description

Kick-off meeting MUSEC Outcome of WP n.2  Methodologies and tools for baseline assessment, potential definition and monitoring Definition of SEC objectives and targets, based on the baseline assessment and the potential definition, in close collaboration with local stakeholders

Transcript of Work package n.2 Energy baseline assessment and target setting Kick-off meeting MUSEC Modena,...

Page 1: Work package n.2 Energy baseline assessment and target setting Kick-off meeting MUSEC Modena, 12.01.2007.

Work package n.2Energy baseline assessment and target setting

Kick-off meeting MUSECModena, 12.01.2007

Page 2: Work package n.2 Energy baseline assessment and target setting Kick-off meeting MUSEC Modena, 12.01.2007.

www.ambienteitalia.itKick-off meeting MUSEC 12.01.2007

Objectives of WP n.2

Carry out an energy baseline assesment for each community

Define the potential for energy efficiency and renewable energy sources

Set individual targets

Monitor the results

Page 3: Work package n.2 Energy baseline assessment and target setting Kick-off meeting MUSEC Modena, 12.01.2007.

www.ambienteitalia.itKick-off meeting MUSEC 12.01.2007

Outcome of WP n.2

Methodologies and tools for baseline assessment, potential definition and monitoring

Definition of SEC objectives and targets, based on the baseline assessment and the potential definition, in close collaboration with local stakeholders

Page 4: Work package n.2 Energy baseline assessment and target setting Kick-off meeting MUSEC Modena, 12.01.2007.

www.ambienteitalia.itKick-off meeting MUSEC 12.01.2007

Activities of WP n.2

Define the assessment methodology Assess the energy baseline for each community Identify local stakeholders and partnerships Identify potentials for improving current energy

efficiency standards and renewable energy generation capacity

Set targets Define the monitoring methodology and indicators

Page 5: Work package n.2 Energy baseline assessment and target setting Kick-off meeting MUSEC Modena, 12.01.2007.

www.ambienteitalia.itKick-off meeting MUSEC 12.01.2007

Timing of WP n.2Jan Feb Mar Apr May Jun Jul

Assessment mehodology

Energy baseline assessment

Potential & target definition

Monitoring & indicator definition

Grow model

Final report

Page 6: Work package n.2 Energy baseline assessment and target setting Kick-off meeting MUSEC Modena, 12.01.2007.

www.ambienteitalia.itKick-off meeting MUSEC 12.01.2007

Discussion items for WP n.2Definition of common methodologies for: assessing the energy baseline defining the targets monitoring

A proposal will be prepared by Ambiente Italia

Adaptations will be allowed case by case at national level

General rules should be guaranteed

Page 7: Work package n.2 Energy baseline assessment and target setting Kick-off meeting MUSEC Modena, 12.01.2007.

www.ambienteitalia.itKick-off meeting MUSEC 12.01.2007

Discussion items for WP n.2Example: definition of the energy baseline assessment methodology

Total energy consumption is the result of different activity sectors (e.g. residential, commercial, industrial, transportation, etc.). It is very useful, especially in order to give a particular direction to local actions, to analyse the contribution of the energy consumption to this sectorial disaggregation.

A further disaggregation with reference to the energy vectors (electricity, gas, district heating, coal, oil, etc) is a useful information to drive local actions.

The analysis of the variations over time (with reference to a baseyear) is important to understand the trends of energy consumption