The Road Management Office (RMO)
Shared Service
Stephen Flynn C. EngSenior Engineer
Working together effectively
Ag obair go héifeachtach le chéile
Working together effectively
Ag obair go héifeachtach le chéile
What are we at?
• Road Licensing• Software development• Pavement Management
• Pavement Management Working Group• Mechanical Survey• Collation of Data• What to do with it
Working together effectively
Ag obair go héifeachtach le chéile
Pavement Management Working Group
Working together effectively
Ag obair go héifeachtach le chéile
Pavement Management Working Group:• Carlow (chair), Cork City, Dún Laoghaire –Rathdown,
Galway, DTTAS, Limerick City and County, Wexford, LGMA, RMO
• Current Work:• Works App• Footways• Drainage• Pavement Management Strategy / Management Pavement Plans
• Process: – scope – specify – pilot – review – implement
Working together effectively
Ag obair go héifeachtach le chéile
Pavement Management Working Group
Footways
Working together effectively
Ag obair go héifeachtach le chéile
Pavement Management Working Group - Footways (scoping)
Principals! Don’t develop something
which doesn’t give value Don’t develop something
which won’t be used With all the data available,
develop tools to interpret and assist with decision-making
Don’t make work for engineer/technician
• WHY ?
Working together effectively
Ag obair go héifeachtach le chéile
• Hierarchy of footways
References IPB Managing Roads and Footpath Risks , Sections 4 & 5.2 IPAG
• Condition
• Risk
• Frequency
Pavement Management Working Group - Footways (scoping)
Working together effectively
Ag obair go héifeachtach le chéile
• Survey methodology• Full vs. Hazard• Video vs. Photos vs.
Descriptive• Technical supports
Pavement Management Working Group - Footways (scoping)
Working together effectively
Ag obair go héifeachtach le chéile
Pavement Management Working Group
Works App
Working together effectively
Ag obair go héifeachtach le chéile
Pavement Management Working Group – Works AppCurrent Functionality:•Down load planned works to tablet.•Update start and end and mark as complete•Creation of new works (inc. extents)•Rate road at planned works site•Upload new works to MapRoad
Working together effectively
Ag obair go héifeachtach le chéile
Pavement Management Working Group – Works AppDevelopment Options:
• Traffic Management?
• Site Specific Heath and Safety Plan?
• Quality Assurance Records
Element: Planning Criterion: Hazard Identification, Risk Assessment and Determining Controls
Risk Assessment Summary Sheet
Risk Assessment Summary Sheet
Activity/Workplace
Generic Risk Assessment Risk Assessment after application of Control Measures
Hazard Risk Risk Group Li
kelih
ood
Sev
erity
Risk Rating before controls CONTROL MEASURES
Responsible Person Li
kelih
ood
Sev
erity
Risk Rating after controls
Sample risk rating matrix
Numeric Rating Likelihood Severity
1 Very Unlikely Very minor injuries
2 Unlikely First aid minor injury/illness
3 Likely “3 Day” injury/illness
4 Very Likely Major injury/illness
5 Almost Certain Permanently disabling injury /illness or fatality
5 5 10 15 20 25
4 4 8 12 16 20
3 3 6 9 12 15
2 2 4 6 8 10
1 1 2 3 4 5
1 2 3 4 5
S e v e r i t y
Principals!Don’t develop something which doesn’t give valueDon’t develop something which won’t be usedWith all the data available, develop tools to
interpret and assist with decision-makingDon’t make work for engineer/technician
-Users views are essential
Working together effectively
Ag obair go héifeachtach le chéile
Surveys and Data Collation
Working together effectively
Ag obair go héifeachtach le chéile
• RW 21 Nov 2014
• Visual – PSCI
• Mechanical – IRI, rut depth, texture, cracking, scrim
Surveys:• PSCI Network survey
2015• Regional – 100%• Local Primary -100%
• PSCI Work Survey• Before and after 100%
of each project
• Mechanical• Network 2015 - 10% min sample of Local Primary network only• Works 10% of Local Primary, 10% of Local secondary and 5% of
Local Tertiary jobs completed.• Some LA have proceeded • Available through LA Quotes• Specification and tender documents to be issued to each LA
once framework is in place• Each LA can tender for survey works using RFT via LA Quotes at
any stage during the next 3 years.• Ability to contract out PSCI survey to service provider.• RMO to procure national regional road survey next year.
Working together effectively
Ag obair go héifeachtach le chéile
Data Collation
Working together effectively
Ag obair go héifeachtach le chéile
“If you do not ask the right question, you discover nothing”
W. Edwards Deming
“Without data you are just a another person with an opinion”
W. Edwards Deming
“If we have data, let’s look at data. If all we have are opinions, let’s go with mine.”
– Jim Barksdale
Some Quotations
Working together effectively
Ag obair go héifeachtach le chéile
Data on system:
• PSCI data 2015 and previous years.
• Data uploads from 2014
• Roadworks Programme 2015
• €180M of planned works loaded across 3600 projects and 3600km.
• Work ongoing to programme these.
• 17 Local Authorities with DTTAS submissions made
Working together effectively
Ag obair go héifeachtach le chéile
Learning:
• Additional guidance on PSCI vs categories of intervention.
• Clarifications on stages of process: Planned- Approved – Complete.
• What data is recorded and use
Working together effectively
Ag obair go héifeachtach le chéile
“Data by its self is useless. Data is only useful if you apply it”
Todd Park
Working together effectively
Ag obair go héifeachtach le chéile
Pavement Surface Condition IndexRelatable to treatments
Working together effectively
Ag obair go héifeachtach le chéile
Work to date: (surveying)RW 21 2014
Over 56000km surveyed over 60% of network:
• R 47%, • LP 73%, • LS 63%, • LT 50%
Working together effectively
Ag obair go héifeachtach le chéile
Working together effectively
Ag obair go héifeachtach le chéile
Selected Regional Roads
Working together effectively
Ag obair go héifeachtach le chéile
Selected Local Primary Roads
Working together effectively
Ag obair go héifeachtach le chéile
Selected Local Secondary Roads
Working together effectively
Ag obair go héifeachtach le chéile
Back of the envelope calculations
Intervention Est. CostRegional €/m2
Est. CostLocal Primary €/m2
Road Reconstruction (1, 2) 35 25
Structural Overlay (3, 4) 20 15
Surface Restoration (5, 6) 10 6.5
Resealing and Restoration of Skid Resistance (7, 8) 5.5 4.5
Routine Maintenance (9, 10) 0 0
Working together effectively
Ag obair go héifeachtach le chéile
Back of the envelope calculations
X 8
Women of Algiers - Picasso Intervention Budget Cost €Regional
Budget Cost €Local Primary
Road Reconstruction (1, 2) € 9,656,677.70 € 15,380,652.68
Structural Overlay (3, 4) € 110,545,967.52 € 176,967,980.19
Surface Restoration (5, 6) € 167,014,539.94 € 215,787,541.22
Resealing and Restoration of Skid Resistance (7, 8) € 253,014,152.44 € 258,069,257.00
Total € 540,231,337.60 € 666,205,431.08
Working together effectively
Ag obair go héifeachtach le chéile
IPAG: Pavement Management Guidelines
• Asset Register (Roadways, Footways, Structures, Traffic Management, Markings etc)
• Network Referencing• Inventory and Data Management• Routine Maintenance ( categories of
intervention)• Condition Surveying and Rating• Pavement Asset Management Strategies• Reinstatements• New Roads and Taking in Charge
Options?
Working together effectively
Ag obair go héifeachtach le chéile
Pavement Asset Management Strategies:•Prioritisation
• Condition ( PSCI, Mech Survey)• Strategic Importance• Defects• Collision history• Repairs• Claims• Traffic (volume, hg, agricultural,
forestry)• Statutory undertakers works
•Cost by category of road or location•Role of Members
Working together effectively
Ag obair go héifeachtach le chéile
Pavement Asset Management Strategies:
•Are we all starting from the same place?
•Categories of road – standardisation?•Cost of maintenance for different locations•Efficiency
Working together effectively
Ag obair go héifeachtach le chéile
Pavement Asset Management Strategies:
•Performance Measures - KPIs?
•Roads Requiring Maintenance?•Roads surfaced?•Backlog (headline vs. maintenance)•When to intervene?•Consistency between MD’s?
Working together effectively
Ag obair go héifeachtach le chéile
Pavement Asset Management Strategies:
• Strategy at a National Level
• Plan at a local level
• Pilot sites in 2015/2016
• Increased flexibility
• Increased accountability
Working together effectively
Ag obair go héifeachtach le chéile
Thank you – come to our stand!