Work report of Sarah Ourimi & Sonia Torkhani during March … · Sarah Ourimi & Sonia Torkhani...

29
Work report of Sarah Ourimi & Sonia Torkhani during March 2015 Place: Energy Team S.p.a Trezzano sul Naviglio (Milan) Italy PERIOD: from 2/03/2015 to 30/03/2015 1

Transcript of Work report of Sarah Ourimi & Sonia Torkhani during March … · Sarah Ourimi & Sonia Torkhani...

Work report of

Sarah Ourimi & Sonia Torkhani

during March 2015

Place: Energy Team S.p.a Trezzano sul Naviglio (Milan) Italy

PERIOD: from 2/03/2015 to 30/03/2015

1

Monday 2/03/2015

First day of work, first contact with the Energy Team staff. We did : 1- Energy Team familirazation. 2- Install in our desk. 3- A meeting with engineers and techniciens working on the project in order to share informations collected during our month of work in the embassy.

2

Wednesday 4/03/2015

1-We read the l’Efficiency Terminal manual and try to learn how to manipulate it. 2-Installation of the apparatus in electrical board.

4

Thursday 5/03/2015

1- Meeting for scheduling the work 2- Get to know NG9 configurator.

5

Friday 6/03/2015

1- Working on ES3 software. 2- Doing the summary of our thesis.

6

Monday 9/03/2015 1- Decide which loads to control and first draw of the connection between the equipements and electrical board. 2- Decide which equipement to be used to monitor electrical consumption in the embassy : NG9.

7

NG9

Why NG9? • The world smallest analyzer featuring 9 channels within 9cm. •Price and occupied volume are reduced during installation. •Reduced installation errors to allow a simple and correct start up.

8

Tuesday 10/03/2015

1- Do the electrical skim for each NG9 and the general connection between them. 2- Labelling of the TA. 3- Test: comparison between NG9 and Efficiency terminal mesurements

9

Wednesday 11/03/2015

Construction of the 6 NG9s connection box.

10

Thursday 12/03/2015

Finish the connection between the different NG9. The box is ready to be send to be installed in the embassy.

11

Friday 13/03/2015

1-Working on ESweb software of acquisition data from NG9. 2-Change the configuration according of the operation mode in Tunisisa. 3- Manipulation of the software options.. 4- Configuration of the Pc box

12

Monday 16/03/2015

Schedule activities:

•We did the statement of accounts of the last two weeks. • We met with the team work to schedule next steps and tasks to accomplish.

13

Tuesday 17/03/2015

14

Day on Energy Sentinel Web, we learned: How to do a report. Understand the graphs. Configure algebraic modules. To handle software options (historical Data and real time data).

Wednesday18/03/2015

15

We read reports about historical cases. We did discussion to reply to our questions and improve our critical and analytic mind.

Wednesday18/03/2015

16

We read reports about historical cases. We did discussion to reply to our questions and improve our critical and analytic mind.

Thursday 19/03/2015

17

We established a study case about compressed air in French which was a good example of energy audit in the industry of compressed air. We did a discussion about the solutions with team member. Manipulation of data, collected through Efficiency Terminal, with ES3.

Friday 20/03/2015

18

Configuration of NG9 according to modifications decided with Energy Team technicians . We received the electrical schemes of equipment’s installation, in general an in detail of connections of each NG9.

Monday 23/03/2015

19

General report on consumption’s graphs of the registration period of data from Energy Sentinel Web.

We have been working on the Energy Team consumption more precisely about the storage room lightning:

Tuesday 24/03/2015

20

We continued working on storage room lightning:

Detailed report on wastes and gains of energy Creation of three scenario based on different utility factor in order to better modelize our study case.

Wednesday 25/03/2015

21

Work done, revision with the team work and discussion on the hypothesis proposed for this case.

Thursday 26/03/2015

22

Finishing the configuration of the PC box.

Working on Efficiency Terminal, and importation of data to ES3 software with master working on this device.

Friday 27/03/2015

23

The NG9s are ready to be send and installed in the embassy. Training with Efficiency Terminal. Finishing the audit energy report on lightning of the storage room.

24

Road Map We further increased our know how,

now we are ready for next step

25

During this two month we have been working on:

Increasing knowledge about energy team services and products. Learning analysing data collected from energy team’s softwares. Studying old report of real cases in order to understand how to work on an energy audit report. Doing an energy audit report about the lightning consumption of storage room. Finishing configuration of PC Box in order to send equipment to the embassy. Closing the activities to be done in order to finish the training and learn how to manipulate the equipment to be installed (NG9, PC BOX, Efficiency Terminal.

Conclusion

Weekends & Free time

26

Weekends & Free time

27

28

29