Work Samples
description
Transcript of Work Samples
-
University of PennsylvaniaSchool of Design M.Arch
YANG ZHAO
-
ACADEMIC
1. VERTICAL THEME PARK
2. NEW YORK GEOGRAPHY INSTITUTE
3. HOME OF WORK
4. SPEEDY ART
5. TRANSFORMER UNIT
6. HIGH PERFORMANCE BUILDING SECTION
PROFESSIONAL
1. AMBULATORY OFFICE
2. SANYA PHOENIX ISLAND
3. TIMBERLAND
-
office
officetree
tree garden
conference
factory entranceview corridor plants
AMBULATORYOFFICE
ProfessionalJiangsu Yuan Sheng Chemical .Ltd08. 2011 - 05. 2012 Beijing China
This three stories office building is designed for a chemical factory in Chinas countryside. The owner wants this building to fit into the modern factory but still integrate with some traditional Chinese architectural figures. The design concept is inspired by the traditional Chinese gardens in Suzhou. The programs are arranged along the corridor that maintains the same principle of the ambulatory in a Chinese garden. The circuitous design maximize the view from different angles and gives certain privacy to different uses. The design of the south facade is more transparent than the north side to maximize the solar gain and block the northwest cold air in winter. The lifted artificial landscape is stacked by the earth from the foundation of the building. The east part of the building will be sitting on the landscape and leaves the cantilever for parking.
Suzhou Garden ambulatory typology
traditional Suzhou Garden
-
plan
3rd floor
1st floor
roof
2nd floor
south elevation north elevation
-
SANYA PHOENIXISLAND
InternshipMAD Architects
Master Plan
Initial Proposal
Variation
05. 2011 - 07.2011 Beijing China
MAD Architects All Copyrights Reserved
During the internship, I worked closely with the project architect on the residential development of the Sanya Phoenix Island. This portion is located between the sport center and the hotels. I participated in the Villa Mountain masterplan design and modelling in Maya and Rhino based on the existing materials. Proposing the landscape design and the villa arrangement for review by the landscape architects. Preparing the meeting materials including calculation, vi-sualization and drawings. Testing various types of villa design via 3D software and preparing renderings for internal communications.
-
A/R Environetics All Copyrights Reserved
Lighting Fixture
Completed Project
Floor Plan
TIMBERLANDWORKPLACE
ProfessionalCubellis A/R Environetics09. 2007 - 01.2009 New York USA
-
operation 36 36 360 ? how far is your site
VERTICALTHEME PARK
Universal Amusement ComplexJournal Square, Jersey City, NJUniversity of Pennsylvania School of Design Yang Zhao
hotel
++ + + +
London Eye443
Hogwarts Castle150
Site Elevation25 FAR
Kingda Ka, NJ, USA456
movie studio theme park roller coaster ferris wheel hotel
-
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-12.00 -11.00 -10.00 -9.00 -8.00 -7.00 -6.00 -5.00 -4.00 -3.00 -2.00 -1.00
36
36
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
-12.00 -11.00 -10.00 -9.00 -8.00 -7.00 -6.00 -5.00 -4.00 -3.00 -2.00 -1.00
sectionplan
-
physical model
-
Cafe
Exhibition
Exhibition
Exhibition
Exhibition
Exhibition
Exhibition Hall
CafeMultimedia room
Lecture ro
Gift shop
Exhibition Cafe
Info desk
/ Exhibit
0 / 12
0 / 12
0 / 12
0 / 12 1 / 14
UP
UP
DN
0 / 12
0 / 12
-3 / 9
DN
-3
UP
UP
UP
UP
DN
0
0
DN
-2 / 8
3
operation
learn center laboratory
cave site library
research exhibition roof plan/louver/ETFEsecondary structure
primary structure
Randalls Island
East
Rive
r
Multimedia room
Cafe
Cafe
Exhibition
Exhibition
Exhibition
Exhibition
Laboratory
Laboratory
Lecture room
Exhibition
gift shop
Exhibition
Exhibition
Exhibition
Exhibition Hall
CafeMultimedia room
Lecture room
LaboratoryLaboratory
Laboratory
Laboratory
Gift shop
Exhibition Cafe
Info desk
/ Exhibition
-5
DN
0 / 12
0 / 12
0 / 12
0 / 12 1 / 14
UP
UP
DN
DN
DN
DN
DN
DN
DN
DN
0 / 12
0 / 12
UP
UP
-5
UP
DN
DN
UP
DN
UP
UP
-3 / 9
DN
-3
DN
UP
UP
UP
DN
-5
UP
UP
UP
UP
UP
DN
DN
0
0
DN
DN
0-5
UPUP
3
DN
-2
-3 / 7
4
UP
0 -3
-4
-2
-1
5
0
-3
-5
-2 / 8
UP
-20
-3
-5
-5
-2
-5
0
-2
3
-4 / 6
UP
5
-2
20
3
0
-1-2
UP
-2
-35
5
1UP
2
5
DN
1
5UP
UP
UP
DN
DN
UP
UP
DN
DN
UP
NYGI New York Geography InstituteRandalls Island, New York City, NYUniversity of Pennsylvania School of Design Yang Zhao
site plan plan entrance
section
-
D-1D-3
D-2
D-1
D-2
D-3
Mesh Concrete Coating
Mesh Concrete Coating
ETFE Film Supported by1 Aluminum Molding
Mesh Concrete Coating
Concrete Slab
1/8 Transparent panel
LED Light Fixture
LED Light Fixture
Concrete Wall
8 Steel Pipe
8 Steel Pipe
Louver
Duct
Plumbing
-
physical model
-
NewarkNew Jersey
45 mins
1,629,054
281,402
23 sq mi
26 sq mi
Brooklyn
28 mins
2,567,09871 sq mi
Queens
1 Hour 22 mins
2,306,712109 sq mi
53 mins
1,397,28742 sq mi
Manhattan
Bronx
New Jersey
Weekend Weekdays
New YorkNewark
LivingParking
Ingress Egress
South Route
Ingress Egress
West Route
North Route
Ingress Egress
TO NEW YORK
BROAD
STREET
MARKET STREET
TO GROVE STREET
TO NEW JERSEY
TO BROAD STREET RAIL STATION
McCAETER H
WY
TO HOBOKEN
S
S prudential center shuttle
public parking
official parking
MARKET STREET
MARKET STREETEE
SS
TO NEW YORK
BROAD
STREET
MARKET STREET
TO GROVE STREET
TO NEW JERSEY
TO BROAD STREET RAIL STATION
McCAETER H
WY
TO HOBOKEN
S
S prudential center shuttle
public parking
official parking
MARKET STREET
MARKET STREET
M
ET
TO NEW YORK
BROAD
STREET
MARKET STREET
TO GROVE STREET
TO NEW JERSEY
TO BROAD STREET RAIL STATION
McCAETER H
WY
TO HOBOKEN
S
S prudential center shuttle
public parking
official parking
TO NEW YORK
BROAD
STREET
MARKET STREET
TO GROVE STREET
TO NEW JERSEY
TO BROAD STREET RAIL STATION
McCAETER H
WY
TO HOBOKEN
S
S prudential center shuttle
public parking
official parking
TO NEW YORK
BROAD
STREET
MARKET STREET
TO GROVE STREET
TO NEW JERSEY
TO BROAD STREET RAIL STATION
McCAETER H
WY
TO HOBOKEN
S
S prudential center shuttle
public parking
official parking
TO NEW YORK
BROAD
STREET
MARKET STREET
TO GROVE STREET
TO NEW JERSEY
TO BROAD STREET RAIL STATION
McCAETER H
WY
TO HOBOKEN
S
S prudential center shuttle
public parking
official parking
other
6-7 AM
9-10 AM
12-1 PM
3-4 PM
all day
Shadow
subway
820 am
1000 pm
930 pm
850 am
1230 pm
6:00 pm
7:30 pm
WORK
HOME
9:00 pm9:20 pm
HOME
workdays simulation
HOWO Of
Temporary Housing for CommutersNewark, NJUniversity of Pennsylvania School of Design Yang Zhaom
e k
mapping
-
Concrete Panel
Concrete Slab
LED Light
Steel Frame
Pre-CastedConcrete Truss
ETFE Pillow Pumped With Air
PipeInsulation Layer
Waterproof Membrane
1
1. Merchanical room & Water Tank2. Observation deck3. Emergency Exit4. Terrasse
Championship Plaza
Market Street
Edison Pl
Mul
berr
y S
treet
2
4
3
1
1. Merchanical room & Water Tank2. Botanical garden3. Emergency exit4. Terrasse
Championship Plaza
Market Street
Edison Pl
Mul
berr
y S
treet
2
4
3
7
4
1. Cafeteria2. Grocery & Loundry pickup3. Lounge4. Public corridor5. Storage room6. Spa7. Observation deck
Championship Plaza
Market Street
Edison Pl
Mul
berr
y S
treet
2
3
1
6
5
1. Lobby2. Auto-Parking3. Carwash
Championship Plaza
Market Street
Edison Pl
Mul
berr
y S
treet
1
2
3
primary structure
plan
Apartment
Atrium
Terrace
Terrace
Lobby
Car wash
Serves
unitssection
-
physical model
-
SUN
Extended Stay Artists Residence Digital Output StationShared DarkroomsFabrication ShopDigital Fab Lab
Kitchenettes
RestaurantRestaurant stotage
M / W Locker RoomsStudio Workshops
Art Library
Film Screening Interior Performance Theater
Interior Exhibition Galleries Exterior Exhibition GalleryPercent Sheltered
Local Farmers Market
Lounge
Bookstore / Gift shopArts Center Convenience Store
Caf / Bar
Loading ZoneBike storage
PROGRAM SPEED
Entrance / Lobby
Administrative Offices
Schu
ylkill
Expy
Schu
ylki
ll Ri
ver
Uni
ve
rsity of Pennsylvania
Univ
ersity City High School
Philad
el
phia Museum of Art
City Hall
Rittenho
use S
quare
Kim
mel Center
30th St Station
Vine St Expy
High
LowTrac Density
John F Kennedy Blvd
Market St
Walnut St
Rail
Tourist
Resident
College Student
TeenagePassenger
Linear/Slow
MovementCharacter
Repeated/Constant
Linear/Repeated/Fast
Divergent/SlowDivergent/Fast
SPEEDYART
Philadelphia Art CenterPhiladelphia , PAUniversity of Pennsylvania School of Design Yang Zhao
section
-
section
basement ground floor second floor
-
TRANSFORMERUNIT
Deployable Living TrailerConstruction site & streetUniversity of Pennsylvania School of Design Yang Zhao
This mobile station is designed for people to monitor the progress of the construction on site. After the construction completed, this station will be used as a temporary shelter for homeless on street.
lifting armsfoldable desk
batteries
pocket doorskylightwindow
recycled wood floorrecycled gypsum
recycled aluminum sheet
recycled steel baserecycled glass
pocket lightrecycled plastic window frame
living room
kitchen
bathroom
working desk
plumbing
entrance
plan section section
-
12
67
8
3
9
11
12
104
5
[Assembly Diagram. A typical unit which contains recycled timbers, glass, plumbing, metal & gypsum boards and even bolts.]
-
Yang Zhao
Address: 4421 Macnish Street Apt 6D, Elmhurst NY 11373Phone: +1-917-892-4683E-mail: [email protected]