WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 /...

68
NAME OF CONTACT TYPE INSTITUTION Sampo Kangastalo REGIONAL/LOCAL ADMINISTRATION Tornio City Anu Rautiala REGIONAL/LOCAL ADMINISTRATION Tornio City Aapo Mäenpää REGIONAL/LOCAL ADMINISTRATION Tornio City Göran Wigren REGIONAL/LOCAL ADMINISTRATION Haparanda City Tiina Elo REGIONAL/LOCAL ADMINISTRATION Lapin Liitto Riikka Pyykkö PUBLIC BODY The Museum of Tornio Valley Virve Sallisalmi PUBLIC BODY Tranboundary river comission Marika Saranne RESEARCH Lapin ammattikorkeakoulu Anne-Mari Söderström ECONOMY SECTOR MTK Petri Leinonen ECONOMY SECTOR Farmer Martti Isto ECONOMY SECTOR Farmer Markku Vaaraniemi ECONOMY SECTOR Fishers WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka: ilmoitetaan myöhemmin / informed later AGENDA / OHJELMA (3 tuntia/hours) 10 min Welcome / Tervetuloa Sampo Kangastalo (City of Tornio / Tornion kaupunki), Göran Wigren (City of Haaparanta / Haaparannan kaupunki), Juanjo Galan (Aalto University / Aalto yliopisto) 10 min Presentation / Esittely all stakeholders / kaikki osallistujat 15 min What is AELCLIC? / AELCLIC-hankkeen esittely Juanjo Galan (Aalto University / Aalto yliopisto.) 40 min Presentations of City of Tornio and Haaparanta / Tornion ja Haaparannan kaupunkien esitykset Sampo Kangastalo & Göran Wigren 90 min Working in teams / Työryhmätyöskentelyä + Coffee / kahvi 15 min Webpages and workplan for the workshop 2 / Hankkeen verkkosivut ja seuraavasta työpajasta sopiminen Working in teams, a proposal, 3 tasks: TASK 1, 15 min + 15 min presentation and discussion: Describe in one or few words: What are the main values of the Tornio river valley for you? What is important in the Tornio river valley landscape for you or for the sector/community you are representing? TASK 2, 15 min + 15 min presentation and discussion : Write in few words: What do you know about climate change? How might it affect the Tornio river valley and your daily life and productive activities? TASK 3, 15 min + 15 min presentation and discussion : Write in few words: How do you think that the AELCLIC project can contribute to the Climate change adaptation in the Tornio River Valley? METHODS: write your ideas as KEYWORDS in post-it -notes, stick your post-its in a poster, present your KEYWORDS to the other participants. We’ll make a Word-Cloud to begin the next workshop. AELCLIC_PATHFINDER project Tornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Transcript of WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 /...

Page 1: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

NAME OF CONTACT TYPE INSTITUTION

Sampo Kangastalo REGIONAL/LOCAL ADMINISTRATION Tornio City

Anu Rautiala REGIONAL/LOCAL ADMINISTRATION Tornio City

Aapo Mäenpää REGIONAL/LOCAL ADMINISTRATION Tornio City

Göran Wigren REGIONAL/LOCAL ADMINISTRATION Haparanda City

Tiina Elo REGIONAL/LOCAL ADMINISTRATION Lapin Liitto

Riikka Pyykkö PUBLIC BODY The Museum of Tornio Valley

Virve Sallisalmi PUBLIC BODY Tranboundary river comission

Marika Saranne RESEARCH Lapin ammattikorkeakoulu

Anne-Mari Söderström

ECONOMY SECTOR MTK

Petri Leinonen ECONOMY SECTOR Farmer

Martti Isto ECONOMY SECTOR Farmer

Markku Vaaraniemi ECONOMY SECTOR Fishers

WORKSHOP 1 / TYÖPAJA 1

Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30Place / Paikka: ilmoitetaan myöhemmin / informed later

AGENDA / OHJELMA (3 tuntia/hours) • 10 min Welcome / Tervetuloa – Sampo Kangastalo (City of Tornio / Tornion kaupunki), Göran Wigren (City of

Haaparanta / Haaparannan kaupunki), Juanjo Galan (Aalto University / Aalto yliopisto)

• 10 min Presentation / Esittely – all stakeholders / kaikki osallistujat

• 15 min What is AELCLIC? / AELCLIC-hankkeen esittely – Juanjo Galan (Aalto University / Aalto yliopisto.)

• 40 min Presentations of City of Tornio and Haaparanta / Tornion ja Haaparannan kaupunkien esitykset – Sampo Kangastalo & Göran Wigren

• 90 min Working in teams / Työryhmätyöskentelyä + Coffee / kahvi

• 15 min Webpages and workplan for the workshop 2 / Hankkeen verkkosivut ja seuraavasta työpajasta sopiminen

Working in teams, a proposal, 3 tasks:TASK 1, 15 min + 15 min presentation and discussion:Describe in one or few words: • What are the main values of the Tornio river valley for you?• What is important in the Tornio river valley landscape for you or for the sector/community you are representing?

TASK 2, 15 min + 15 min presentation and discussion :Write in few words:• What do you know about climate change? How might it affect the Tornio river valley and your daily life and productive

activities?

TASK 3, 15 min + 15 min presentation and discussion :Write in few words:• How do you think that the AELCLIC project can contribute to the Climate change adaptation in the Tornio River Valley?

METHODS: write your ideas as KEYWORDS in post-it -notes, stick your post-its in a poster, present your KEYWORDS to the otherparticipants. We’ll make a Word-Cloud to begin the next workshop.

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 2: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

AELCLIC_PATHFINDER

Page 3: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

AELCLIC_PATHFINDER_in a Nutshell

NEED: Concerning Climate Change adaptation, there is a need to align agendas and visions of the

different types of stakeholders involved in the management and transformation of the landscape, both in rural and urban areas as well as in transitional spaces.

GOAL: The AELCLIC-PATHFINDER would define and test MODELS for the configuration of regional/local

(bottom-up) networks with the social, financial, administrative and technical capacity to co -define Landscape Adaptation Plans to Climate Change (LACAPs).

OUTCOME & METHOD: The final outcome of the AELCLIC-PATHFINDER would be a set of

regional/local Consortia in a strategically selected set of 16 European Pilot Landscapes that have been chosen in order to cover the climatic, socio-economic, cultural and biogeographical diversity of Europe and in order to produce highly transferable and scalable models.

USERS: The final users of the models and results will be firstly the regional/local communities where the

Consortia will been defined as a result of the AELCLIC-PATHFINDER.

Page 4: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

5 WORK PACKAGES and 4 REGIONS:

WP1: coordination + Web + general dissemination- Coordinator of the WP1: Aalto Univ.

WP2: implementation in NORTHERN EUROPE (1 Leading Pilot (MALMI District of Helsinki) + 3 Multiplier Pilots (Tornio river valley

(FI-SE), Hyypänjoki cultural landscape (FI) and Tonder marshlands (DK))

WP3: implementation in ATLANTIC AND ALPINE EUROPE (1 Leading Pilot (Lowland peat and polder landscape of Holland (NL)) + 3

Multiplier Pilots (Bertra beach dune system, county Mayo ( IR), Haute Tarantaise valley (FR), Mount Saint Michel (FR))

WP4: implementation in SOUTH-WESTERN EUROPE (1 Leading Pilot (Pilot area: Huerta de Valencia) + 3 Multiplier Pilots (Priorat

County (ES), Touristic areas of Northern Tenerife (ES), Coastal Landscapes of Vila do Conde (PT))

WP5: implementation in SOUTH-EASTERN EUROPE (1 Leading Pilot (Urban Fringe areas of Bologna) + 3 Multiplier Pilots (Mantova

City Center (IT), Sicily agriculatural area (IT), Periurban fri´nge of Bucharest (RO))

AELCLIC_PATHFINDER_in a Nutshell

Page 5: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

AELCLIC PATHFINDER (Pilot Landscapes & Partners/Third Parties)

PARTNERS: WAGENINGEN UNIVERSITY + PROVINCE OF ZUID-HOLLANDLEADING PILOT LANDSCAPE: LOWLAND PEAT AND POLDER LANDSCAPE OF HOLLANDREGIONAL THIRD PARTNER: LANDSCAPE OBSERVATORY OF THE NETHERLANDS

PARTNERS: POLYTECHNIC UNIV VALENCIA + LAS NAVES (CITY OF VALENCIA)LEADING PILOT LANDSCAPE: HUERTA DE VALENCIA (ES)

PARTNERS: UNIVERSITY OF BOLOGNA + CITY OF BOLOGNA + FONDAZIONE PER L’INNOVAZIONE URBANALEADING PILOT LANDSCAPE: FRINGE AREAS OF BOLOGNA

MULTIPLIER PILOT LANDSCAPE: TORNIO RIVER VALLEY (FI-SE))

REGIONAL THIRD PARTY: LANDSCAPE OBSERVATORY OF FINLAND

MULTIPLIER PILOT LANDSCAPE: HYYPÄNJOKI CULTURAL LANDSCAPE (FI)

REGIONAL THIRD PARTY: LANDSCAPE OBSERVATORY OF FINLAND

MULTIPLIER PILOT LANDSCAPE: TONDER MARSHLANDS (DK)

MULTIPLIER PILOT LANDSCAPE: BERTRA BEACH DUNE SYSTEM, COUNTY MAYO (IR)

REGIONAL THIRD PARTY: NATIONAL UNIVERSITY OF IRELAND-GALWAY

MULTIPLIER PILOT LANDSCAPE: MOUNT SAINT MICHEL (FR)

MULTIPLIER PILOT LANDSCAPE: MER DE GLACE AND ALPINE GLACIERS (FR)

MULTIPLIER PILOT LANDSCAPE: TOWN AND VALLEY OF IVREA(IT))REGIONAL THIRD PARTY: UNIVERSITÀ IUAV DI VENEZIA

MULTIPLIER PILOT LANDSCAPE: AGRICULTURAL LANDSCAPES IN THE SICILY REGION (IT)

REGIONAL THIRD PARTY: PIANTE FARO

MULTIPLIER PILOT LANDSCAPE: PRIORAT or PENEDES REGION (ES)

REGIONAL THIRD PARTY: LANDSCAPE OBSERVATORY OF CATALONIA

MULTIPLIER PILOT LANDSCAPE: VILA DO CONDE COASTAL LANDSCAPE (PT)).

REGIONAL THIRD PARTY: UNIVERSITY OF PORTO

MULTIPLIER PILOT LANDSCAPE: TOURISTIC ZONES OF NORTHERN TENERIFE (ES)

REGIONAL THIRD PARTY: LANDSCAPE OBSERVATORY OF CANARIAS

MULTIPLIER PILOT LANDSCAPE: URBAN FRINGE BUCHAREST

REGIONAL THIRD PARTY: EURODITE_BUCHAREST (RO)

AELCLIC partners

Academic

Regions / Cities

NGOS

Business

AELCLIC third parties

Academic

Regions / Cities

NGOS

Business

AELCLIC Leading Pilot Landscapes

AELCLIC Multiplier Pilot Landscapes

EUROPEAN NETWORKS

- UNISCAPE (UNIVERSITIES)

- CIVILSCAPE (CIVIL SOCIETY ORGANIZATIONS (NGOs)

PARTNERS: AALTO UNIVERSITY + CITY OF HELSINKILEADING PILOT LANDSCAPE: SITE IN THE METROPOLITAN AREA OF HELSINKI

(OLD MALMI AREA)

Page 6: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

AELCLIC PATHFINDER_METHODS AND SCHEDULE

15th FEBRUARY Kick-off 15 MARCH 15 APRIL 15 MAY 15 JUNE 15 JULY 15 AUGUST 15 SEPTEMBER 15 OCTOBER 15 NOVEMBER 15 DECEMBER END

IMPLEMENTATION OF THE PROJECT (WP1, 2, 3, 4, 5)

PO_x Partial OUTPUT in LEADING PILOT / in MULTIPLIER PLOT

PD_x Partial DELIVERABLE in LEADING PILOT/ in MULTIPLIER PILOT

FO_y Final OUTPUT

FD_y Final DELIVERABLE

Partial outputs/deliverables:

(X = 1): Consortium and Working Plan for each Pilot Landscape

(X = 2): Draft Structure and Implementation Plan for a LACAP (per Consortium & Pilot)

(X= 3): Final Structure and Implementation Plan for a LACAP (per Consortium & Pilot)

Final outputs/deliverables:

(Y = 1): Compilation of Final Partial Outputs / Deliverables

(Y = 2): New outputs and deliverables produced after the joint and critical analysis of the final results in each Pilot Landscape

(Y = 3): Guidelines for the constitutions of regional/local Consortiums

(Y = 4) Climate-KIC REPORTS (Performance report, financial report, etc.)

(Y = 5): web with all the deliverables

NOTE_ All the deliverables will be displayed in the web and disseminated by the partners

PHASE 1 PHASE 2 PHASE 3

Sub-Phase 2.1 Sub-Phase 2.2 Sub-Phase 2.3 2.1

PREPARATION CREATION OF REGIONAL/LOCAL CONSORTIA AND CO-DEFINITION OF STRUCTURE, METHODS AND RESOURCES FOR THE PRODUCTION OF A LACAP FINAL OUTPUTS & REPORTING

IDENTIFICATION OF STAKEHOLDERS IN EACH PILOT AREA + DEFINITION OF WORKING PLAN

JOINT WORK OF EACH LOCAL GROUP: DEFINITION OF CLIMATE CHANGE IMPACTS, GOALS, AGENDAS, STRUCTURE & RESOURCES FOR A LACAP

REGIONAL/LOCAL OUTPUTS & AGREEMENTS

PREPARATION FINAL OUTPUTS & REPORTINGIDENTIFICATION OF STAKEHOLDERS IN EACH

PILOT AREA + DEFINITION OF WORKING PLANper REGION (WP2, WP3, WP4, WP5)

JOINT WORK OF EACH REGIONAL/LOCAL GROUP: GOALS, AGENDAS, STRUCTURE, RESOURCES FOR A POTENTIAL LACAP

per REGION (WP2, WP3, WP4, WP5)

REGIONAL/LOCAL OUTPUTS & AGREEMENTS

per (WP2, WP3, WP4, WP5)

WP1: web + channels

By the responsible of WP2, WP3, WP4, WP5, BU2, BU3, BU4, BU5:-Self organization of each team.-Limits of each pilot landscape- Pre-identification of stakeholders for each regional /local consortia

Compilation of Final Partial Outputs / Deliverables New outputs and deliverables produced after the joint and critical analysis of the final results Guidelines for the constitutions of regional/local ConsortiumsClimate-KIC REPORTS

LEADING PILOT LANDSCAPE LEADING PILOT LANDSCAPE LEADING PILOT

MULTIPLIER PILOT LANDSCAPES MULTIPLIER PILOT LANDSCAPES MULTIPLIER PILOT

PO_1/PD_1

PO_1/PD_1

For each Pilot

PO_2/PD_2

PO_2/PD_2

For each Pilot

PO_3/PD_3

PO_3/PD_3

For each Pilot

FO_1 / FD_1

FO_2 / FD_2

FO_3 / FD_3

FD_4

FD_5

PART 2.2.1 Climate Change:

DIAGNOSIS

PART 2.2.2. Climate Change Adaptation:

AGREEING THE KEY CONTENTS FOR A LACAP

PART 2.1.1. IDENTIFYING &

CONTACTING

PART 2.1.2 AGREEING

A WORK PLAN

2.3. Proposal for a local

LACAP & AGREEMENTS

2.1.1 2.1.2 2.2.1 2.2.2 2.3

xx

Page 7: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

STRUCTURE OF THE WEBPAGE (WWW.AELCLIC.COM)

PRESENTATION NORTHERN EUROPE ATLANTIC-ALPINE EUROPE SOUTH-WESTERN EUROPE SOUTH-EASTERN EUROPE RESULTS

-RATIONALE-GOAL-OUTCOMES & USERS

-MAP-PILOT LANDSCAPES

- WORK-PACKAGES Short description

- PARTNERS / 3rd PARTIES Logos and links

- TEAM Representatives from

partners and 3rd parties(names, links and emails)

- GENERAL CONTACTS

- GENERAL DESCRIPTION- PARTNERS & 3rd PARTIES- CONTACT (Coordinator)

- LEADING Pilot Landscape- General Description- Map and pictures- Consortium Members

(logos, links and contacts)- RESULTS:

-Outcome1 /Deliverable1-Outcome2 /Deliverable2-Outcome3 /Deliverable3

- MULTIPLIER Pilot Landsc. 1- General Description- Map and pictures- Consortium Members

(logos, links and contacts)- RESULTS:

-Outcome1 /Deliverable1-Outcome2 /Deliverable2-Outcome3 /Deliverable3

…- MULTIPLIER Pilot Landsc. 2…- MULTIPLIER Pilot Landsc. 3

- GENERAL DESCRIPTION- PARTNERS & 3rd PARTIES- CONTACT (Coordinator)

- LEADING Pilot Landscape- General Description- Map and pictures- Consortium Members

(logos, links and contacts)- RESULTS:

-Outcome1 /Deliverable1-Outcome2 /Deliverable2-Outcome3 /Deliverable3

- MULTIPLIER Pilot Landsc. 1- General Description- Map and pictures- Consortium Members

(logos, links and contacts)- RESULTS:

-Outcome1 /Deliverable1-Outcome2 /Deliverable2-Outcome3 /Deliverable3

…- MULTIPLIER Pilot Landsc. 2…- MULTIPLIER Pilot Landsc. 3

- GENERAL DESCRIPTION- PARTNERS & 3rd PARTIES- CONTACT (Coordinator)

- LEADING Pilot Landscape- General Description- Map and pictures- Consortium Members

(logos, links and contacts)- RESULTS:

-Outcome1 /Deliverable1-Outcome2 /Deliverable2-Outcome3 /Deliverable3

- MULTIPLIER Pilot Landsc. 1- General Description- Map and pictures- Consortium Members

(logos, links and contacts)- RESULTS:

-Outcome1 /Deliverable1-Outcome2 /Deliverable2-Outcome3 /Deliverable3

…- MULTIPLIER Pilot Landsc. 2…- MULTIPLIER Pilot Landsc. 3

- GENERAL DESCRIPTION- PARTNERS & 3rd PARTIES- CONTACT (Coordinator)

- LEADING Pilot Landscape- General Description- Map and pictures- Consortium Members

(logos, links and contacts)- RESULTS:

-Outcome1 /Deliverable1-Outcome2 /Deliverable2-Outcome3 /Deliverable3

- MULTIPLIER Pilot Landsc. 1- General Description- Map and pictures- Consortium Members

(logos, links and contacts)- RESULTS:

-Outcome1 /Deliverable1-Outcome2 /Deliverable2-Outcome3 /Deliverable3

…- MULTIPLIER Pilot Landsc. 2…- MULTIPLIER Pilot Landsc. 3

PARTIAL DELIVERABLES:- Σ Deliverables1- Σ Deliverables2- Σ Deliverables3

SUMMARY of PARTIAL DELIVERABLES

FINDINGS & GUIDELINES

DRAFT OF SCIENTIFIC ARTICLE 1

DRAFT OF SCIENTIFIC ARTICLE 2

LETTERS OF COMMITMENT FROM THE MEMBERS OF EACH CONSORTIUM

(WWW.AELCLIC.COM)

Page 8: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

AELCLIC_PATHFINDER project

Page 9: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

AELCLIC_project

TORNIO RIVER_Pilot Landscape

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 10: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 11: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 12: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

The Tornio River Valley has been selected as one of the 16 European landscapes of the AELCLIC -Pathfinder project (Adaptation of European Landscapes to Climate Change) funded by EIT_Climate-KIC (EU).

WHY?: This decision was based on its location in the highly sensitive Boreal area, on its exceptional environmental and cultural va lues, on its transnational

character and on the deep connection between local economy and natural landscape .

WHAT?: The AELCLIC-Pathfinder will create a local network (Consortium) for the future development of a Landscape Adaptation Plan to Cli mate Change

(LACAP). This network or Consortium will be integrated by local authorities, civil organizations, economic actors (e.g. compa nies working with tourism,

f ishing, forestry, etc.) and academic/scientif ic institutions.

FINAL OUTCOME?: By the end of the AELCLIC_pathfinder project the Tornio River Valley will have:

• A diagnosis of Climate Change impacts in the local economy, ways of l iving, environment, cultural heritage and levels of wellbeing. This diagnosis will be

based in the CO-IDENTIFICATION of impacts by all the stakeholders on the base of existing national or regional reports and studies.

• A CO-DEFINED document with the GOALS, STRUCTURE and MAIN CONTENTS that a future Landscape Adaptation Plan to Climate Change should have for

the Tornio River Valley. This document will be agreed collectively by all the stakeholders.

• A Joint LETTER of COMMITMENT in which all the members of the Local Network (Consortium) will express their will ingness to advance in the future

preparation of a local Landscape Adaptation Plan to Climate Change.

HOW?: The Tornio River Valley is included in the NORTHERN -EUROPE area of the AELCLIC-pathfinder. This area is coordinated by the Aalto University in

collaboration with the Landscape Observatory of Finland. The participation of local stakeholders will not imply any economic duty. Basically they will be

invited to participate in the organization of the following 3 workshops and to disseminate the project through their own chan nels.

• WORKSHOP 1: (1 day, March-April 2019): After conforming the local network, the stakeholders will agree a work plan for the next sub-phases and

workshops

• WORKSHOP 2: (1 day, May-June 2019): Co-Identif ication by the local Consortium (stakeholders) of the potential impacts of Climate Change in their ways

of l iving, economic activit ies, environmental and cultural assets

• WORKSHOP 3: (1 day, July-September): Co-Definition of goals, agendas, contents and co-identif ication of potential economic resources for the future

development of a LACAP (after the AELCLIC-pathfinder is f inished)

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 13: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

TORNIO TOURISM MASTERPLAN

TORNIO CITY STRATEGY 2017-2021

The Tornio River Valley has been selected as one of the 16 European landscapes of the AELCLIC -Pathfinder project (Adaptation of European Landscapes to Climate Change) funded by EIT_Climate-KIC (EU).

The Pilot will include the inhabited areas of the municipalities of Tornio (FI) and Haaparanta (SE). The municipalities have already confirmed their involvement. We need to investigate how the AELCLIC project would relate or could create synergies with other planning documents and visions.

● northern river valley between Finland and Sweden● large area with few residents● both urban and agricultural/forestry and cultural components● two cities and municipalities Tornio (FI) and Haaparanta (SE)● boundaries not yet demarcated

TORNIO- (FI) – VISION 2027

HAAPARANTA (SE) –PLAN/STRATEGY

TORNIO-HAPARANDA-VISION 2027

AELCLICPILOT_

TORNIORIVER

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 14: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Towards the WORKSHOP 2: CO-IDENTIFICATION OF CLIMATE CHANGE IMPACTS AND OPPORTUNITIES:- How will Climate Change Will affect your daily life, the productive activities that you develop in the landscape, the identity of your landscape?

- Any initial ideas for Climate Change adaptation and mitigation?

- When??:

Source: European Environmental AgencySource: European Environmental Agency

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 15: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Towards the WORKSHOP 2: CO-IDENTIFICATION OF CLIMATE CHANGE IMPACTS AND OPPORTUNITIES:- How will Climate Change Will affect your daily life, the productive activities that you develop in the landscape, the identity of your landscape?- Any initial ideas for Climate Change adaptation and mitigation?

Source: European Environmental Agency

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 16: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Towards the WORKSHOP 2: CO-IDENTIFICATION OF CLIMATE CHANGE IMPACTS AND OPPORTUNITIES:- How will Climate Change Will affect your daily life, the productive activities that you develop in the landscape, the identity of your landscape?- Any initial ideas for Climate Change adaptation and mitigation?

Source: Ministry of the Environment, the Ministry ofAgriculture and Forestry, the Ministry of Employmentand the Economy and Climateguide.fi andClimateguide.fi

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 17: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Towards the WORKSHOP 2: CO-IDENTIFICATION OF CLIMATE CHANGE IMPACTS AND OPPORTUNITIES:- How will Climate Change Will affect your daily life, the productive activities that you develop in the landscape, the identity of your landscape?- Any initial ideas for Climate Change adaptation and mitigation?

Source: Ministry of the Environment, the Ministry of Agriculture and Forestry, the Ministry of Employment and the Economy and Climateguide.fi and Climateguide.fi

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 18: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Towards the WORKSHOP 3?: CO-DEFINITION OB BASIC GOALS AND CONTENTS OF A FUTURE LANDSCAPE ADAPTATION PLAN:- When??:

Source: Victorias Climate Change adaptation Source: The Blackfeet Climate Change Adaptation Plan – Blackfeet Country and Climate Change

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 19: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Towards the WORKSHOP 3?: CO-DEFINITION OB BASIC GOALS AND CONTENTS OF A FUTURE LANDSCAPE ADAPTATION PLAN:- When??:

Source: Climate Change Adaptation Strategy - City of Melbourne Source: Tipperary Sustainable Energy Action Plan 2017-2020

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 20: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Moving towards a CLIMATE_KIK DEMOSTRATOR?

AELCLIC_PATHFINDER projectTornio River_Pilot Landscape_WORKSHOP1 (24.5.2019)

Page 21: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

AELCLIC

Työpaja 1

24.5.2019

Welcome to TornioHaparanda!

Sampo KangastaloKehitysjohtajaTornion kaupunki

Göran WigrenChef, samhällsbyggnadsförvaltningenHaparanda stad

Page 22: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:
Page 23: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Twincity TornioHaparanda

TORNIO FINLAND

HAPARANDA SWEDEN

TORNIONJOKIRIVER

Page 24: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

TornioHaparanda is located at the border of two time zones and several geographic and administrative areas. We are – simultaneously – in Lapland, Sea Lapland and the Torne River Valley.

We are also part of the Bothnian Arc, as well as the Barents and Baltic Sea areas, the North

Calotte and of Europe. We are many.

WE ARE LOCATED ON THE BORDER

Page 25: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

TORNIOHAPARANDA = AN INTERNATIONAL TWIN CITY

Together with Sweden's Haparanda we form a unique, international twin city of 32,000 inhabitantson the border of two states.

The Finnish and Swedish languages and cultures meet here, as do the river and the sea, the border trade, as well as a lively stream of traffic and

tourists.

Our joint city center is growing on the national boundary of Finland and Sweden.

Page 26: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

BRIEF HISTORY OF REGION

Tornio has been a historical market place from themiddle ages

1621 Town rights (Swedish King Gustav II Adolf)

1647 First church

1621-1788 Northernmost town in the world

1808-1809 Finnish war

Sweden (including Finland) against Russia

Current borderline was created in 1809

Finland remained a Grand Duchy in the Russian Empire

1821 Haparanda was founded in Sweden

1917 Finland declared independence

1973 New Tornio (Merged municipalities: Tornio, Alatornio, Karunki)

12.5.2021 Tornio 400 years celebration

Page 27: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

REGIONAL STRATEGY OF TORNIO VALLEY

The Council of Torne Valley

- Founded in 1987

- Swedish federation of municipalities and a transnationalNordic committee based in Haparanda

- The Council of Torne Valley operates on the Finnish and Swedish sides of the Tornio valley and in their adjacent areas in Norway. 6 + 4 + 3 members

Vision Most integrated border region in Europe

Mission The Torne Valley Council is a cooperativemember and trustee of its affiliatedmunicipalities

Strategic goals Infrastructure

Business and tourism

Culture

Education

Increasing vitality of Torne Valley

Page 28: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

TORNIOHAPARANDA CO-OPERATION

WHY?

Question of survival

Better services for residents at lower cost

Development and growth

HOW?

Very strong local political support

TRUE partnership culture

+

=

Page 29: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Tornio

Town council

Haparanda

Town council

Common meeting once a year

Tornio

Town board

Haparanda

Town board

Common meeting twice a year

Cooperation board

5 + 5 members

Business

development

Leading group

5 + 5 members

CooperationDeveloper

Working and project groups

TORNIOHAPARANDA CBC ORGANISATION

Culture, youth,

leisure

Technical

Services

Projects / Education

steering groups

Page 30: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

The Cross Border CooperationOrganization: Provincia Bothniensis(1987-)

Provincia Bothniensis Board

Cross Border Cooperation DevelopmentSpecialist (50/50)

Joint City Council meetings twice/year

Joint City Board meetings twice/year

Joint work- & project groups

Joint projects, services, infrastructure, investments, events …

Approximately 20 major agreements between Tornio and Haparanda

Main agreement of Tornio-Haparanda Cross Border Cooperation

Free choice of school and nursery

Language school (classes: 1-9)

Fire and Rescue Service

Cooperation

Cooperation in Ambulance Services

TornioHaparanda Travel Center

Merging of Tourist Offices

Joint Sewage Treatment Plant

District Heating Networks

Flood Protection

The Provincial Museum of Torne Valley

Cooperation in Culture-, Youth-and Leisure Services (eg. joint use of facilities, events, disco, floorball, ice hockey, etc.)

TORNIOHAPARANDA CBC

Page 31: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

SOME RESULTS OF CO-OPERATION

Page 32: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

TORNIO – TOURISM MASTERPLAN

Page 33: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

TORNIO – TOURISM MASTERPLAN- Development areas

Page 34: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

WE ARE BUILDING OUR CITIES TOGETHER

Page 35: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

PLANNING AREA 2019

Page 36: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

BORDER AREA 202xTwo Cities – One Heart

Page 37: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

TORNIOHAPARANDA VISION 2020

Page 38: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

CITY OF TORNIOCURRENT ISSUES

2019

Page 39: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

TORNIO 2019398 years old (12.5.1621)

The oldest city in Lapland.

21 900 inhabitants.

The second largest city in Lapland.

8 600 jobs.

With Outokumpu as our major employer.

3 000 000 visitors On the Border.

The International Trade Center of the North Calotte.

3 000 000 FT. Transports from the port of Röyttä. The greatest port in Lapland.

14 000 000 border-crossings per year.

The busiest land border crossing point in

Finland.

Whether you live in the city center or in the

tranquility of the countryside, by the sea

or by the unharnessed salmon river –

– no matter what you choose, the services of

two countries are always within your reach.

Page 40: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

TORNIO VISION 2027THE MOST FUNCTIONAL BORDERCITY

IN THE WORLD

Our values1. Continuous renewal

2. Customer oriented approach3. Transparency

4. Safety5. Sustainability

Page 41: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

PRIORITY PROJECTS 2017-2021

IN TORNIO Tornio Tourism Masterplan

Utilizing the international attraction for Lapland tourism

Improving accessibility to Tornio and Sea Lapland

Bothnian Corridor TEN-T core network corridor,

Electrification of the Tornio-Laurila track,

Developing Kemi-Tornio airport

Arctio – Tornio Energy,Industrial and Logistics Park

New business district in the vicinity of the LNG terminal

Development of a joint core for Tornio and Haparanda (E14)

Implementation of the Europan14 ArchitecturalCompetition Area

Tornio 400th Anniversary 12.5.2021

Implementation of the anniversary of the city

of Tornio

Page 42: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

STRATEGY SUMMARY

Page 43: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

LOGISTICS HUB

Busiest border crossing point in Finland by road traffic

Kemi-Tornio Airport

1.5 h flight to Helsinki

Oulu, Luleå and Rovaniemi 130 km

Train connection to Kolari and Helsinki. Border crossing betweenSweden and Finland.

TornioHaparanda Travel Center

Joint Bus station

Port of Tornio Röyttä

Greatest port in Lapland Finland

Page 44: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Bothnian Core Network CorridorTEN-T core network corridors 2018 /North Sea – Baltic extension to north 2021

BOTHNIAN CORRIDOR- Extension of the TEN-T core network corridor 2021-2027

The European Commission proposal 6.6.2018 Strong Nordic co-operation and support needed for the final decision (European

parliament / The Council of the EU) - spring /summer 2019

Page 45: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

BUSINESS LIFE IN TORNIO

MAIN BUSINESS FIELDS- Manufacturing dominates but service sector is totally 55,7 % of all jobs

Page 46: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

OUTOKUMPU KEMI-TORNIO SITE

OUTOKUMPU STEEL MILL IS THE MOST INTEGRATED STAINLESS STEEL MILL IN THE WORLD – 2400 WORKERS / STAINLESS STEEL, FERROCHROME, PORT, KEMI MINE

Page 47: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

LNG-TERMINAL AND ARCTIO AREA

ARCTIO – TORNIO ENERGY, INDUSTRIAL AND LOGISTICS PARK

http://www.bothnianbusiness.fi/arctio-2/arctio/arctio-video/

LNG-TERMINAL- THE LARGEST LNG TERMINAL

IN NORDIC COUNTRIES- 50 000 m3 STORAGE TANK

- MAKES NEW BUSINESS OPPORTUNITIES

Page 48: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

TOURISM ON THE BORDER

UNESCO World Heritage Site

National Parks and River Tornionjoki

Border Shopping and boundless border

Museums

Other

Page 49: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

HIGHER AND VOCATIONAL EDUCATION IN TORNIOLapland University of Applied Science Ltd.

Vocational College Lappia

Page 50: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Council of Tornio Valley Bothnian Arc

Page 51: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Tornio - Town Twinning

HAMMERFEST

KIROVSK

DEVIZES

VETLANDA

IKAST-BRANDE

SZEKSZARD

Page 52: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

LAND USE PLANNING

Page 53: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Haparanda +

Tornio urban density / structure

Page 54: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Haparanda + Tornio general plans

Page 55: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Juridical partial general plans in Tornio

Page 56: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Juridical detail plans in Tornio

Page 57: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:
Page 58: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:
Page 59: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Haparanda översiktsplan 2013 + Tornion yleiskaava 2021 keskeinen kaupunkialue

Page 60: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Tornio river, Climate Change: some possible effects

-More rain

-Less snow

-Thinner Ice, shorter period with ice

-More +/- temperature changes during winter

-Risks: Flooding, increasing or decreasing?

-Risks: Higher sea water level?

-Technical effects: Waste water systems

-Technical effects: Drinking water systems (Haparanda)

-Biologial effects: Fish

-Biological effects: Plants

-Economic effects: Tourism - fishing, icefishing, non sellablewinter?

Page 61: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

FLOOD PROTECTION

Page 62: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:
Page 63: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:
Page 64: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

TornioHaparanda flood protection

Background

-Initiated after flood in 1990

-Objective to protect central areas from flood

-Two main operations

- Näränperä dam (north of town centre)- Tornionjoki river delta dredging

Page 65: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Näranperä dam-Built in 1998

-~ 1400 m (1300 m SWE, 100 m FIN)

-New hydrologigal model 2012 for Tornionjoki river-Protection from rare floods (1/250 a)

-> increase 0,6 m needed

-New design 2019, construction 2020-2021?

Page 66: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Tornionjoki river delta dredging

- Risk area of ice dams during departure of ice

- Enhanced channel for ice

- ~6 km long

- Built in 2013-2014

20 m width

3,5 m depth

35 m width

4,8 m depth

Page 67: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Contact details: WWW.HAPARANDA.SE

Sampo KangastaloDevelopment Director, City of Tornio

+358 40 764 [email protected]

Thank you!

Page 68: WORKSHOP 1 / TYÖPAJA 1 - aelclicpathfinder.com › wp-content › uploads › ... · WORKSHOP 1 / TYÖPAJA 1 Date and time / Ajankohta: 24.5.2019 klo 12:30-15:30 Place / Paikka:

Contact details: WWW.HAPARANDA.SE

Göran Wigren

Förvaltningschef Samhällsbyggnadsförvaltningen

Samhällsbyggnadsförvaltningen

Torget 9, 953 85 Haparanda

+46 922 260 30

[email protected]

haparanda.se

facebook.com/haparanda

instagram.com/haparandaib

Thank you!