Working with the EBRD Consultant Opportunities at European
Trieste, September 26, 2012
Consultant Opportunities at European
Bank for Reconstruction and
Development
RESULTS OF THE FS GROUPTurnover €8,246.7 MlnNº of employees 76,417
ITALFERR and the FS Group
MISSION-ITALFERR
Italferr is in charge of implementingthe projects contemplated by theinvestments of the FS Group on the
TURNOVER (2011) €180 Mln
Nº OF EMPLOYEES 1400 (62% engineering– 34% administrative)
Projects managed by Italferr €75 Bln(Past 20 years)
PROJECTS currently underway 559
investments of the FS Group on thebasis of the total allotted funds,guaranteeing the utmost quality andperforming all of the necessarytechnical and administrativeactivities, from the projects’ earlieststages to completion, including finaltesting.
Italferr offers to export its know-howthroughout the world, developingrailway and technological innovationprojects in the infrastructure sector.
P R O J E C T MANAGEMENT
MARKET ANALYSISTraffic studies
Transportation development plans
FEASIBILITY STUDIESInvestment cost/benefit studiesEnvironmental impact studies
Preliminary projects
SECTORS
•HS SYSTEMS
•TRAFFIC MANAGEMENT AND TECHNOLOGICAL SYSTEMS
•CONVENTIONAL NETWORK RAILWAY LINES
Our Railway engineering services
Preliminary projects
DESIGNFinal project and cost estimate
Technical specifications
TECHNICAL SUPPORTCost control and works supervision
Complete management of works
TESTING AND STARTUP OF OPERATIONS
Testing and commissioningTraining
RAILWAY LINES
•METRO AND URBAN TRANSPORTATION
•ROLLING STOCK DEPOTS/MAINTENANCE FACILITIES
•TUNNELS, BRIDGES AND OTHER CIVIL WORKS
•PASSENGER STATIONS
•FREIGHT TERMINALS
Works managed in Italy
Total value of works managed by Italferr in the past 20 years: €75,000 Mln
High Speed lines
Conventional lines
Urban junctions
Technologies
BALKANS
CZECH REP.
ROMANIA
BULGARIA
RUSSIAKAZAKHSTAN
Areas of Interest
USA
ITALFERR’s Areas of Interest
MOROCCO
ALGERIA
LIBYA
EGYPT
TUNISIA
MAURITANIA
UGANDA
KENYA
TANZANIA
VENEZUELA
COLOMBIA
BRAZIL
BOLIVIA
PARAGUAY
URUGUAY
ARGENTINA
CHILE
TURKEY
SYRIA
JORDAN
IRAQ
KUWAIT
SAUDI ARABIA
U.A.E.
OMAN
YEMEN
AUSTRALIA
INDIA
Italferr projects in Europe
Countries:AustriaBosnia-HerzegovinaBulgaria CroatiaCzech RepublicFranceHungary MacedoniaMontenegro
UKRAINEUKRAINE
POLANDPOLAND
RUSSIARUSSIA
CZECH REPUBLICCZECH REPUBLIC
SLOVAK REPUBLICSLOVAK REPUBLICMontenegroPolandRomaniaRussia San MarinoSerbia Slovak RepublicSloveniaSwitzerlandTurkeyUkraine
SWITZERLANDSWITZERLAND
SAN MARINOSAN MARINO
FRANCEFRANCESLOVAK REPUBLICSLOVAK REPUBLIC
ROMANIAROMANIA
BULGARIABULGARIA
MACEDONIAMACEDONIA
SERBIASERBIA
SLOVENIASLOVENIACROAZIACROAZIA
BOSNIABOSNIA
HUNGARYHUNGARY
MONTENEGROMONTENEGRO
AUSTRIAAUSTRIA
TURKEYTURKEY
Our experience with EBRD procurement
� The first EBRD initiative followed by Italferr dates back to 1993, not muchlater than the birth of our company.
� Italferr took part to 13 EBRD procurement processes during this period,almost 10% of the total procurement processes of the firm in the samearea.
� We succeeded in obtaining 3 contracts that were positively implemented� We succeeded in obtaining 3 contracts that were positively implementedafter the awarding with the Bank.
� Our participations were not so numerous but with a good “capture ratio”(3 contracts out of 13 initiatives - and 1 under negotiation - , meaning a23% c.r.), and in the end worth enough to delineate some ideas for theconsultancy opportunities at the EBRD (3 “H”s of How to read aProcurement Notice, How to prepare an Expression of Interest, How torespond to a Request for Proposal).
The Contracts executed for the Bank
� Central Europe Initiative - Central European Transport Information Reporting (CETIR) System (1993-1995)
� CEI Romanian Railways Cooperation: project preparation and implementation assistance (2001-2004)
� Technical assistance for monitoring railway track renewal in Macedonia and Serbia (2011-on going)
� Tirana Public Transport Terminal - Feasibility Study and Concession Tender Preparation Support (under negotiation)
PROJECT 1 - Central Europe Initiative - Central Euro pean Transport Information Reporting (CETIR) System (1993-1995)
� By setting up database management systems, the project identified for eachbeneficiary country (Bosnia-Herzegovina, Croatia, Czech Republic, Hungary,Macedonia, Poland, Slovak Republic and Slovenia) and for each mode of transporta methodology for delineating a multimodal planning scheme for regional andnational transport.
� The services included:� Study and analysis of existing transport plans� Quantification of traffic volumes (passenger and
freight) and vehicle fleet
9
freight) and vehicle fleet� Analysis of demand (passenger and freight) by
origin and destination� Inventory of transport infrastructure characteristics� Definition of the geometric and performance
characteristics of the transport systems� Evaluation of investment, operation and
maintenance costs� Study of transport management modalities� Upgrading of database management systems using
dedicated software� Installation of hardware and software in each
beneficiary country
PROJECT 2 - CEI Romanian Railways Cooperation: proje ct preparation and implementation assistance (2001-2004)
� The main objective of the assignment was to advise and assist the client to prepare forfinancing by the EBRD for the following: refurbishment of main city stations to improvecustomer services, maximize revenue earning opportunities and minimizemaintenance and operating costs; refurbishment/ conversion of approximately 500freight wagons; refurbishment of electric locomotives for passenger services.
� The services included:
� Analysis and critical appraisal of the preparatory work of CFR Freight SA, CFR Passengers SA and CFR SA
10
CFR Freight SA, CFR Passengers SA and CFR SA� Definition of technical scope, performance
specifications, and implementation plans of project components
� Detailed project description and independent commercial justification;
� Detailed project cost estimates;� Environmental appraisal and preparation of the
Environmental Action Plans for each proposed investment
� Assistance to CFR in project implementation checking draft tender documents to ensure their compliance with the Bank's Procurement Policies
PROJECT 3 - Technical assistance for monitoring rail way track renewal in Macedonia and Serbia (2011-on going)
� In FYR Macedonia, the programme of track renewal along Corridor X will be financed as three contracts with a total distance of 53 km. Similarly, in the Republic of Serbia EBRD will finance a programme of track renewal again along Corridor X with a total distance of 100 km. The Bank decided to engage a Lender Monitoring Advisor (‘LMA’) to monitor the implementation of these track renewal projects both in FYR Macedonia and Republic of Serbia.
� The services:
� Monitoring of Tendering and contract award
11
� Monitoring of Tendering and contract award� Quarterly site visits and management of critical issues� Check Quality Control system� Report on Cost Control, Disbursements and Cash Flow� Review progress reports received from the PIU and the
Supervision Consultant� Monitoring of performance of Project Parties� Review project documentation� Report on compliance with Environment, health and
safety rules� Advise on Completion and Acceptance
“Tirana Public Transport Terminal – Feasibility Study and Concession Tender Preparation Support
� The purpose of this assignment is to provide the Municipality of Tirana with a feasibility study, containing an environmental and social analysis, and to assist the Municipality in preparing a public tender for the construction of a transport terminal and in the subsequent phases of allotment through a Design, Build, Finance, Operate and Transfer (DBFOT) contract
� In the restructuring process of bus services routes, the main need is to create an
12
routes, the main need is to create an integrated bus service and develop an intercity bus terminal, connected with other mass transit modes
� Italferr proposal has been selected for award of the contract and currently the contract is under negotiation with the bank.
Our approach to EBRD procurement
� Our approach is completely focussed on the transportationsector, mainly rail.
This aspect (should) imply a specialization in terms of know how,� This aspect (should) imply a specialization in terms of know how,capabilities and economic competitiveness.
Our approach to EBRD procurement
Phases of interest for Consultants’
actions
Finalization of the process (in the
hands of the Bank)
Our approach to EBRD procurement
� Timing of information.� Obtain as soon as possible the
information of a futureinitiative, possibly well beforeits publication
� Lobbying with the Bank.� Establish contacts in order to
understand the real needs tobe satisfied by the project and,in case, propose theConsultant ‘s point of view onthe matter.
Our approach to EBRD procurement
� Prepare the ground.� Identify local firm for possible
cooperation, both as a partnerin the initiative or only assubcontractors
Local firms generally bring� Knowledge of the area and of local rules� Local experts� Lobbying capabilities
� Careful preparation of the firmcredentials for EOI.� Firm references, administrative
data are essential for short listselection (depending on thebudget, this phase might bedecisive!)
� Lobbying capabilities� Economics to the organization
Our approach to EBRD procurement
� Professional preparation of atechnical and economical proposal
� Participation to possible site-visit /information meeting
� Analyze the award criteria proposedby the Client: normally the mostimportant is methodology and key staff(technical)(technical)
� Propose clarifications in case ofunclear definition of project scope orcontractual clause
� Organize a proposal team suitable forthe initiative and sized also accordingto the time allowed for offerpreparation
� Cooperate strictly with local partners inorder to best tailor the proposedapproach to the local expectations.
Our approach to EBRD procurement
� Finalization of the process� Follow up and duly reply to possible
requests of clarifications.� In case, provide more detailed
breakdown of costs not askedpreviously
� Confirm company data presented inthe previous stages, in case providingthe previous stages, in case providingadditional certifications
� Confirm professional skills of expertsinvolved
... hopefully waiting for theawarding of the services
THANK YOU FOR YOUR ATTENTION
Italferr Italferr S.p.AS.p.A..Marco Marco StegherStegher
International ActivitiesInternational ActivitiesSales ManagerSales Manager
+39 06 4975 2036+39 06 4975 [email protected]
www.italferr.it/italferr.html
Via V.G. Galati 7100155 Rome (RM), Italy
Ferrovie dello Stato Italiane Group