum performance requirements, and the war-

ranty and maintenance requirements, as well as any other pertinent terms and condi-

tions. In addition, the bidding documents, where appropriate, shall define the tests,

standards, and methods that will be employed to judge the conformity of equipment as

delivered, or works as performed, with the specifications. Drawings shall be consistent

with the text of the specifications, and an order of precedence between the two shall be

specified.

2. 17 The bidding documents shall specify any factors, in addition to price, which will

be taken into account in evaluating bids, and how such factors will be quantified or oth-

erwise evaluated. If bids based on alternative designs, materials, completion schedules,

payment terms, etc. , are permitted, conditions for their acceptability and the method

of their evaluation shall be expressly stated.

2. 18 All prospective bidders shall be provided the same information, and shall be as-

Page 79: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I . International Competitive Bidding 21

sured of equal opportunities to obtain additional information on a timely basis. Borrow-

ers shall provide reasonable access to project sites for visits by prospective bidders. For

works or complex supply contracts, particularly for those requiring refurbishing existing

works or equipment, a pre-bid conference may be arranged whereby potential bidders

may meet with the Borrower representatives to seek clarifications. Minutes of the con-

ference shall be provided to all prospective bidders with a copy to the Bank. Any addi-

tional information, clarification, correction of errors, or modifications of bidding docu-

ments shall be sent to each recipient of the original bidding documents in sufficient time

before the deadline for receipt of bids to enable bidders to take appropriate actions. If

necessary, the deadline shall be extended.

Standards

2. 19 Standards and technical specifications quoted in bidding documents shall promote

the broadest possible competition, while assuring the critical performance or other re-

quirements for the goods and/or works under procurement. As far as possible, the Bor-

rower shall specify internationally accepted standards such as those issued by the Inter-

national Standards Organization with which the equipment or materials or workmanship

shall comply. Where such international standards are unavailable or are inappropriate,

national standards may be specified. In all cases, the bidding documents shall state that

equipment, material, or workmanship meeting other standards, which promise at least

substantial equivalence, will also be accepted.

Use of Brand Names

2. 20 Specifications shall be based on relevant characteristics and/or performance re-

quirements. References to brand names, catalog numbers, or similar classifications shall

be avoided. If it is necessary to quote a brand name or catalog number of a particular

manufacturer to clarify an otherwise incomplete specification, the words "or equivalent"

shall be added after such reference. The specification shall permit the acceptance of of-

fers for goods which have similar characteristics and which provide performance at least

substantially equivalent to those specified.

Page 80: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

22 Guidelines Procurement under IBRD Loans and IDA Credits

Pricing

2. 21 Bids for goods shall be invited on the basis of CIF (port of destination), or

CIP 22 (place of destination) for all goods offered from abroad, and EXW23J (ex works,

ex factory, or off-the-shelf) for locally available or manufactured or assembled goods,

including those previously imported. Bidders shall be allowed to arrange for ocean and

other transportation and related insurance from any eligible source. C24) Where inland

transportation, installation, commissioning, or other similar services are required to be

performed by the bidder, as in the case of "supply and installation" contracts, the bid-

der shall be required to quote for these services, in addition.

2. 22 In the case of turnkey contracts, the bidder shall be required to quote the price of

the installed plant at site, including all costs for supply of equipment, marine and local

transportation and insurance, installation, and commissioning, as well as associated

works and all other services included in the scope of contract such as design, mainte-

nance, operation, etc. Unless otherwise specified in the bidding documents, the

turnkey price shall include all duties, taxes, and other levies. (25J

2. 23 Bidders for works contracts shall be required to quote unit prices or lump sum

prices for the performance of the works, and such prices shall include all duties, taxes,

and other levies. Bidders shall be allowed to obtain all inputs (except for unskilled

labor) from any eligible sources so that they may offer their most competitive bids.

C 22 D Refer to INCOTERMS 1990 for further definitions. Published by the International Chamber

of Commerce, 38 Cours Albert I-, 75008 Paris, France. CIIF is cost, insurance, and freight

for maritime transportation. CIP is cost, carriage, and insurance in the case of multimodulartransportation. Both terms are for duty unpaid, payment for which is the responsibility ofthe Borrower.

C 2 3 The EXW price shall include all duties, sales, and other taxes already paid or payable for thecomponents and raw materials used in the manufacture or assembly of the equipment, or the

prior import of the equipment, offered in the bid.

C 2 4 )See para. 1. 6.

C 2 5 D Borrowers may prefer to exclude customs duties on imported equipment from the bid prices,since these are difficult to ascertain or, alternatively, to include a "provisional sum" for reim-

bursement of actual costs. See also Appendix 2, footnote 44.

Page 81: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I . International Competitive Bidding 23

Price Adjustment

2. 24 Bidding documents shall state either that (i) bid prices will be fixed or (ii) that

price adjustments will be made to reflect any changes (upwards or downwards) in major

cost components of the contract, such as labor, equipment, materials, and fuel. Price

adjustment provisions are usually not necessary in simple contracts involving delivery of

goods or completion of works within eighteen months, but shall be included in contracts

which extend beyond eighteen months. However, it is normal commercial practice to

obtain firm prices for some types of equipment regardless of the delivery time and, in

such cases, price adjustment provisions are not needed.

2. 25 Prices may be adjusted by the use of a prescribed formula (or formulae) which

breaks down the total price into components that are adjusted by price indices specified

for each component or, alternatively, on the basis of documentary evidence (including

actual invoices) provided by the Supplier or Contractor. The use of the formula method

of price adjustment is preferable to that of documentary evidence. The method to be

used, the formula (if applicable), and the base date for application shall be clearly de-

fined in the bidding documents. If the payment currency is different from the source of

the input and corresponding index, a correction factor shall be applied in the formula, to

avoid incorrect adjustment.

Transportation and Insurance

2. 26 Bidding documents shall permit Suppliers and Contractors to arrange transporta-

tion and insurance from any eligible source. Bidding documents shall state the types and

terms of insurance to be provided by the bidder. The indemnity payable under trans-

portation insurance shall be at least 110 percent of the contract amount in the currency

of the contract or in a freely convertible currency to enable prompt replacement of lost or

damaged goods. For works, a Contractor' s All Risk form of policy usually shall be

specified. For large projects with several Contractors on a site, a "wrap-up" or total

project insurance arrangement may be obtained by the Borrower, in which case the Bor-

rower shall seek competition for such insurance.

2. 27 As an exception, if a Borrower wishes to reserve transportation and insurance for

the import of goods to national companies or other designated sources, bidders shall be

Page 82: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

24 Guidelines Procurement under IBRD Loans and IDA Credits

asked to quote FOB (port of shipment) or CFR (port of destination) W26 prices in addi-

tion to the CIF (port of destination) or CIP (place of destination) price specified in para-

graph 2. 21. Selection of the lowest evaluated bid shall be on the basis of the CIF or CIP

price, but the Borrower may sign the contract on FOB or CFR terms and make its own

arrangement for transportation and/or insurance. Under such circumstances, disburse-

ments under the Bank loan shall be limited to the FOB or CFR cost. If the Borrower

does not wish to obtain insurance coverage in the market, evidence shall be provided to

the Bank that resources are readily available for prompt payment in a freely convertible

currency of the indemnities required to replace lost or damaged goods.

Currency Provisions

2. 28 Bidding documents shall state the currency or currencies in which bidders are to

state their prices, the procedure for conversion of prices expressed in different currencies

into a single currency for the purpose of comparing bids, and the currencies in which the

contract price will be paid. The following provisions (paragraphs 2. 29- 2. 33) are in-

tended to (i) ensure that bidders have the opportunity to minimize any exchange risk

with regard to the currency of bid and of payment, and hence may offer their best

prices; (ii) give bidders in countries with weak currencies the option to use a stronger

currency and thus provide a firmer basis for their bid price; and (iii) ensure fairness and

transparency in the evaluation process.

Currency of Bid

2. 29 Bidding documents shall state that the bidder may express the bid price in the

currency of any member country, or in ECUs. C27) If the bidder wishes to express the bid

price as a sum of amounts in different foreign currencies, he may do so, provided the

price includes no more than three foreign currencies. Furthermore, the Borrower may

require bidders to state the portion of the bid price representing local costs in the curren-

cy 2CM of the country of the Borrower.

26 INCOTERMS 1990 for free on board port of shipment, and for cost and freight to port of

destination, respectively.

C 27 For purposes of these Guidelines, the European Currency Unit (ECU) is also considered an

eligible currency.

C 28 )Referred to hereafter as local currency.

Page 83: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

11 . International Competitive Bidding 25

2. 30 In bidding documents for works, the Borrower may require bidders to state the

bid price entirely in the local currency, along with the requirements for payments in up

to three foreign currencies of their choice for expected inputs from outside the

Borrower's country (which inputs the bidders may be required to list), expressed as a

percentage of the bid price, together with the exchange rates used in such calculations.

Currency Conversion for Bid Comparison

2. 31 The bid price is the sum of all payments in various currencies required by the bid-

der. For the purpose of comparing prices, bid prices shall be converted to a single cur-

rency selected by the Borrower (local currency or fully convertible foreign currency) and

stated in the bidding documents. The Borrower shall make this conversion by using the

selling (exchange) rates for those currencies quoted by an official source (such as the

Central Bank) or by a commercial bank or by an internationally circulated newspaper for

similar transactions on a date selected in advance, such source and date to be specified in

the bidding documents, provided that the date shall not be earlier than four weeks prior

to the deadline for the receipt of bids, nor later than the original date for the expiry of

the period of bid validity.

Currency of Payment

2. 32 Payment of the contract price shall be made in the currency or currencies in

which the bid price is expressed in the bid of the successful bidder.

2. 33 When the bid price is required to be stated in the local currency but the bidder

has requested payment in foreign currencies expressed as a percentage of the bid price,

the exchange rates to be used for purposes of payments, shall be those specified by the

bidder in the bid, so as to ensure that the value of the foreign currency portions of the

bid is maintained without any loss or gain.

Terms and Methods of Payment

2. 34 Payment terms shall be in accordance with the international commercial practices

applicable to the specific goods and works.

(a) Contracts for supply of goods shall provide for full payment on the delivery and in-

spection, if so required, of the contracted goods except for contracts involving in-

stallation and commissioning, in which case a portion of the payment may be made

Page 84: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

26 Guidelines Procurement under IBRD Loans and IDA Credits

after the Supplier has complied with all its obligations under the contract. The use

of letters of credit is encouraged so as to assure prompt payment to the Supplier.

In major contracts for equipment and plant, provision shall be made for suitable

advances and, in contracts of long duration, for progress payments during the pe-

riod of manufacture or assembly.

(b) Contracts for works shall provide in appropriate cases for mobilization advances,

advances on Contractor's equipment and materials, regular progress payments,

and reasonable retention amounts to be released upon compliance with the Con-

tractor's obligations under contract.

2. 35 Any advance payment for mobilization and similar expenses, made upon signa-

ture of a contract for goods or works, shall be related to the estimated amount of these

expenses and be specified in the bidding documents. Amounts and timing of other ad-

vances to be made, such as for materials delivered to the site for incorporation in the

works, shall also be specified. The bidding documents shall specify the arrangements for

any security required for advance payments.

2. 36 Bidding documents shall specify the payment method and terms offered, whether

alternative payment methods and terms would be allowed and, if so, under what cir-

cumstances. The method of payment shall take into account the available procedures for

withdrawals of the proceeds of the loan, as described in Appendix 3.

Conditions of Contract

2. 37 The contract documents shall clearly define the scope of work to be performed,

the goods to be supplied, the rights and obligations of the Borrower and of the Supplier

or Contractor, and the functions and authority of the engineer, architect, or construc-

tion manager, if one is employed by the Borrower, in the supervision and administration

of the contract. In addition to the general conditions of contract, any special conditions

particular to the specific goods or works to be procured and the location of the project

shall be included.

Performance Security

2. 38 Bidding documents for works shall require security in an amount sufficient to

protect the Borrower in case of breach of contract by the Contractor. This security shall

be provided by a performance bond or a bank guarantee in an appropriate form and

Page 85: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

If . International Competitive Bidding 27

amount, as specified by the Borrower in the bidding document. The amount of the bond

or guarantee may vary, depending on the type of security furnished and on the nature

and magnitude of the works. A portion of this security shall extend sufficiently beyond

the date of completion of the works to cover the defects liability or maintenance period

up to final acceptance by the Borrower; alternatively, contracts may provide for a per-

centage of each periodic payment to be held as retention money until final acceptance.

Contractors may be allowed to replace retention money with an equivalent security after

provisional acceptance.

2. 39 In contracts for the supply of goods, the need for performance security depends

on the market conditions and commercial practice for the particular kind of goods. Sup-

pliers or manufacturers may be required to provide a bank guarantee to protect against

nonperformance of the contract. Such security in an appropriate amount may also cover

warranty obligations or, alternatively, a percentage of the payments may be held as re-

tention money to cover warranty obligations, and any installation or commissioning re-

quirements. The security or retention money shall be reasonable in amount.

Liquidated Damages and Bonus Clauses

2. 40 Provisions for liquidated damages or similar provisions in an appropriate amount

shall be included in the conditions of contract when delays in the delivery of goods, com-

pletion of works or failure of the goods or works to meet performance requirements

would result in extra cost, or loss of revenue or loss of other benefits to the Borrower.

Provision may also be made for a bonus to be paid to Suppliers or Contractors for com-

pletion of works or delivery of goods ahead of the times specified in the contract when

such earlier completion or delivery would be of benefit to the Borrower.

Force Majeure

2. 41 The conditions of contract shall stipulate that failure on the part of the parties to

perform their obligations under the contract will not be considered a default if such fail-

ure is the result of an event of force majeure as defined in the conditions of contract.

Applicable Law and Settlement of Disputes

2. 42 The conditions of contract shall include provisions dealing with the applicable law

and the forum for the settlement of disputes. International commercial arbitration may

have practical advantages over other methods for the settlement of disputes. Borrowers

Page 86: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

28 Guidelines Procurement under IBRD Loans and IDA Credits

are, therefore, encouraged to provide for this type of arbitration in contracts for the

procurement of goods and works. The Bank shall not be named arbitrator or be asked to

name an arbitrator. (29J In case of works contracts, supply and installation contracts,

and turnkey contracts, the dispute settlement provision shall also include mechanisms

such as dispute review boards or adjudicators, which are designed to permit a speedier

dispute settlement.

C. Bid Opening, Evaluation, and Award of Contract

Time for Preparation of Bids

2. 43 The time allowed for the preparation and submission of bids shall be determined

with due consideration of the particular circumstances of the project and the magnitude

and complexity of the contract. Generally, not less than six weeks from the date of the

invitation to bid or the date of availability of bidding documents, whichever is later,

shall be allowed for ICB. Where large works or complex items of equipment are in-

volved, this period shall generally be not less than twelve weeks to enable prospective

bidders to conduct investigations before submitting their bids. In such cases, the Bor-

rower is encouraged to convene pre-bid conferences and arrange site visits. Bidders shall

be permitted to submit bids by mail or by hand. The deadline and place for receipt of

bids shall be specified in the invitation to bid.

Bid Opening Procedures

2. 44 The time for the bid opening shall be the same as for the deadline for receipt of

bids or promptlyC303 thereafter, and shall be announced, together with the place for bid

opening, in the invitation to bid. The Borrower shall open all bids at the stipulated time

and place. Bids shall be opened in public; that is, bidders or their representatives shall

be allowed to be present. The name of the bidder and total amount of each bid, and of

any alternative bids if they have been requested or permitted, shall be read aloud and

recorded when opened and a copy of this record shall be promptly sent to the Bank. Bids

received after the time stipulated, as well as those not opened and read out at bid open-

C 2 9 )It is understood, however, that officials of the International Centre for Investment Disputes(ICSID) shall remain free to name arbitrators in their capacity as ICSID officials.

C30D To allow sufficient time to take the bids to the place announced for public bid opening.

Page 87: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I . International Competitive Bidding 29

ing, shall not be considered.

Clarifications or Alterations of Bids

2. 45 Except as otherwise provided in paragraphs 2. 61 and 2. 62 of these Guidelines,

bidders shall not be requested or permitted to alter their bids after the deadline for re-

ceipt of bids. The Borrower shall ask bidders for clarification needed to evaluate their

bids but shall not ask or permit bidders to change the substance or price of their bids af-

ter the bid opening. Requests for clarification and the bidders' responses shall be made

in writing.

Confidentiality

2. 46 After the public opening of bids, information relating to the examination, clarifi-

cation, and evaluation of bids and recommendations concerning awards shall not be dis-

closed to bidders or other persons not officially concerned with this process until the suc-

cessful bidder is notified of the award.

Examination of Bids

2. 47 The Borrower shall ascertain whether the bids (i) meet the eligibility require-

ments specified in paragraph 1. 6 of these Guidelines, (ii) have been properly signed,

(iii) are accompanied by the required securities, (iv) are substantially responsive to the

bidding documents, and (v) are otherwise generally in order. If a bid is not substantial-

ly responsive, that is, it contains material deviations from or reservations to the terms,

conditions, and specifications in the bidding documents, it shall not be considered fur-

ther. The bidder shall not be permitted to correct or withdraw material deviations or

reservations once bids have been opened. CL31

Evaluation and Comparison of Bids

2. 48 The purpose of bid evaluation is to determine the cost to the Borrower of each bid

in a manner that permits a comparison on the basis of their evaluated cost. Subject to

paragraph 2. 57, the bid with the lowest evaluated cost, L321 but not necessarily the low-

est submitted price, shall be selected for award.

L 311 See para. 2. 49 regarding corrections.

L 3 2 See para. 2. 51.

Page 88: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

30 Guidelines Procurement under IBRD Loans and IDA Credits

2. 49 The bid price read out at the bid opening shall be adjusted to correct any arith-

metical errors. Also, for the purpose of evaluation, adjustments shall be made for any

quantifiable nonmaterial deviations or reservations. Price adjustment provisions applying

to the period of implementation of the contract shall not be taken into account in the

evaluation.

2. 50 The evaluation and comparison of bids shall be on CIF or CIP prices for the sup-

ply of imported goods and EXW prices for goods offered from within the Borrower' s

country, together with prices for any required installation, training, commissioning,

and other similar services.

2. 51 Bidding documents shall also specify the relevant factors in addition to price to be

considered in bid evaluation and the manner in which they will be applied for the purpose

of determining the lowest evaluated bid. For goods and equipment, other factors which

may be taken into consideration include, among others, costs of inland transport and in-

surance to the specified site, payment schedule, delivery time, operating costs, efficien-

cy and compatibility of the equipment, availability of service and spare parts, and related

training, safety, and environmental benefits. The factors other than price to be used for

determining the lowest evaluated bid shall, to the extent practicable, be expressed in

monetary terms, or given a relative weight in the evaluation provisions in the bidding

documents.

2. 52 Under works and turnkey contracts, Contractors are responsible for all duties,

taxes, and other levies, (33D and bidders shall take these factors into account in preparing

their bids. The evaluation and comparison of bids shall be on this basis. Bid evaluation

for works shall be strictly in monetary terms. Any procedure under which bids above or

below a predetermined assessment of bid values are automatically disqualified is not ac-

ceptable. If time is a critical factor, the value of early completion to the Borrower may

be taken into account according to criteria presented in the bidding documents, only if

the conditions of contract provide for commensurate penalties for noncompliance.

2. 53 The Borrower shall prepare a detailed report on the evaluation and comparison of

bids setting forth the specific reasons on which the recommendation is based for the

award of the contract.

3 3 jUnless bidding documents specify otherwise for some turnkey contracts (see para. 2. 22 and

footnote 25).

Page 89: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I . International Competitive Bidding 31

Domestic Preferences

2. 54 At the request of the Borrower, and under conditions to be agreed under the

Loan Agreement and set forth in the bidding documents, a margin of preference may be

provided in the evaluation of bids for:

(a) goods manufactured in the country of the Borrower when comparing bids offering

such goods with those offering goods manufactured abroad; and

(b) works in member countries below a specified threshold of GNP13 4 3 per capita,

when comparing bids from eligible domestic Contractors with those from foreign

firms.

2. 55 Where preference for domestically manufactured goods or for domestic Contrac-

tors is allowed, the methods and stages set forth in Appendix 2 to these Guidelines shall

be followed in the evaluation and comparison of bids.

Extension of Validity of Bids

2. 56 Borrowers shall complete evaluation of bids and award of contract within the ini-

tial period of bid validity so that extensions are not necessary. An extension of bid valid-

ity, if justified by exceptional circumstances, shall be requested in writing from all bid-

ders before the expiration date. The extension shall be for the minimum period required

to complete the evaluation, obtain the necessary approvals, and award the contract. In

the case of fixed price contracts, requests for second and subsequent extensions will be

permissible only if the request for extension provides for an appropriate adjustment

mechanism of the quoted price to reflect changes in the cost of inputs for the contract

over the period of extension. Whenever an extension of bid validity period is requested,

bidders shall not be requested or be permitted to change the quoted (base) price or other

conditions of their bid. Bidders shall have the right to refuse to grant such an extension

without forfeiting their bid security, but those who are willing to extend the validity of

their bid shall be required to provide a suitable extension of bid security.

Postqualification of Bidders

2. 57 If bidders have not been prequalified, the Borrower shall determine whether the

C34 Gross national product as defined annually by the Bank.

Page 90: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

32 Guidelines Procurement under IBRD Loans and IDA Credits

bidder whose bid has been determined to offer the lowest evaluated cost has the capabili-

ty and resources to effectively carry out the contract as offered in the bid. The criteria to

be met shall be set out in the bidding documents, and if the bidder does not meet them,

the bid shall be rejected. In such an event, the Borrower shall make a similar determina-

tion for the next-lowest evaluated bidder.

Award of Contract

2. 58 The Borrower shall award the contract, within the period of the validity of bids,

to the bidder who meets the appropriate standards of capability and resources and whose

bid has been determined (i) to be substantially responsive to the bidding documents and

(ii) to offer the lowest evaluated cost. C35) A bidder shall not be required, as a condition

of award, to undertake responsibilities for work not stipulated in the bidding documents

or otherwise to modify the bid as originally submitted.

Rejection of All Bids

2. 59 Bidding documents usually provide that Borrowers may reject all bids. Rejection

of all bids is justified when there is lack of effective competition, or bids are not substan-

tially responsive. However, lack of competition shall not be determined solely on the ba-

sis of the number of bidders. If all bids are rejected, the Borrower shall review the caus-

es justifying the rejection and consider making revisions to the conditions of contract,

design and specifications, scope of the contract, or a combination of these, before invit-

ing new bids.

2. 60 If the rejection of all bids is due to lack of competition, wider advertising shall be

considered. If the rejection is due to most or all of the bids being nonresponsive, new

bids may be invited from the initially prequalified firms, or with the agreement of the

Bank from only those that submitted bids in the first instance.

2. 61 All bids shall not be rejected and new bids invited on the same bidding and con-

tract documents solely for the purpose of obtaining lower prices. If the lowest evaluated

responsive bid exceeds the Borrower's pre-bid cost estimates by a substantial margin,

the Borrower shall investigate causes for the excessive cost and consider requesting new

bids as described in the previous paragraphs. Alternatively, the Borrower may negotiate

C 35 Referred to as "lowest evaluated bidder" and "lowest evaluated bid", respectively.

Page 91: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I . International Competitive Bidding 33

with the lowest evaluated bidder to try to obtain a satisfactory contract through a reduc-

tion in the scope and/or a reallocation of risk and responsibility which can be reflected in

a reduction of the contract price. However, substantial reduction in the scope or modifi-

cation to the contract documents may require rebidding.

2. 62 The Bank's prior concurrence shall be obtained before rejecting all bids, solicit-

ing new bids, or entering into negotiations with the lowest evaluated bidder.

D. Modified ICB

Quick Disbursement Operations

2. 63 Where the loan provides financing for an imports program, as in the case of ad-

justment operations and other quick disbursement loans, ICB with simplified advertising

and currency provisions shall be used for large value contracts, as defined in the Loan

Agreement. 06

2. 64 The simplified provisions for notification of ICB procurement do not require a

General Procurement Notice. Specific Procurement Notices shall be inserted in at least

one newspaper of national circulation in the Borrower' s country (and in the official

gazette, if any) in addition to either: (i) Development Business; or (ii) a newspaper,

periodical, or technical journal of wide multinational circulation. The period allowed for

submission of bids may be reduced to four weeks. Bidding and payment may be limited

to one currency widely used in international trade.

Procurement of Commodities

2. 65 Market prices of commodities, such as grain, animal feed, cooking oil, fuel, fer-

tilizer, and metals, fluctuate, depending upon the demand and supply at any particular

time. Many are quoted in established commodity markets. Procurement often involves

multiple awards for partial quantities to assure security of supply and multiple purchases

over a period of time to take advantage of favorable market conditions and to keep inven-

tories low. A list of prequalified bidders may be drawn up to whom periodic invitations

C 3 6 DOther procurement is normally carried out in accordance with procedures followed by the pri-

vate or public entity handling the imports, or other established commercial practices accept-

able to the Bank, as described in para. 3. 12.

Page 92: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

34 Guidelines Procurement under IBRD Loans and IDA Credits

are issued. Bidders may be invited to quote prices linked to the market price at the time

of or prior to the shipments. Bid validities shall be as short as possible. A single curren-

cy in which the commodity is usually priced in the market, may be used for bidding and

payment. The currency shall be specified in the bidding document. Bidding documents

may permit telexed or faxed bids, if there is no requirement for bid security, or if stand-

ing bid securities valid over a specified period of time have been submitted by prequalified

bidders. Standard contract conditions and forms consistent with market practices shall

be used.

Page 93: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

11[. Other Methods of Procurement 35

m . OTHER METHODS OF PROCUREMENT

General

3. 1 There are circumstances where ICB would not be the most economic and efficient

method of procurement, and where other methods are deemed more appropriate. The

particular procurement methods and the categories of goods and works to which they ap-

ply are determined by agreement between the Bank and the Borrower, and are specified

in the Loan Agreement. (373 The Bank' s policies with respect to margins of preference

for domestically manufactured goods and Contractors do not apply to methods of pro-

curement other than ICB. The more common procurement methods which are generally

considered in situations where ICB may not be suitable are set forth in this section.

Limited International Bidding

3. 2 Limited International Bidding (LIB) is essentially ICB by direct invitation without

open advertisement. It may be an appropriate method of procurement where (i) the

contract values are small, or (ii) there is only a limited number of Suppliers, or (iii)

other exceptional reasons may justify departure from full ICB procedures. Under LIB,

Borrowers shall seek bids from a list of potential Suppliers broad enough to assure com-

petitive prices, such list to include all Suppliers when there are only a limited number.

Domestic preferences are not applicable in the evaluation of bids under LIB. In all re-

spects other than advertisement and preferences, ICB procedures shall apply.

National Competitive Bidding

3. 3 National Competitive Bidding (NCB) is the competitive bidding procedure normal-

ly used for public procurement in the country of the Borrower, and may be the most ef-

ficient and economical way of procuring goods or works which, by their nature or scope,

C 3 7 Contracts shall not be divided into smaller units in order to make them less attractive for ICB

procedures; any proposal to divide a contract into smaller packages shall require the prior ap-

proval of the Bank.

Page 94: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

36 Guidelines Procurement under IBRD Loans and IDA Credits

are unlikely to attract foreign competition. To be acceptable for use in Bank-financed

procurement, these procedures shall be reviewed and modified as necessary to assure

economy, efficiency, transparency, and broad consistency with the provisions included

in Section I of these Guidelines. NCB may be the preferred method of procurement

where foreigh bidders are not expected to be interested because (i) the contract values

are small, (ii) works are scattered geographically or spread over time, (iii) works are

labor intensive, or (iv) the goods or works are available locally at prices below the inter-

national market. NCB procedures may also be used where the advantages of ICB are

clearly outweighed by the administrative or financial burden involved.

3. 4 Publication of a General Procurement Notice is not required for NCB, and adver-

tising may be limited to the national press or official gazette. Bidding documents may be

in an official language of the country, and local currency is generally used for the pur-

poses of bidding and payment. Adequate response time for preparation and submission

of bids shall be provided. The procedures shall provide for adequate competition in order

to ensure reasonable prices, and methods used in the evaluation of bids and the award of

contracts shall be made known to all bidders and not be applied arbitrarily. If foreign

firms wish to participate under these circumstances, they shall be allowed to do so.

Shopping (International and National)

3. 5 Shopping is a procurement method based on comparing price quotations obtained

from several Suppliers, usually at least three, to assure competitive prices, and is an ap-

propriate method for procuring readily available off-the-shelf goods or standard specifica-

tion commodities that are small in value. Requests for quotations shall indicate the de-

scription and quantity of the goods, as well as desired delivery time and place. Quota-

tions may be submitted by telex or facsimile. The evaluation of quotations shall follow

sound public or private sector practices of the purchaser. The terms of the accepted offer

shall be incorporated in a purchase order.

3. 6 International shopping shall solicit quotations from at least three Suppliers in two

different countries. National shopping may be used where the desired goods are ordinari-

ly available from more than one source in the country of the Borrower at competitive

prices.

Direct Contracting

3. 7 Direct contracting without competition (single source) may be an appropriate

Page 95: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

I . Other Methods of Procurement 37

method under the following circumstances:

(a) An existing contract for goods or works, awarded in accordance with procedures

acceptable to the Bank, may be extended for additional goods or works of a similar

nature. The Bank shall be satisfied in such cases that no advantage could be ob-

tained by further competition and that the prices on the extended contract are rea-

sonable. Provisions for such an extension, if considered likely in advance, shall be

included in the original contract.

(b) Standardization of equipment or spare parts, to be compatible with existing equip-

ment, may justify additional purchases from the original Supplier. For such pur-

chases to be justified, the original equipment shall be suitable, the number of new

items shall generally be less than the existing number, the price shall be reason-

able, and the advantages of another make or source of equipment shall have been

considered and rejected on grounds acceptable to the Bank.

(c) The required equipment is proprietary and obtainable only from one source.

(d) The Contractor responsible for a process design requires the purchase of critical

items from a particular Supplier as a condition of a performance guarantee.

(e) In exceptional cases, such as in response to natural disasters.

Force Account

3. 8 Force account, that is, construction by the use of the Borrower's own personnel

and equipment, (383 may be the only practical method for constructing some kinds of

works. The use of force account may be justified where:

(a) quantities of work involved cannot be defined in advance;

(b) works are small and scattered or in remote locations for which qualified construc-

tion firms are unlikely to bid at reasonable prices;

(c) work is required to be carried out without disrupting ongoing operations;

(d) risks of unavoidable work interruption are better borne by the Borrower than by a

Contractor; and

(e) there are emergencies needing prompt attention.

83 8 A government-owned construction unit that is not managerially and financially autonomous

shall be considered a force account unit. "Force account" is otherwise known as "direct la-

bor, " "departmental forces," or "direct work. "

Page 96: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

38 Guidelines Procurement under IBRD Loans and IDA Credits

Procurement from United Nations Agencies

3. 9 There may be situations in which procurement from specialized agencies of the

United Nations (UN), acting as Suppliers, pursuant to their own procedures, may be

the most economical and efficient way of procuring small quantities of off-the-shelf

goods, primarily in the fields of education, health, and rural water supply and sanita-

tion.

Procurement Agents

3. 10 Where Borrowers lack the necessary organization, resources, and experience,

Borrowers may wish (or be required by the Bank) to employ, as their agent, a firm

specializing in handling international procurement. The agent shall strictly follow all the

procurement procedures outlined in the Loan Agreement on behalf of the Borrower, in-

cluding use of Bank Standard Bidding Documents (SBDs), review procedures, and doc-

umentation. This also applies in cases where UN agencies act as procurement agents. C39

Management Contractors may be employed in a similar manner for a fee to contract for

miscellaneous works involving reconstruction, repairs, rehabilitation, and new construc-

tions in emergency situations, or where large numbers of small contracts are involved.

Inspection Agents

3. 11 Preshipment inspection and certification of imports is one of the safeguards for

the Borrower, particularly where the country has a large import program. The inspec-

tion and certification usually covers quality, quantity, and reasonableness of price. Im-

ports procured through ICB procedures shall not be subject to price verification, but only

verification for quality and quantity. However, imports not procured through ICB may

additionally be subjected to price verification. The inspection agents are ordinarily paid

for on a fee basis levied on the value of the goods. Costs for certification of imports shall

not be considered in the evaluation of bids under ICB.

C39 ) The Consultant Guidelines shall apply for the selection of procurement and inspection agents.The cost or fee of the procurement or inspection agent is eligible for financing from the Bank

loan, if so provided in the Loan Agreement, and provided the terms and conditions of selec-

tion and employment are acceptable to the Bank.

Page 97: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

m . Other Methods of Procurement 39

Procurement in Loans to Financial Intermediaries

3. 12 Where the loan provides funds to an intermediary institution such as an agricul-

tural credit institution or a development finance company, to be re-lent to beneficiaries

such as individuals, private sector enterprises, or autonomous commercial enterprises in

the public sector for the partial financing of subprojects, the procurement is usually un-

dertaken by the respective beneficiaries in accordance with established local private sector

or commercial practices, which are acceptable to the Bank. However, even in these situ-

ations, ICB may be the more efficient and economic procurement method for the pur-

chase of large single items or in cases where large quantities of like goods can be grouped

together for bulk purchasing.

Procurement under BOT and Similar Private Sector Arrangements

3. 13 Where the Bank is participating in financing the cost of a project procured under

a BOO/BOT/BOOTC4 03 or similar type of private sector arrangement, either of the fol-

lowing procurement procedures shall be used, as set forth in detail in the Staff Appraisal

Report, the President's Report, and the Loan Agreement:

(a) The entrepreneur under the BOO/BOT/BOOT or similar type of contract C41 shall

be selected under ICB or LIB procedures acceptable to the Bank, which may in-

clude several stages in order to arrive at the optimal combination of evaluation cri-

teria, such as the cost and magnitude of the financing offered, the performance

specifications of the facilities offered, the cost charged to the user or purchaser,

other income generated for the Borrower or purchaser by the facility, and the peri-

od of the facility' s depreciation. The said entrepreneur selected in this manner

shall then be free to procure the goods, works, and services required for the facili-

ty from eligible sources, using its own procedures. In this case, the Staff Ap-

praisal Report, the President's Report, and the Loan Agreement shall specify the

type of expenditures incurred by the said entrepreneur towards which Bank fi-

(4o0 BOO: Build, Own, Operate.

BOT: Build, Operate, Transfer.

BOOT: Build, Own, Operate, Transfer.

C41 For projects such as toll roads, tunnels, harbors, bridges, power stations, waste disposal

plants, and water distribution systems.

Page 98: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

40 Guidelines Procurement under IBRD Loans and IDA Credits

nancing will apply.

Or,

(b) If the said entrepreneur has not been selected in the manner set forth in subpara-

graph (a) above, the goods, works, or services required for the facility and to be

financed by the Bank shall be procured in accordance with ICB or LIB procedures.

Procurement under Loans Guaranteed by the Bank

3. 14 If the Bank guarantees the repayment of a loan made by another lender, the

goods and works financed by the said loan shall be procured with due attention to econo-

my and efficiency and in accordance with procedures which meet the requirements of

paragraph 1. 5.

Community Participation in Procurement

3. 15 Where, in the interest of project sustainability, or to achieve certain specific so-

cial objectives of the project, it is desirable in selected project components to (i) call for

the participation of local communities and/or nongovernmental organizations (NGOs),

or (ii) increase the utilization of local know-how and materials, or (iii) employ labor-in-

tensive and other appropriate technologies, the procurement procedures, specifications,

and contract packaging shall be suitably adapted to reflect these considerations, provided

these are efficient. The procedures proposed shall be outlined in the Staff Appraisal Re-

port, the President's Report, and the Loan Agreement.

As recommended, by Mr. James D. Wolfensohn, President of the World Bank, in

March 24, 1997 and approved by the Executive Directors of the Bank and IDA, a new

paragraph 1. 16 is added below: *.

"1. 16. If a Borrower's country requires, through a law generally applicable in its terri-

tory, that bidders for all public procurement undertake to observe, in competing for and

executing a contract, its laws against fraud and corruption as listed by the Borrower in

the bidding documents, the Bank will accept, at the specific request of a Borrower's

country, that such an undertaking, in form and substance satisfactory to the Bank, be

also included in bid forms for contracts financed by the Bank.

* New paragraph added by the Bank in March, 1997.

Page 99: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

Appendix 41

Appendix 1

REVIEW BY THE BANK OF

PROCUREMENT DECISIONS

Scheduling of Procurement

1. The Bank shall review the procurement arrangements proposed by the Borrower,

including contract packaging, applicable procedures, and the scheduling of the procure-

ment process, for its conformity with these Guidelines and proposed implementation

program and disbursement schedule. The Borrower shall promptly inform the Bank of

any delay, or other changes in the scheduling of the procurement process, which could

significantly affect the timely and successful implementation of the project contracts,

and agree with the Bank on corrective measures.

Prior Review

2. With respect to all contracts which, in accordance with the Loan Agreement, are

made subject to the Bank's prior review:

(a) In cases where prequalification is used, the Borrower shall, before prequalification

submissions are invited, furnish the Bank with the draft documents to be used,

including the text of the invitation to prequalify, the prequalification question-

naire, and the evaluation methodology, together with a description of the adver-

tising procedures to be followed, and shall introduce such modifications in said

procedure and documents, as the Bank shall reasonably request. The list of pre-

qualified bidders, together with a statement of their qualifications and of the rea-

sons for the exclusion of any applicant for prequalification, shall be furnished by

the Borrower to the Bank for its comments before the applicants are notified of the

Borrower' s decision, and the Borrower shall make such additions to, deletions

from, or modifications in the said list as the Bank shall reasonably request.

(b) Before bids are invited, the Borrower shall furnish to the Bank for its comments,

draft bidding documents, including the invitation to bid; instructions to bidders,

Page 100: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

42 Guidelines Procurement under IBRD Loans and IDA Credits

including the basis of bid evaluation and contract award; and the conditions of

contract and specifications for the civil works, supply of goods, or installation of

equipment, etc. , as the case may be, together with a description of the advertis-

ing procedures to be followed for the bidding (if prequalification has not been

used), and shall make such modifications in the said documents as the Bank shall

reasonably request. Any further modification shall require the Bank's concurrence

before it is issued to the prospective bidders.

(c) After bids have been received and evaluated, the Borrower shall, before a final de-

cision on the award is made, furnish to the Bank, in sufficient time for its review,

a detailed report (prepared, if the Bank shall so request, by experts acceptable to

the Bank), on the evaluation and comparison of the bids received, together with

the recommendations for award and such other information as the Bank shall rea-

sonably request. The Bank shall, if it determines that the intended award would

be inconsistent with the Loan Agreement, promptly inform the Borrower and

state the reasons for such determination.

(d) If the Borrower requires an extension of bid validity to complete the process of

evaluation, obtain necessary approvals and clearances, and to make the award, it

should seek the Bank's prior concurrence for the first request for extension, if it

is longer than eight weeks, and for all subsequent requests for extension, irre-

spective of the period.

(e) The terms and conditions of a contract shall not, without the Bank' s concur-

rence, materially differ from those on which bids were asked or prequalification of

Contractors, if any, was invited.

(f) One conformed copy of the contract shall be furnished to the Bank promptly after

its execution and prior to delivery to the Bank of the first application for withdraw-

al of funds from the Loan Account in respect of such contract. Where payments

for the contract are to be made out of a Special Account (SA), a copy of the con-

tract shall be furnished to the Bank prior to the making of the first payment out of

the SA in respect of such contract.

(g) All evaluation reports shall be accompanied with a summary of the procurement on

a form provided by the Bank. The description and amount of the contract, to-

gether with the name and address of the successful bidder, shall be subject to re-

lease by the Bank upon confirmation by the Borrower of contract award.

Page 101: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

Appendix 43

Modifications

3. In the case of contracts subject to prior review, before granting a material extension

of the stipulated time for performance of a contract, agreeing to any modification or

waiver of the conditions of such contract, including issuing any change order or orders

under such contract (except in cases of extreme urgency) which would in aggregate in-

crease the original amount of the contract by more than 15 percent of the original price,

the Borrower shall inform the Bank of the proposed extension, modification, or change

order and the reasons therefor. If the Bank determines that the proposal would be incon-

sistent with the provisions of the Loan Agreement, it shall promptly inform the Borrow-

er and state the reasons for its determination. A copy of all amendments to the contract

shall be furnished to the Bank for its record.

Post Review

4. With respect to each contract not governed by paragraph 2, the Borrower shall fur-

nish to the Bank, promptly after its signing and prior to delivery to the Bank of the first

application for withdrawal of funds from the Loan Account in respect of such contract,

one conformed copy of such contract, together with the analysis of the respective bids,

recommendations for award, and such other information as the Bank shall reasonably

request. Where payments for the contract are to be made out of a Special Account, a

copy of the contract, together with the other information required to be furnished to the

Bank, shall be furnished to the Bank prior to delivery to the Bank of the first replenish-

ment application in respect of such contract. The Bank shall, if it determines that the

award of the contract or the contract itself is not consistent with the Loan Agreement,

promptly inform the Borrower and state the reasons for such determination. These pro-

visions shall not apply to contracts on account of which withdrawals from the loan are to

be made on the basis of Statements of Expenditure, C42J for which case all such docu-

ments shall be retained by the Borrower for subsequent examination by independent au-

ditors and Bank supervision missions.

Translations

5. If a contract awarded under ICB procedures to a local bidder is written in the na-

c 42 3 Refer to Appendix 3.

Page 102: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

44 Guidelines Procurement under IBRD Loans and IDA Credits

tional language, C43 a certified translation of the contract in either English, French, or

Spanish shall be furnished to the Bank together with the conformed copy of the con-

tract. Such certified translations shall also be furnished to the Bank, for any subsequent

modifications of such contracts.

t43D Refer to para. 2.15.

Page 103: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

Appendix 45

Appendix 2

DOMESTIC PREFERENCES

Preference for Domestically Manufactured Goods

1. The Borrower may, with the agreement of the Bank, grant a margin of preference

in the evaluation of bids under ICB procedures to bids offering certain goods manufac-

tured in the country of the Borrower, when compared to bids offering such goods manu-

factured elsewhere. In such cases, bidding documents shall clearly indicate any prefer-

ence to be granted to domestic manufactured goods and the information required to es-

tablish the eligibility of a bid for such preference. The nationality of the manufacturer or

Supplier is not a condition for such eligibility. The methods and stages set forth hereun-

der shall be followed in the evaluation and comparison of bids.

2. For comparison, responsive bids shall be classified in one of the following three

groups:

(a) Group A: bids offering goods manufactured in the country of the Borrower if the

bidder establishes to the satisfaction of the Borrower and the Bank that (i) labor,

raw material, and components from within the country of the Borrower will ac-

count for more than 30 percent of the EXW price of the product offered, and (ii)

the production facility in which those goods will be manufactured or assembled has

been engaged in manufacturing/assembling such goods at least since the time of

bid submission.

(b) Group B: all other bids offering goods from within the country of the Borrower.

(c) Group C: bids offering the goods from abroad and to be directly imported.

3. The EXW price quoted by a Group A bidder shall include all duties and taxes paid

or payable on the basic materials or components purchased in the domestic market or im-

ported. Similarly, prices quoted by Group B bidders shall include all duties and taxes on

components and raw materials. The price quoted by Group A and B bidders shall ex-

clude the sales and similar taxes on the finished product. The price quoted by Group C

Page 104: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

46 Guidelines Procurement under IBRD Loans and IDA Credits

bidders shall be on CIF or CIP border point or other destination, exclusive of customs

duties and other import taxes.

4. In the first step, all evaluated bids in each group shall be compared to determine the

lowest evaluated bid in each. Such lowest evaluated bids shall then be compared with

each other and if, as a result of this comparison, a bid from Group A or Group B is the

lowest, it shall be selected for the award.

5. If, as a result of the comparison under paragraph 4 above, the lowest evaluated bid

is a bid from Group C, all Group C bids shall be further compared with the lowest evalu-

ated bid from Group A after adding to the evaluated bid price of the imported goods of-

fered in each Group C bid, for the purpose of this further comparison only, an amount

equal to: (i) the amount of duties and other related import charges which a nonexempt

importer would have to pay for the importation of the goods offered in such Group C

bid; or (ii) 15 percent of the CIF or CIP bid price of such goods if said duties and

charges exceed 15 percent of such price. If the Group A bid in such further comparison

is the lowest, it shall be selected for the award; if not, the lowest evaluated bid from

Group C, as determined from the comparison under paragraph 4, shall be selected.

6. In the case of single responsibility, supply and installation or turnkey (W contracts

in which a number of discrete items of equipment is grouped into one contract package,

the preference margin shall not be applied to the whole package, but only to the locally-

manufactured equipment within the package. Equipment offered from abroad shall be

quoted CIF or CIP, and equipment offered locally EXW (free of sales and similar

taxes); all other components, such as design, works, installation, and supervision,

shall be quoted separately. Bids should not be classified into groups A,1B, or C. In the

comparison of bids, only the CIF or CIP price in each bid of the equipment offered from

outside the Borrower's country shall be increased by the applicable duty and other taxes

payable by a nonexempt importer or 15 percent, whichever is less. If duties vary from

item to item within a package, the appropriate tariff for each piece of equipment shall

apply. No preference shall be applied for any associated services or works included in the

package.

C44D These provisions apply only if customs duties are excluded from the bid prices, and the priceof imported goods quoted is on a CIF or CIP basis.

Page 105: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

Appendix 47

Preference for Domestic Contractors

7. For contracts for works to be awarded on the basis of ICB, eligible Borrowers may,

with the agreement of the Bank, grant a margin of preference of 7. 5 percent to domes-

tic Contractors, C45) in accordance with, and subject to, the following provisions:

(a) Contractors applying for such preference shall be asked to provide, as part of the

data for qualification, C46) such information, including details of ownership, as

shall be required to determine whether, according to the classification established

by the Borrower and accepted by the Bank, a particular Contractor or group of

Contractors qualifies for a domestic preference. The bidding documents shall

clearly indicate the preference and the method that will be followed in the evalua-

tion and comparison of bids to give effect to such preference.

(b) After bids have been received and reviewed by the Borrower, responsive bids shall

be classified into the following groups:

(i) Group A: bids offered by domestic Contractors eligible for the preference.

(ii) Group B: bids offered by other Contractors.

For the purpose of evaluation and comparison of bids, an amount equal to 7. 5 percent of

the bid amount shall be added to bids received from Contractors in Group B.

s45 )Preference for domestic Contractors is applicable only in countries which qualify. See sub-

para. 2. 54(b).

C46 At the prequalification and/or at the bidding stage.

Page 106: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

48 Guidelines Procurement under IBRD Loans and IDA Credits

Appendix 3

DISBURSEMENTS

1. The responsibility for the implementation of the project, and therefore for the pay-

ment of goods, works, and services under the project, rests solely with the Borrower.

The Bank, for its part, is required by its Articles of Agreement to ensure that funds are

paid from a Bank loan only as expenditures are incurred. Disbursements of the proceeds

of a loan are made only at the Borrower's request. Supporting evidence that the funds

are used in accordance with the Loan Agreement shall be submitted with the Borrower'

s withdrawal application. Payment may be made (i) to reimburse the Borrower for pay-

ment(s) already made from its own resources, (ii) directly to a third party (usually to a

Supplier or Consultant), or (iii) to a commercial bank for expenditures against a World

Bank Special Commitment covering a commercial bank's letter of credit.

2. Two widely used procedures with special requirements are Statements of Expendi-

ture (SOEs) and Special Accounts (SAs). The SOE method is used to reimburse the

Borrower when documentation would otherwise be cumbersome or voluminous (for ex-

ample, expenditures on civil works carried out by force account or payments against

small contracts or purchase orders). For withdrawals against SOEs, the Borrower sub-

mits a form with details of the expenditures (the SOE form) and retains the actual sup-

porting documentation in the field for subsequent examination by independent auditors

and Bank supervision missions.

3. Special Accounts (SAs) are revolving accounts funded with an advance from a

Bank loan for use by the Borrower exclusively to cover the Bank's share of eligible ex-

penses in both local and foreign currencies. The primary objective of the SA is to help

the Borrower overcome cash flow problems and speed disbursements. The Borrower

makes payments from the account to Contractors, Suppliers, and others when the pay-

ments are due. The Bank replenishes the SA regularly upon receipt of a withdrawal ap-

plication with appropriate supporting documentation from the Borrower. Towards the

end of loan disbursements, the Bank initiates a recovery procedure to obtain full docu-

Page 107: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

Appendix 49

mentation for the amount of the outstanding advance.

4. The Loan Agreement and the disbursement letter outline the disbursement proce-

dures to be followed for the loan, including retroactive financing provisions, items eligi-

ble for disbursement under the Statement of Expenditure (SOE) procedure, require-

ments for the operation of a Special Account (SA), and a minimum application value.

The minimum value varies among loans depending on the size of the loan and the nature

of the project. Where there is an SA, the minimum value is generally between 10 per-

cent and 33 percent of the total advanced to the SA. The method of payment specified

in the bidding documents shall take into account the disbursement procedures applicableto the concerned loan.

5. A complete description of the Bank' s disbursement procedures is provided in theDisbursement Handbook.

Page 108: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

50 Guidelines Procurement under IBRD Loans and IDA Credits

Appendix 4

GUIDANCE TO BIDDERS

Purpose

1. This Appendix provides guidance to potential bidders wishing to participate in

Bank-financed procurement.

Responsibility for Procurement

2. As emphasized in paragraph 1. 2 of the Guidelines, the Borrower is legally respon-

sible for the procurement. It invites, receives, and evaluates bids, and awards the con-

tract. The contract is between the Borrower and the Supplier or Contractor. The Bank

is not a party to the contract.

Bank's Role

3. As stated in paragraph 1. 11 of the Guidelines, the Bank reviews the procurement

procedures, documents, bid evaluations, award recommendations, and the contract to

ensure that the process is carried out in accordance with agreed procedures, as required

in the Loan Agreement. In the case of major contracts (defined usually by a dollar

threshold in each Loan Agreement), the documents are reviewed by the Bank prior to

their issue, as described in Appendix 1. Also, if, at any time in the procurement pro-

cess (even after the award of contract), the Bank concludes that the agreed procedures

were not followed in any material respect, the Bank may declare misprocurement, as de-

scribed in paragraph 1. 13. However, if a Borrower has awarded a contract after obtain-

ing the Bank' s "no objection, " the Bank will declare misprocurement only if the "no ob-

jection" was issued on the basis of incomplete, inaccurate, or misleading information

furnished by the Borrower. Furthermore, if the Bank determines that corrupt or fraud-

ulent practices were engaged in by representatives of the Borrower or of the bidder, the

Bank may impose the applicable sanctions set forth in paragraph 1. 15 of the Guidelines.

Page 109: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

Appendix 51

4. The Bank has published Standard Bidding Documents (SBDs) for various types of

procurement. As stated in paragraph 2. 12 of the Guidelines, it is mandatory for the

Borrower to use these documents, with minimum changes to address country- and pro-

ject-specific issues. The prequalification and bidding documents are finalized and issued

by the Borrower.

Information on Bidding

5. Information on bidding opportunities under ICB may be obtained from the General

Procurement Notice and the Specific Invitation to prequalify or to bid, as described in

paragraphs 2. 7 and 2. 8 of the Guidelines. General guidance on participation, C471 as well

as advance information on business opportunities in upcoming projects, may be obtained

from publications which can be obtained through subscription to the United Nations De-

velopment Business (UNDB), as well as from the Public Information Center. C48 Staff

Appraisal Reports are also available from the Public Information Center upon approval of

the loan.

Bidder's Role

6. Once a bidder receives the prequalification or bidding document, the bidder should

study the documents carefully to decide if it can meet the technical, commercial, and

contractual conditions, and if so, proceed to prepare its bid. The bidder should then

critically review the documents to see if there is any ambiguity, omission, or internal

contradiction, or any feature of specifications or other conditions which are unclear or

appear discriminatory or restrictive; if so, it should seek clarification from the Borrow-

er, in writing, within the time period specified in the bidding documents for seeking

clarifications.

7. The criteria and methodology for selection of the successful bidder are outlined in

the bidding documents, generally under Instructions to Bidders and Specifications. If

these are not clear, clarification should be similarly sought from the Borrower.

8. In this connection it should be emphasized that the specific bidding documents is-

C47 The Guide to International Business Opportunities.

C48D The UNDB address is listed in footnote 18. The Public Information Center address is the

World Bank address at 1818H Street, N. W. , Washington, D. C. , 20433, U. S. A.

Page 110: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

52 Guidelines Procurement under IBRD Loans and IDA Credits

sued by the Borrower govern each procurement, as stated in paragraph 1. 1 of the

Guidelines. If a bidder feels that any of the provisions in the documents are inconsistent

with the Guidelines, it should also raise this with the Borrower.

9. It is the responsibility of the bidder to raise any issue of ambiguity, contradiction,

omission, etc. , prior to the submission of its bid, to assure submission of a fully respon-

sive and compliant bid, including all the supporting documents requested in the bidding

documents. Noncompliance with critical (technical and commercial) requirements will

result in rejection of the bid. If a bidder wishes to propose deviations to a noncritical re-

quirement, or propose an alternative solution, the bidder should quote the price for the

fully compliant bid and then separately indicate the adjustment in price that can be of-

fered if the deviation or alternative solution is accepted. Once bids are received and pub-

licly opened, bidders will not be required or permitted to change the price or substance of

a bid.

Confidential ity

10. As stated in paragraph 2. 46, the process of bid evaluation shall be confidential

until the award is notified. This is essential to enable the Borrower and Bank reviewers

to avoid either the reality or perception of improper interference. If at this stage a bidder

wishes to bring additional information to the notice of the Borrower, the Bank, or both,

it should do so in writing.

Action by the Bank

11. Bidders are free to send copies of their communications on issues and questions

with the Borrower to the Bank or to write to the Bank directly, when Borrowers do not

respond promptly, or the communication is a complaint against the Borrower. All such

communications should be addressed to the Chief of the Division for the relevant sector

for the borrowing country, with a copy to the Regional Procurement Adviser.

12. References received by the Bank from potential bidders, prior to the closing date

for submission of the bids, will, if appropriate, be referred to the Borrower with the

Bank's comments and advice, for action or response.

13. Communication received from bidders after the opening of the bids, will be han-

dled as follows. In the case of contracts not subject to prior review by the Bank, the

communication will be sent to the Borrower for due consideration and appropriate ac-

Page 111: World Bank Document · 2016. 7. 12. · AbtlR WEt#e;X-&tX6AIEl

Appendix 53

tion, if any, and these will be reviewed during subsequent supervision of the project by

Bank staff. In the cases of contracts subject to the prior review process the communica-

tion will be examined by the Bank, in consultation with the Borrower. If additional data

is required to complete this process, these will be obtained from the Borrower. If addi-

tional information or clarification is required from the bidder, the Bank will ask the Bor-

rower to obtain it and comment or incorporate it, as appropriate, in the evaluation re-

port. The Bank's review will not be completed until the communication is fully exam-

ined and considered.

14. Except for acknowledgment, the Bank will not enter into discussion or correspon-

dence with any bidder during the evaluation and review process of the procurement, un-

til award of the contract is notified.

Debriefing

15. If, after notification of award, a bidder wishes to ascertain the grounds on which

its bid was not selected, it should address its request to the Borrower. If the bidder is

not satisfied with the explanation given and wishes to seek a meeting with the Bank, it

may do so by addressing the Regional Procurement Adviser for the borrowing country,

who will arrange a meeting at the appropriate level and with the relevant staff. In this

discussion, only the bidder's bid can be discussed and not the bids of competitors.