Brechfa Forest Connection Development Consent Order Application - Reference EN020016
Works Plans
Section B – Llangunnor To Peniel Option A
September 2016
Regulation 5(2)(j) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure)
Regulations 2009
85
86
StarBach Cottage
Brynderwen
Parc-y-groes23.0m
Maes-y-lan
22.9m
Pond
LBKiri Lodge
Park-newydd
Pond
Bungalow
Pant20.5m
HEOL CAPEL DEWI /
CAPEL DEWI ROAD
22.0m 17
27
20
11
26
13
19
47
45
51
18
29
23 253633
3031
14
54
42
39
46
Track
Shingle
Drain
Farm
BwthynPenrhiw
Vicarage
DOLG
WILI RO
AD
13.3m
Depot15.7m
CanolfanGwenog
98
1El Sub Sta
Car Park
Car ParkTanks
Doctors
4
51
Tank
Track
Goge
rdden
Pond
Pond
Storno
way
Track
12.2m
6
Palace
Mean HighWater
Mean HighWater
Pond
Church
Y
OldVicarage
Cottage
Sinks
Track
17
B 4300
Ty'r
23
Ponds
11.4m
13.8m
Bwlch
1
Hall
Pond
12
Wenallt
18.2m
7
Afon Gwili
BWLCH
St Cynyr's
Shingle
Min-y
r-Afon
62
ISMYRDDIN
Cwm-Tawel
Drain
Glan Towy
Shingle
Bryn-Towy
3
Llangunnor
NormalTidal Limit
2
Issues
Carrog
War
Cheri
ton
4339
LLOYD'STERRACE
5
2
2l2
4956
Nantcwnlle
82
CLOS
YRON
NEN
2
24
3
PrimarySchool
Castle PigynCrossing8.7m
ABERGWILIROAD
Caer
1
9
13.1m
44
Ty-ni
Bridge
2
GYFREGARDENS
11.6m
15
21
7FFORDD YNant y
Felin
6
Bishops Mill
Drain
Sports Field
MillwoodLodge
1
33
DrainPH
Afon Gwili
58LB
14aCapel
5
7.8m
Abergwili
MS
8
53
Gwili
Manor Gwili
ParkWayside
Clos Glas
8
14
Shelter
Rosegarth
CRYCHIAU
49
Peny-y-bont
14
Maesawelon86Deg
61
94
13
LON CLYCHAVR
GOG
53 4132
HIGH STREET
Pavilion
A 40
Llif yr Afon
Y Felin
Glyn Aur
The Vicarage
2
Bytheway
63
22
Awelfa
9
Issues
92
21
Spring
59
Pen-y-banc
13
9.2m
Hedd-fan
DismantledRailway
7.1m
A 485
4
lO
l
6
Llys
Issues
Path
A 40
Wellfield
9.8m5
1
19
1
NTLMLW
Posts
Track
CNWC
Y GW
ILI1
4
6
12
LB
32
HEOL CAPEL
DEWI / CAPEL
DEWI ROAD
54
Dragons Lair
GreenMeadow DY
FFRY
N TYW
I
312
Llehyfryd
13
Flood Gate
Lodge
5
16
23
40
Mud
Mud
Fan Heulog
Pond
Def
ED BdyCCLW
CR
DefED BdyED Bdy
CR
Pond
Drain
Path
Path
Track
Pond
Path
Drain
Drain
FB
Llys Gwyn
Hollymede Cottage
DW
Slurry Bed
Pond
FB
60 63
Title
ISSUE CHK'D APP'DDRAW
APPLICATION No. GISA1
SCALE1:2,500
ISSUE
COMMENTSDATE
N/A
FCoordinate System: British National GridUnits: MetreProjection: Transverse MercatorDatum: OSGB 1936Scale Factor: 0.9996
243460X Centroid Coordinate: 220700Y Centroid Coordinate:
Notes
Abergwili
Llangunnor
Tanerdy
A485
A40(T)
A40(T)
1
2
SITE MAP
WESTERN POWER DISTRIBUTION (BRECHFA FOREST CONNECTION) ORDERWORKS PLANS - OPTION A
(REGULATION 5(2)(j))SECTION B
SHEET 1 OF 2
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF WESTERN POWER DISTRIBUTIONSHEET 1 OF 2
0 40 80 120 160 200Metres
REPRODUCED FROM ORDNANCE SURVEY MAPS,BY PERMISSION OF THE ORDNANCE SURVEY ON
BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. CONTAINS ORDNANCE
SURVEY DATA © CROWN COPYRIGHT AND DATABASE RIGHTS [2015] OS 0100042840
MAY 2015 AJH
PROJECT DRAWING No.
WESTERN POWER DISTRIBUTION(BRECHFA FOREST
CONNECTION) ORDERWORKS PLANS - OPTION A
(REGULATION 5(2)(j))SECTION B
This drawing is scaled at paper size A1, therefore anyprints taken at smaller sizes will affect accuracy of themeasurement units and should not be scaled against.
B
03_13571_75ORIGINATOR DRAWING No.
15/WPD/018 B/WP/PS/1
KEYSECTION BOUNDARYORDER LIMITSCOMMENCEMENT OF WORKNo.1
XY
XYTRANSITION OF WORK No.1TO COMMENCEMENT OFWORK No.2
X
XTRANSITION OF WORK No.2TO COMMENCEMENT OFWORK No.3
!
! TERMINATION OF WORK No.3PROPOSED OVERHEAD LINE
" PROPOSED TERMINAL POLE! PROPOSED SINGLE POLE" PROPOSED TWIN POLE# EXISTING TOWER EE42#
PROPOSED RWE SUBSTATIONGANTRYPROPOSED UNDERGROUNDCABLE HORIZONTALDIRECTIONAL DRILLPROPOSED UNDERGROUNDCABLE OPEN CUT TRENCHLIMITS OF DEVIATIONLIMITS OF DEVIATION &ORDER LIMITSSATELITE CONSTRUCTIONCOMPOUNDUNDERGROUND CABLE WORKAREAHORIZONTAL DIRECTIONALDRILL WORK AREA
B
A SF JCFOR DCO SUBMISSION
EN020016DRAWING No.
B SEPT 2016 SF BOCLIMITS OF DEVIATION SYMBOLOGY AMENDED JC
87
88
89
90
91
92
106
24.0m
47
88
33a
31
DOLG
WILI RO
AD
8
13.3m
2
Rhandir
56 29.7m
63
Depot
Tawelan
ROAD
Bryn Helyg
Railway
LB
75
35
24.7m
PANTGLAS
58
Issues
92
50
1
59
11
SteepHolm
51
El Sub Sta
Erwlon
Frongelli
45
69
Swn y dial
MPWaterfall
Spring
Glyn View
25.4mPath (um)
108b
2
105
Path (um)
Pond
Gat-goch
Mile Stone
120
97Danrhiw
Bwthyn yGarddwr
Spring
79
MP 247.75
30.5m
114
Issues
Spring
28.0m
1
Derwydd
85
Drain
A 484
BRONWYDD
ROAD
Uwchgwili
Rhiwdywyll
93
108c
122
Gorwel
108
FB
89
Spring
Spring
Upper
Tank
Awelfryn
Carrog
Deri Villas2
Path (um)
Manor-AfonTalhaiarn
Caer
Ty-ni
11.6m
11.8m
6
Nant Oer
Millwood Lodge
13.4m
5
1
Clos Glas
8
Golygfa Deg
Rosegarth
1
1
CRYCHIAU
14
Tyrnant
Nant Crychiau
Y Felin
Glyn Aur
The Cottage
CastlePigyn Lodge
Issues
24.7m
DOLG
WILI RO
AD
Glangwili
A 485
Spring
13.7m
Dol-Gwili
Llwyn-piodBryn
Llwynpiod
A 485
26.9m
Frondeg42.4m
7
Spring
Ger-y-nant
Track
26.9m
Castell-Pigyn
Glangwili
Greensleeves
47.4m
67.1m
Spring
Tank
Gwylfa
Tynewydd
Maesgwili
72.5m
34.1m
(disused)
Well
Spring
Well
Drain
Track
Well
Brynberllan
Issues
Drain
Rhydyrhaw
A 485
Well
Allt
Cattle Grid
Allt Llwyn-pi?od
Tank
Ty CyfarthfaLlys yr Afon
Maes Y Coed
3
6
Y DDO
L
Track
Rhydyrhosyn
Y Beudy
3
Track
Track
1
8
4
Burrswood
Frongelli Cottage
49
Mast
FB
CH
CH
& ED
Bdy
CB
CR
41a
CAESEIRI
5
15
9
2
Track
Path
Drain
Collects
Spreads
Y Bedol Aur
DW
Path (um)
Path
(um)
6
Title
ISSUE CHK'D APP'DDRAW
APPLICATION No. GISA1
SCALE1:2,500
ISSUE
COMMENTSDATE
N/A
FCoordinate System: British National GridUnits: MetreProjection: Transverse MercatorDatum: OSGB 1936Scale Factor: 0.9996
243132X Centroid Coordinate: 222493Y Centroid Coordinate:
Notes
Abergwili
Llangunnor
Tanerdy
A485
A40(T)
A40(T)
1
2
SITE MAP
WESTERN POWER DISTRIBUTION (BRECHFA FOREST CONNECTION) ORDERWORKS PLANS - OPTION A
(REGULATION 5(2)(j))SECTION B
SHEET 2 OF 2
COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF WESTERN POWER DISTRIBUTIONSHEET 2 OF 2
0 40 80 120 160 200Metres
REPRODUCED FROM ORDNANCE SURVEY MAPS,BY PERMISSION OF THE ORDNANCE SURVEY ON
BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONARY OFFICE. CONTAINS ORDNANCE
SURVEY DATA © CROWN COPYRIGHT AND DATABASE RIGHTS [2015] OS 0100042840
MAY 2015 AJH
PROJECT DRAWING No.
WESTERN POWER DISTRIBUTION(BRECHFA FOREST
CONNECTION) ORDERWORKS PLANS - OPTION A
(REGULATION 5(2)(j))SECTION B
This drawing is scaled at paper size A1, therefore anyprints taken at smaller sizes will affect accuracy of themeasurement units and should not be scaled against.
B
03_13571_75ORIGINATOR DRAWING No.
15/WPD/018 B/WP/PS/2
KEYSECTION BOUNDARYORDER LIMITSCOMMENCEMENT OF WORKNo.1
XY
XYTRANSITION OF WORK No.1TO COMMENCEMENT OFWORK No.2
X
XTRANSITION OF WORK No.2TO COMMENCEMENT OFWORK No.3
!
! TERMINATION OF WORK No.3PROPOSED OVERHEAD LINE
" PROPOSED TERMINAL POLE! PROPOSED SINGLE POLE" PROPOSED TWIN POLE# EXISTING TOWER EE42#
PROPOSED RWE SUBSTATIONGANTRYPROPOSED UNDERGROUNDCABLE HORIZONTALDIRECTIONAL DRILLPROPOSED UNDERGROUNDCABLE OPEN CUT TRENCHLIMITS OF DEVIATIONLIMITS OF DEVIATION &ORDER LIMITSSATELITE CONSTRUCTIONCOMPOUNDUNDERGROUND CABLE WORKAREAHORIZONTAL DIRECTIONALDRILL WORK AREA
B
A SF JCFOR DCO SUBMISSION
EN020016DRAWING No.
B SEPT 2016 SF BOCLIMITS OF DEVIATION SYMBOLOGY AMENDED JC