Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim...

5
Work Programme Management Ad hoc Group Report oup Name: one M2M TP7 urce: Convenor WPM Joachim Koss, Gemalto M2M, [email protected] eting Date: 2013-10-14 enda Item: 5 - Reports from Ad-Hoc Groups

description

Issues for DISCUSSION in TP © 2013 oneM2M Partners oneM2M-TP Estimation on needed face to face / conference call timeslots to complete the deliverable

Transcript of Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim...

Page 1: Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,

Work Programme ManagementAd hoc Group Report

Group Name: one M2M TP7Source: Convenor WPM Joachim Koss, Gemalto M2M, [email protected] Date: 2013-10-14Agenda Item: 5 - Reports from Ad-Hoc Groups

Page 2: Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,

Issues for DECISION in TP

• No issues for decision

© 2013 oneM2M PartnersoneM2M-TP-2013-0343

2

Page 3: Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,

Issues for DISCUSSION in TP

© 2013 oneM2M PartnersoneM2M-TP-2013-0343

3

• Estimation on needed face to face / conference call timeslots to complete the deliverable

Page 4: Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,

Items for INFORMATION

• Meetings held since last TP22 Aug, 28 Aug, 06 Sep, 11 Sep, 25 Sep, 02 Oct, 10 Oct

• Meetings planned23 Oct, 31 OctFrame conditions:• Start of conference calls not earlier than 5:00 in the morning local time of any region• End of conference calls not later than 0:00 midnight local time of any region• Typical duration: 1 hour• Typical in timely collocation with a conference call of another group (before that one)

only applicable during summertime

© 2013 oneM2M PartnersoneM2M-TP-2013-0343

4

Page 5: Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,

Items for INFORMATION

• Achievements– Proposal of a 3 phase methodology developed for

describing an initial Release based on CSFs and Protocols,applied during an extraordinary TP/WG leadership meeting followed by several TP ad hoc conference calls and resulted in proposal to TP7 (oneM2M-TP-2013-0328R01)

– Work Programme advanced as a permanent document– Process of Work Programme Reports updated: granularity

of “level of completeness” in Work Programme Reports– Discussions proceeded in elaborating the role of WPM ad-

hoc group in Release management© 2013 oneM2M Partners

oneM2M-TP-2013-03435