WOOD STREET DRAFTTENDER LONG GULLY St... · 6.Pedestrian crossings are to be constructed as per IDM...
Transcript of WOOD STREET DRAFTTENDER LONG GULLY St... · 6.Pedestrian crossings are to be constructed as per IDM...
300Ø
R
C
P
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
-
1
COVER SHEET
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
WOOD STREET
LONG GULLY
GB4449
INTERSECTION UPGRADES
NELSON STREET ROUNDABOUT
DECEMBER 2020
N
E
L
S
O
N
S
T
R
E
E
T
PROJECT EXTENTS
N
E
LS
O
N
S
T
R
E
E
T
83 WOOD STREET
W
O
O
D
S
T
R
E
E
T
N
E
L
S
O
N
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
E
A
G
L
E
H
A
W
K
R
O
A
D
92-94 WOOD STREET
5 NELSON STREET
91 WOOD STREET
7 NELSON STREET
83 WOOD STREET
2 TECHNOLOGY DRIVE
1 TECHNOLOGY DRIVE
W
O
O
D
S
T
R
E
E
T
DOCUMENT CONTROL
SH
EE
T
No.
SH
EE
T
DE
SC
.
11/07/19
14/04/20
01/12/20
DRAFT TENDER CONSTRUCTION
REVISION REVISION REVISION
1 COVER SHEET A A A
2 CONSTRUCTION NOTES A A A
3 SURVEY CONTROL / EXISTING LAYOUT A A A
4 DEMOLITION PLAN A A A
5 GENERAL LAYOUT & FINISHES A A A
6GEOMETRIC LAYOUT, ALIGNMENTS & KERB TYPES
A A A
7 SURFACE SLOPE PLAN A A A
8 KERB LONG SECTIONS A A A
9 KERB LONG SECTIONS A A A
10SIGNS, LIGHTING, RRPMS & LINEMARKING
A A A
11 SETOUT LOCATIONS N/A N/A A
12 SETOUT TABLES N/A N/A A
13 SURFACE DIFFERENCE PLOT A A A
14-21 DOWDING STREET INTERSECTION PLANS A A A
22-29 WEATHERALL STREET INTERSECTION PLANS A A A
30 SPEED HUMP LOCATIONS A A A
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
-
2
CONSTRUCTION NOTES
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
IMPORTANT!
The location of underground services have been derived from
available information, however accuracy cannot be guaranteed.
All existing service information should therefore be treated as
indicative only, and service locations must be arranged prior to
commencement of any excavation. The contractor will be held
responsible for any damage caused to underground services.
SEAL: Type V Asphalt (10mm)
BASE: Class 1 FCR (20mm)
Place and compact in 2 even layers
Compact to a min. of 98% MMDD
(min CBR 80)
SUB BASE: Cement Treated CL1 FCR (20mm)
3% Cement by mass
Compact to a min. of 96% MMDD
Existing material:
- See notes this page for all compaction and testing
requirements
Kerb Returns and straights - IDM SD100 - SM2
600
300110 190
275
40
Setout is to back of kerb
500
SM2 kerb is to have a
0.5m flat area behind
190
600
300110 190
275
10
Setout is to back of kerb
140
Central Island - IDM SD100 - SM3
Stenciled
concrete apron
Splitter Islands - IDM SD100 - SM1
300
110 190
275
125
Setout is to back of kerb
150
Stenciled
concrete apron
VEGETATION PROTECTION NOTES
1. If fencing is required as a condition of the Planning Permit or as a result of the
pre-construction meeting, a three strand star picket and wire fence shall be constructed.
2. All trees and shrubs are to be retained unless otherwise shown or directed by the
Superintendent's Representative.
3. No tree or native vegetation is to be disturbed or removed without prior approval. Any
approved trees or vegetation removed as part of the works are not to be burnt onsite.
4. If tree roots are discovered during excavation works, works in the immediate area shall
cease until the Superintendent's Representative has inspected, and approved works to
proceed.
FILL NOTES
1. All earthworks and compaction are to be in accordance with VicRoad's Specification
Section 204.
2. All fill materials are to be approved by the Superintendent's Representative prior to being
imported onto the site, and unless noted otherwise, shall be a clean clay based material
free of vegetation matter or contaminants.
3. All filling is to comply with AS3798-1996 Appendix B, level 1 (or 2) as specified
4. The Contractor is responsible for ensuring that all imported fill material, including topsoil,
satisfies the description for clean fill material in EPA bulletin publication No. 448 (Sep
95) and subsequent revisions. The Contractor shall provide verification including test
certificates to the Superintendent's Representative.
ROAD CONSTRUCTION NOTES
1. All Works to be carried out in accordance with CoGB Standard Drawings, Specifications,
approved plans and to the satisfaction of the Superintendent's Representative.
2. These notes also refer to the latest version of the Infrastructure Design Manual (IDM) and
latest version of the IDM Standard Drawings.
3. The Project Manager is to be notified seven days prior to the commencement of Works
with a Pre-commencement meeting to be held between CoGB, the Consultant and the
Contractor. A site management plan is to be submitted prior to the commencement of
Works and prior to the onsite Pre-commencement meeting.
4. Prior to commencement of the Works, the Contractor shall provide the following:
- Source of quarry material
- N.A.T.A. approved test results for the F.C.R that is to be used
- If the source of the quarry material is changed during the course of the Works, then new
test results shall be provided.
5. Prior to commencement of Works on site, the Contractor must ensure that all matters
relating to the Occupational Health and Safety Act 1985, have been and will be complied
with.
6. On the commencement of construction, the Contractor must comply with the
recommendation of the Environment Protection Authority publication "Construction
Techniques for Sediment Pollution Control". Appropriate siltation control is to be
maintained throughout the construction and maintenance period of the Works.
7. The disposal site for spoil storage, and truck removal route, is to be submitted in writing
to, and approved by the Superintendent's Representative prior to the commencement of
Works.
8. Where Works are in the vicinity of existing services, these services are to be located and
exposed prior to commencement of the work. Relevant authorities are to be notified 7
days prior to the Works.
9. All dimensions are in metres unless noted otherwise.
10. All levels are to Australian Height Datum (AHD) unless noted otherwise.
11. All co-ordinates are to Map Grid of Australia (MGA) unless noted otherwise.
12. The Contractor must arrange the inspection of the Works with the Superintendent's
Representative as per the hold points in the Specifications, or as directed by the
Superintendent's Representative.
13. All redundant assets are to be removed and disposed off site unless noted otherwise.
14. All service conduit trenches under road pavements, under footpaths and under swales are
to be backfilled as per IDM SD310 unless noted otherwise. Compaction standards noted
in SD310 shall be achieved.
15. Blasting is not generally accepted.
16. All existing assets affected by the Works (i.e. signs, vehicle crossings, footpaths, kerb and
line marking) shall be reinstated by the Contractor before the completion of Works, to the
satisfaction of the Superintendent's Representative.
17. At the completion of all Works, all rubbish, debris and surplus spoil shall be removed and
the site shall be cleared to the satisfaction of the Superintendent's Representative.
18. The Contractor is to obtain a Building Permit for any structures, fences and for any
retaining walls over 1.0m in height.
19. Any infrastructure damage incurred during the Defects Liability Period noted on the
contract is the responsibility of the Contractor and is to be reinstated to the satisfaction of
the Superintendent's Representative.
20. All disturbed areas (eg. nature strips, batters, allotments and reserves) are to be
reinstated to a clean, tidy condition, top dressed with 75mm min. depth approved top soil,
and seeded with a CoGB approved blend or unless otherwise noted. Soil & seeded
treated areas must be satisfactorily established prior to the end of the Maintenance Period
otherwise further treatment is required by the Contractor.
21. Any exposed aggregate concrete works are to be achieved by sandblasting only. Washing
aggregate off with water is not permitted.
22. The Contractor shall notify the public of any impending road closures by providing
sufficient signage 2 weeks prior to construction commencing.
PAVEMENT NOTES
1. Construction of road pavements is to be in accordance with the requirements of VicRoad's
Standard Specifications for Roadworks (Section 304). Testing must be carried out by a N.A.T.A.
approved laboratory, or by calibrated nuclear densometer test to the relevant Australian
Standard.
2. Compaction tests are to be undertaken in the following locations:
- At
2
3
depth of the pavement
- At alternating sides of the road
- 1.0m in from the seal edge or lip of kerb
- At even spacings.
3. The number of compaction tests shall comply with the table below:
Location Number of Compaction tests
Court bowls 3
Intersections 2
Straights 1 per 500m2 (1/50m for 10.2m wide pvmt.)
4. Copies of the geotechnical results are to be submitted to the Superintendent's Representative.
5. Sub-base and base materials are to be at 85% optimum moisture content (OMC) during
compaction, and maintained at 85% OMC until proof rolling.
6. Typical Compaction levels required (unless noted otherwise):
Subgrade: To be compacted to 100% standard dry density ratio.
Subbase: Flexible pavements shall be compacted in accordance with Scale C in VicRoads table
304.082.
Compaction shall be to 98% of the maximum dry density ratio determined by the modified
compaction test.
Base: Flexible pavements shall be compacted in accordance with Scale C in VicRoads table
304.082.
Compaction shall be to 100% of the maximum dry density ratio determined by the modified
compaction test.
7. Proof rolling of the Subgrade, Sub base and Base must be undertaken as per Section 12.7.15 of
the IDM. Proof rolling will be at the expense of the contractor in accordance with AS3798 and the
requirements of section 173 and 204.12 of the VicRoad's Specification. The Superintendent's
Representative must be present during the proof rolling. The Subgrade must not deflect more
than 2mm vertically within 300mm of the test roller in isolated locations.
8. Identification and treatment of soft areas during proof rolling shall be dealt with as per Sections
12.7.13 and 12.7.14 of the IDM and as approved by the Superintendent's Representative.
SIGNAGE, GUIDE POSTS, LINEMARKING & RRPMS
1. All existing signage, linemarking guideposts and RRMPs within Works site are to be removed
as per the 'demolition plan'
2. All proposed Signage, linemarking, guideposts and RRPMs are to be installed as per the
'Linemarking and signage plan'
3. All signs to be installed shall be Class 1 high intensity type and comply with the requirements of
AS1743-2001.
4. All guideposts are to have delineators satisfying the requirements of AS1906.2 section 3.
FOOTPATH CONSTRUCTION NOTES
1. Any property storm water pipes located during works are to be plumbed to the nearest pit. Where this is not practical, seek approval
from superintendent to plumb to kerb or into nearest storm water pipe.
2. Footpath to be constructed to SD205 unless noted otherwise.
3. An SD210 expansion joint is to be constructed at any joins with existing footpath, existing driveways or bridges.
4. SD210 Expansion joints along any new sections of footpath are to be at a maximum separation of 14m centers as per SD205.
5. Tool joints are to be at 1.2m centers and constructed to SD210 unless noted otherwise.
6. Pedestrian crossings are to be constructed as per IDM SD192 and are to have the boxing inspected by the Superintendents
representative prior to pouring concrete.
7. All pedestrian crossings are to have ceramic tile TGSIs installed as per AS1428.4
GENERAL CONSTRUCTION NOTES
1. All kerb, footpath and pram crossing constructions shall have bedding/boxing inspected by the Superintendent's Representative prior to
pouring of concrete.
2. All driveway laybacks in kerb are to be as per IDM SD 120 unless noted otherwise
3. If property stormwater outlets (not already identified on plan) are located during construction, it is the Contractors responsibility to connect
them into council underground drainage or back of kerb (As per IDM SD140) to the approval of the Superintendent's Representative.
4. Renewal of gas and water property service conduits to be 100mmØPVC (sewer grade).
5. All sewer man-hole covers within the footpath alignment (wholly or partly) are to be renewed & adjusted to design finished levels unless
noted otherwise or directed by the Superintendent's Representative.
6. All redundant footpath, kerb and road seal to be saw cut and removed from site as per the 'demolition plan'.
7. All service pits are to be renewed and matched into design surface unless noted otherwise or directed by the Superintendent's
Representative.
DRAINAGE CONSTRUCTION NOTES
1. The Superintendent's Representative and Design Engineer must be notified if any any modifications to drainage design are
required due to unforseen circumstances identified during works onsite.
2. Any property storm water pipes located during Works are to be plumbed to the nearest pit. Where this is not practical, seek
approval from the Superintendent's Representative to connect stormwater into kerb or into the nearest storm water pipe.
3. All drainage pits are to be constructed as per the noted Standard Drawing.
4. Invert fall through pits is to be a min. of 30mm unless noted otherwise.
5. Concrete pit walls are to be sponge finished and floors are to be shaped for best hydraulic efficiency unless noted otherwise.
6. Pit lids are to be installed flush with the surrounding surface unless noted otherwise.
7. Where concrete box culverts (CBC) or Crown Units are specified, they are to be compliant to AS1597 and designed to the
latest revision of the shear design standard.
8. Pipe extensions are to be constructed by removing the remaining stub of the existing pipe to be extended, and then
connecting the new pipe at the socket.
9. All pipe backfill is to be constructed as per the noted Standard Drawing.
10. The location of any saw cuts in asphalt are to be kept the minimum required trench width until after the pipe is laid and
backfilled up to 300mm from surface. At this point, a further 150mm wide, 300mm deep section of asphalt/pavement is to be
sawcut and excavated so as to provide a longitudinal pavement join over the drainage trench. This also should ensure a
straight edge for re-asphalting. The top 300m depth of backfill should then be constructed accordingly.
11. At the completion of the Works, pipes are to be visually inspected via inspection pits to check for construction debris, including
crushed rock, soil and concrete over spill. Should a volume of debris be present enough to impede flows, pipe cleaning shall
be undertaken at the contractors expense.
12. Gas and water property services are generally not located during the design phase and therefore have not been shown on
plans. It is therefore the Contractors responsibility to consider these services when excavating and adjust or realign
accordingingly whilst causing minimal disruption to property owners.
13. Gas and Water property services encountered during construction are to be altered and reconnected to the appropriate
standard and to the satisfaction of the Superintendents Representative.
MINIMUM PAVEMENT REQUIREMENTS
KERB DETAILS
FOOTPATH DETAILS
STENCILED CONCRETE
LANDSCAPING DETAILS
1500
2.5
%
crossfa
ll
125mm thick 25MPa concrete
slab with central SL72
IDM SD205
Bedding, 50mm thick layer
compacted CL3 FCR
5050
Varying widths
Bedding, 100mm thick layer
compacted CL3 FCR
- 150mm thick 32MPa concrete slab
- 1 layer SL82 placed 50mm from bottom
- Flagstone stencil pattern, Charcoal
color, clear seal
50
ROLL OUT GRASS
75
Loamy sand
Pull strin
g b
etw
een ke
rbs fo
r gra
de
Transverse Pavement Joins
300 300
existing pavement
Where design pavement meets
existing pavement, the design
layers are to be overlapped into the
existing pavement by 300mm as
shown
40
260
500
200
Dowel into kerb
with 200mm long
N10s at 500mm
cts. Pre-drill and
place dowels
100mm below top
of kerb
Note:Transition SM2 kerb to existing barrier kerb over 2m
50
Kykuyu roll out grass sod
STN 1
RL 242.236
STN 3
RL 242.136
STN 4
RL 242.221
STN 6
RL 242.231
STN 7
RL 239.968
PSM 214
RL 242.864
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
1:400
3
SURVEY CONTROL + EXISTING LAYOUT
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
W
O
O
D
S
T
R
E
E
T
N
E
L
S
O
N
S
T
R
E
E
T
N
E
LS
O
N
S
T
R
E
E
T
92-94 WOOD STREET
83 WOOD STREET
2 NELSON STREET
5 NELSON STREET
3 NELSON STREET
7 NELSON STREET
AC Water Pipe Located.
STN 1
RL 242.236
STN 3
RL 242.136
STN 4
RL 242.221
STN 6
RL 242.231
STN 7
RL 239.968
PSM 214
RL 242.864
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
1:400
4
DEMOLITION & SERVICE CHANGES PLAN
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
LEGEND
Linemarking Removal
Concrete Kerb Removal Road Pavement RemovalSawcut Asphalt
W
O
O
D
S
T
R
E
E
T
N
E
L
S
O
N
S
T
R
E
E
T
N
E
LS
O
N
S
T
R
E
E
T
92-94 WOOD STREET
83 WOOD STREET
2 NELSON STREET
5 NELSON STREET
3 NELSON STREET
7 NELSON STREET
Remove all linemarking
between Wood Street
and Eaglehawk Road.
General notes:
1. Remove all redundant kerbs, footpaths and
traffic signs.
TRAFFIC CONTROL & SIGN ALTERATIONS
NO. TYPE ACTION
1 Hazard Marker Remove from site
2
Give Way
Remove from site
3
No Stopping
Remove and store onsite for reuse
4
No Stopping
Leave as is
1
2
3
4
Avoid Power pole stay
SERVICE ALTERATIONS
NO. TYPE ACTION
1 Sewer
Install new SMH lid to match Design Footpath surface
2 Telstra
Replace Telstra pit to Design Footpath surface (+50mm)
3 Water
Install new valve cover to match Design Footpath surface (-380mm)
Remove 30m of linemarking
from sawcut.
1
2
3
BEWARE: Ensure
Electricity main is located
and depthed before
excavation.
BEWARE: Ensure Water
main is located and
depthed before
excavation.
300Ø
R
C
P
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
1:400
5
GENERAL LAYOUT & FINISHES
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
LEGEND
Concrete Kerb
- IDM SD100
Road Pavement
- As Per Sheet 2
Concrete Footpath
- IDM SD205
Naturestrip
- 50mm Kykuyu turf
- 75mm Topsoil
Stenciled Concrete
- IDM SD205 & Sheet 2
- 150mm depth
Gravel Driveway
- 50mm Crushed Rock
W
O
O
D
S
T
R
E
E
T
N
E
L
S
O
N
S
T
R
E
E
T
N
E
LS
O
N
S
T
R
E
E
T
92-94 WOOD STREET
83 WOOD STREET
2 NELSON STREET
5 NELSON STREET
3 NELSON STREET
7 NELSON STREET
Existing Contours
- Levels to AHD (0.10m interval)
Install IDM SD210 expansion
joint between existing and
new footpath
Construct SEP and connect
to existing SEP by 300Ø
RCP at 1%.
Construct 2.5m wide stenciled
concrete slab adjacent kerb as
shown (for heavy vehicles).
Match new sealed
pavement surface to
existing road surface
Match new sealed
pavement surface to
existing road surface
Match new sealed
pavement surface to
existing road surface
Raised Reflective Pavement Marker
- Installed to VicRoads Vol 2.02 Guidelines
(Clause 5.6)
Linemarking
Landscape Area
- Parks to Landscape centre island
Design Contours
- Levels to AHD (0.10m interval)
See Page 1 for
Linemarking extents.
See Page 1 for
Linemarking extents.
Construct 6m section of kerb
in front of light pole as B3
style (IDM SD100) with a 2m
transition length either side.
C
H
:
1
8
.
4
1
C
H
:
2
0
.
0
0
C
H: 25.00
C
H
:
3
0
.
0
0
C
H
:
3
5
.
0
0
C
H
:
4
0
.
0
0
C
H
:
4
5
.
0
0
C
H
:
5
0
.
0
0
C
H
:
5
5
.
0
0
C
H
:
6
0
.
0
0
C
H
:
6
5
.
0
0
C
H
: 7
0
.0
0
C
H
: 7
5
.0
0
C
H
: 80.00
C
H
: 8
.4
6
C
H
: 1
0
.0
0
C
H
:
1
5
.
0
0
C
H
: 2
0
.0
0
C
H
: 2
5
.0
0
C
H: 30.00
C
H: 35.00
C
H
: 40.00
C
H
: 4
5
.0
0
C
H
:
5
0
.
0
0
C
H
:
5
5
.
0
0
C
H
:
6
0
.
0
0
C
H
:
6
5
.
0
0
C
H
:
7
0
.
0
0
C
H
:
7
5
.
0
0
C
H
:
8
0
.
0
0
C
H
:
8
5
.
0
0
C
H
:
9
0
.
0
0
C
H
:
9
5
.
0
0
C
H
:
4
.
1
8
C
H
:
5
.
0
0
C
H: 10.00
C
H
:
1
5
.
0
0
C
H
:
2
0
.
0
0
C
H
:
2
5
.
0
0
C
H
:
3
0
.
0
0
C
H
:
3
5
.
0
0
C
H
: 4
0
.0
0
C
H: 4
5.00
C
H
: 5
0
.0
0
C
H
:
5
5
.
0
0
C
H
:
6
0
.
0
0
C
H
:
6
5
.
0
0
C
H
:
7
0
.
0
0
C
H
:
5
.
0
0
C
H
:
1
0
.
0
0
C
H
:
1
5
.
0
0
C
H: 20.0
0
C
H
:
2
5
.
0
0
C
H
: 3
0
.0
0
C
H
:
3
5
.
0
0
C
H
:
4
0
.
0
0
C
H
: 4
5
.0
0
C
H
:
4
8
.
3
8
STN 1
RL 242.236
STN 3
RL 242.136
STN 4
RL 242.221
STN 6
RL 242.231
STN 7
RL 239.968
PSM 214
RL 242.864
C
H
:
4
.
1
8
C
H
:
7
1
.
4
2
7.40 6.00
13.40
4.60
5
.
5
0
5
.
3
5
5
.
2
5
6
.0
0
5
.
8
0
5.00
4.60
5
.2
0
5
.
1
5
5
.
8
0
4
.
2
5
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
1:400
6
GEOMETRIC LAYOUT, ALIGNMENTS & KERB TYPES
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
W
O
O
D
S
T
R
E
E
T
N
E
L
S
O
N
S
T
R
E
E
T
N
E
LS
O
N
S
T
R
E
E
T
92-94 WOOD STREET
83 WOOD STREET
2 NELSON STREET
5 NELSON STREET
3 NELSON STREET
7 NELSON STREET
Kerb 1
Kerb 3
Kerb 2
Kerb 4
-2
.3
6
%
0
.2
1
%
0.55%
-
2
.
1
7
%
3
.
3
3
%
-1.61%
-
3
.
8
1
%
-
3
.
0
3
%
-
3
.
3
6
%
-
3
.
8
8
%
-
2
.
9
3
%
-
2
.
0
4
%
Design Contours
- Levels to AHD (0.10m interval)
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
1:400
7
SURFACE SLOPE PLAN
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
W
O
O
D
S
T
R
E
E
T
N
E
L
S
O
N
S
T
R
E
E
T
N
E
LS
O
N
S
T
R
E
E
T
92-94 WOOD STREET
83 WOOD STREET
2 NELSON STREET
5 NELSON STREET
3 NELSON STREET
7 NELSON STREET
LEGEND
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
-
8
KERB LONG SECTIONS
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
CHAINAGE
DESIGN
R.L. 236.00
KERB 2: NORTH-WEST KERB LONGITUDINAL SECTION CH 0.000 To 105.000
SCALES: H 1:300 V 1:100 (A3)
LIP OF KERB
LIP OF KERB
NS
15.00
18.41
18.55
20.00
21.05
23.55
25.00
30.00
35.00
40.00
45.00
45.58
50.00
55.00
55.58
60.00
65.00
65.58
70.00
74.81
75.00
77.31
78.88
79.81
80.00
85.00
CHAINAGE
238.96
239.11
239.11
239.11
239.12
239.19
239.24
239.41
239.52
239.77
239.99
240.26
240.63
240.74
241.07
241.44
241.47
241.76
242.05
242.09
242.27
242.17
242.17
242.19
242.19
242.18
242.18
242.15
239.11
239.12
239.19
239.24
239.41
239.51
239.88
240.25
240.62
240.99
241.03
241.33
241.61
241.63
241.81
241.95
241.96
242.05
242.15
242.15
242.18
242.18
242.18
242.18
Crest
R.L. 233.50
I.P
. 239.110
4.31%
I.P
. 239.224
7.37%
5.00
I.P
. 241.768
1.96%
20.00
I.P
. 242.194
-0.45%
5.00
KERB 1: SOUTH-WEST KERB LONGITUDINAL SECTION CH 15.000 To 85.000
SCALES: H 1:300 V 1:100 (A3)
DESIGN
LIP OF KERB
LIP OF KERB
NS
0.00
5.00
8.46
8.46
8.78
9.49
10.00
11.28
13.78
14.47
15.00
19.47
20.00
24.47
25.00
30.00
35.00
40.00
45.00
50.00
51.21
55.00
56.21
58.71
60.00
61.21
65.00
69.20
70.00
75.00
79.20
80.00
85.00
89.20
89.96
90.00
92.46
94.96
95.00
100.00
105.00
242.04
242.04
242.03
242.02
242.02
242.02
242.02
242.02
242.03
242.03
242.04
242.09
242.10
242.11
242.17
242.18
242.22
242.22
242.25
242.26
242.28
242.29
242.31
242.32
242.53
242.58
242.56
242.60
242.61
242.64
242.67
242.68
242.67
242.59
242.57
242.35
242.16
242.11
242.10
241.86
241.75
241.75
241.54
241.33
242.02
242.02
242.02
242.02
242.02
242.03
242.05
242.06
242.07
242.12
242.12
242.16
242.16
242.19
242.22
242.25
242.28
242.31
242.32
242.33
242.34
242.34
242.34
242.34
242.33
242.32
242.32
242.28
242.22
242.21
242.09
241.97
241.94
241.94
241.85
241.75
241.75
Sag
Crest
I.P
. 242.022
-0.22%
I.P
. 242.016
1.35%
5.00
I.P
. 242.126
0.60%
10.00
I.P
. 242.346
-0.20%
10.00
I.P
. 242.300
-3.34%
20.00
I.P
. 241.856
-4.11%
5.00
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
-
9
KERB LONG SECTIONS
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
0.00
4.18
4.82
5.00
7.32
9.82
10.00
15.00
19.42
20.00
25.00
29.42
30.00
30.60
39.42
40.00
44.58
45.00
49.58
50.00
54.58
55.00
60.00
60.78
63.28
65.00
65.78
66.21
68.71
70.00
71.21
71.42
75.00
80.00
CHAINAGE
241.12
241.12
241.29
241.29
241.29
241.32
241.33
241.49
241.63
241.63
241.83
241.99
242.01
242.17
242.26
242.27
242.27
242.16
242.19
241.76
241.73
241.51
241.48
241.17
241.14
240.78
240.72
240.53
240.40
240.33
240.29
240.08
239.99
239.91
239.90
239.90
239.90
239.68
239.42
241.29
241.31
241.32
241.41
241.52
241.53
241.75
241.95
241.98
242.14
242.20
242.20
242.20
242.05
242.03
241.86
241.85
241.64
241.61
241.31
241.28
240.90
240.84
240.63
240.46
240.38
240.33
240.09
239.99
239.91
239.90
Crest
R.L. 234.00
I.P
. 241.283
3.95%
I.P
. 241.407
4.50%
5.00
I.P
. 242.401
-3.55%
20.00
I.P
. 241.686
-7.55%
10.00
I.P
. 240.652
-10.93%
5.00
I.P
. 240.058
-5.87%
5.00
KERB 3: EAST KERB LONGITUDINAL SECTION CH 0.000 To 80.000
SCALES: H 1:300 V 1:100 (A3)
0.00
2.00
5.00
10.00
11.98
12.00
15.00
20.00
22.00
25.00
26.16
30.00
35.00
36.16
36.16
40.00
45.00
46.16
48.38
CHAINAGE
242.31
242.31
242.16
241.98
241.76
241.74
241.74
241.79
242.01
242.14
242.36
242.41
242.46
242.42
242.40
242.40
242.41
242.42
242.41
242.31
242.31
242.31
242.26
242.16
242.04
241.93
241.92
241.92
241.94
242.08
242.16
242.31
242.36
242.51
242.60
242.60
242.60
242.57
242.42
242.36
242.26
Sag
Crest
R.L. 236.50
I.P
. 242.256
-4.78%
I.P
. 241.683
4.80%
20.00
I.P
. 242.843
-4.80%
20.00
KERB 4: CENTRE ISLAND LONGITUDINAL SECTION CH 0.000 To 48.381
SCALES: H 1:300 V 1:100 (A3)
DESIGN
LIP OF KERB
LIP OF KERB
NS
DESIGN
LIP OF KERB
LIP OF KERB
NS
7.40 6.00
13.40
4.60
5
.
5
0
4
.
0
0
5
.
3
5
3
.
5
0
5
.
2
5
3
.
0
0
3
.
5
0
6
.0
0
4
.6
0
5
.
8
0
3
.
5
0
5.00
4.40
4.60
3.30
5
.2
0
3
.5
0
5
.
1
5
3
.
5
0
5
.
8
0
3
.
5
0
4
.
2
5
3
.
5
0
0
.
8
5
0
.6
0
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
1:400
10
SIGNS, LIGHTING, RRPMS & LINEMARKING
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
W
O
O
D
S
T
R
E
E
T
N
E
L
S
O
N
S
T
R
E
E
T
N
E
LS
O
N
S
T
R
E
E
T
92-94 WOOD STREET
83 WOOD STREET
2 NELSON STREET
5 NELSON STREET
3 NELSON STREET
7 NELSON STREET
TYPICAL SPLITTER ISLAND
LINEMARKING & SIGNAGE
SCALE: 1:100
R1-3B
R2-3B
New Cat. V Light with
1.5m arm.
New Cat. V Light.
1.5m arm.
Replace light with Cat.
V Light with 1.5m arm
New Cat. V Light with
6m arm.
Install Solar Light Pole.
80W Solar Light at 8.0m
high with 1.5m arm.
LEGEND
New Category V Light
- Existing Pole as noted
Linemarking
- 100mm Thick Line
Raised Reflective Pavement Marker
- Installed to VicRoads Volume 2 Guidelines
(Clause 5.6)
SETOUT
Design line marking is to be spotted in at
3.0m centers using the electronic setout
provided by CoGB. Spotting is then to be
approved by the project Superintendant prior
to linemarking
SIGNAGE
All signage is to be installed 1.0m behind the
face of kerb, and as per this sheet
TGSIs
Install stick/screw down Polyeurathane
TGSIs plates as shown and in accordance
with AS1428
SIGN INSTALLATIONS
NO. TYPE ACTION
1
No Stopping Install existing sign from demo plan 3
2
Give Way RBT Install new sign
3
Give Way RBT Install new sign
4
Give Way RBT Install new sign
5Keep Left Install new sign
6
Keep Left Install new sign
7
Keep Left Install new sign
1
2
3
4
5
6
7
STN 1
RL 242.236
STN 3
RL 242.136
STN 4
RL 242.221
STN 6
RL 242.231
STN 7
RL 239.968
PSM 214
RL 242.864
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
-
11
SETOUT LOCATIONS
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
STATION DATA
Point #
901
902
903
904
905
906
907
908
Description
STN 1
STN 2
STN 3
STN 4
STN 5
STN 6
STN 7
PSM 214
Easting
255308.553
255181.394
255238.567
255266.044
255341.525
255320.001
255363.475
255297.457
Northing
5931564.747
5931567.901
5931563.700
5931559.574
5931489.624
5931573.822
5931616.860
5931577.267
Level
242.236
243.767
242.136
242.221
237.580
242.231
239.968
242.864
SETOUT
Point #
1
2
3
4
5
6
7
8
9
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Easting
255251.555
255253.005
255254.155
255255.268
255257.382
255259.254
255260.852
255263.065
255264.997
255266.617
255267.423
255271.065
255271.737
255272.847
255274.809
255277.413
255280.705
255283.074
255283.824
255285.324
255286.074
255288.532
255290.933
255292.823
255295.171
255297.426
255297.722
255298.024
255299.711
255300.726
255302.412
255304.089
255305.623
255307.140
255309.004
255308.985
255309.741
255311.301
255313.003
255314.468
255315.934
255317.399
255318.865
255320.331
255321.886
255322.536
255323.030
255323.570
255324.290
255326.046
Northing
5931574.810
5931574.587
5931574.339
5931573.959
5931573.146
5931572.512
5931572.031
5931571.455
5931571.035
5931570.741
5931571.068
5931570.537
5931569.948
5931569.813
5931569.657
5931569.611
5931569.816
5931570.148
5931571.302
5931571.302
5931570.798
5931571.530
5931572.430
5931573.112
5931574.345
5931575.742
5931575.935
5931576.121
5931577.190
5931577.751
5931578.771
5931579.903
5931581.053
5931582.309
5931584.012
5931584.891
5931586.187
5931586.145
5931587.725
5931589.086
5931590.447
5931591.808
5931593.169
5931594.530
5931595.974
5931596.709
5931597.558
5931598.469
5931599.245
5931600.778
Level
242.147
242.106
242.110
242.117
242.143
242.169
242.188
242.211
242.227
242.239
0.000
0.000
242.270
242.277
242.289
242.304
242.325
242.339
0.000
0.000
242.358
242.373
242.389
242.375
242.386
242.395
242.398
242.398
242.423
242.422
242.418
242.414
242.410
242.406
242.398
0.000
0.000
242.375
242.345
242.315
242.282
242.236
242.190
242.134
242.072
242.035
241.998
241.965
241.930
241.849
SETOUT
Point #
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
Easting
255341.357
255339.100
255336.587
255333.974
255331.664
255330.562
255329.204
255327.916
255326.702
255325.565
255324.507
255323.531
255322.639
255321.631
255322.191
255321.435
255320.595
255319.951
255319.559
255319.156
255318.900
255318.797
255318.885
255319.047
255319.164
255319.629
255320.580
255321.087
255321.918
255322.527
255323.370
255324.357
255323.828
255324.169
255324.916
255325.968
255327.150
255327.995
255328.825
255325.387
255324.566
255324.134
255324.270
255324.407
255323.975
255323.461
255322.535
255321.512
255320.101
255319.191
Northing
5931596.793
5931595.680
5931595.807
5931595.912
5931594.682
5931593.620
5931592.192
5931590.700
5931589.148
5931587.538
5931585.875
5931584.163
5931582.406
5931580.116
5931578.921
5931577.626
5931577.247
5931575.008
5931573.337
5931571.149
5931569.197
5931567.260
5931565.322
5931564.057
5931563.402
5931561.518
5931558.995
5931557.885
5931556.066
5931554.734
5931554.474
5931553.345
5931551.887
5931551.140
5931549.988
5931549.102
5931548.102
5931546.805
5931544.999
5931523.645
5931525.442
5931527.076
5931528.760
5931530.445
5931532.078
5931533.153
5931534.887
5931536.566
5931538.583
5931539.738
Level
241.409
241.461
241.568
241.725
241.885
241.969
242.077
242.183
242.274
242.345
242.396
242.427
242.439
242.425
0.000
0.000
242.364
242.285
242.211
242.109
242.018
241.924
241.818
241.741
241.699
241.569
241.368
241.276
241.125
241.015
0.000
0.000
240.763
240.690
240.535
240.368
240.234
240.118
240.018
239.231
239.292
239.384
239.490
239.637
239.784
239.877
240.031
240.186
240.379
240.495
SETOUT
Point #
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
Easting
255317.901
255316.529
255314.916
255313.597
255312.610
255312.511
255310.318
255308.610
255307.177
255305.042
255303.194
255301.374
255300.271
255299.202
255297.527
255295.694
255293.837
255292.763
255291.958
255290.060
255288.144
255286.074
255285.324
255283.824
255283.074
255282.328
255280.749
255283.824
255283.824
255283.824
255286.501
255288.479
255290.457
255292.435
255294.413
255296.391
255298.369
255300.347
255302.325
255305.150
255306.129
255307.841
255309.553
255311.265
255312.467
255283.824
255285.622
255287.420
255289.219
255291.017
Northing
5931541.222
5931542.630
5931544.100
5931543.943
5931545.073
5931545.983
5931547.429
5931548.401
5931549.121
5931550.049
5931550.720
5931551.269
5931551.620
5931552.062
5931552.809
5931553.558
5931554.246
5931554.612
5931554.872
5931555.435
5931555.936
5931556.402
5931555.858
5931555.858
5931556.943
5931557.055
5931557.292
5931553.858
5931551.858
5931550.564
5931550.164
5931549.868
5931549.572
5931549.276
5931548.980
5931548.684
5931548.388
5931548.092
5931547.796
5931547.374
5931546.783
5931545.749
5931544.716
5931543.682
5931542.956
5931572.802
5931573.678
5931574.553
5931575.428
5931576.304
Level
240.649
240.803
240.971
240.973
240.936
241.173
241.316
241.402
241.462
241.545
241.615
241.683
241.722
241.760
241.822
241.888
241.952
241.987
242.013
242.073
242.133
242.197
0.000
0.000
242.261
242.266
242.307
242.046
241.880
241.789
241.670
241.630
241.591
241.553
241.515
241.476
241.438
241.400
241.355
241.216
241.134
240.977
240.821
240.759
240.859
242.444
242.549
242.654
242.758
242.863
SETOUT
Point #
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
Easting
255292.815
255294.613
255296.412
255298.210
255300.008
255301.304
255303.217
255304.713
255306.208
255307.704
255309.199
255310.695
255312.791
255313.903
255315.532
255317.039
255318.545
255320.052
255321.559
255322.491
255324.939
255323.601
255322.536
255322.199
255321.841
255321.482
255321.240
255322.321
255323.139
255323.957
255324.775
255325.593
255326.411
255327.278
255325.863
255304.972
255307.689
255309.993
255311.532
255312.072
255311.532
255309.993
255307.689
255304.972
255302.255
255299.952
255298.413
255297.872
255298.413
255299.952
Northing
5931577.179
5931578.055
5931578.930
5931579.805
5931580.681
5931581.311
5931583.010
5931584.338
5931585.666
5931586.994
5931588.322
5931589.650
5931591.511
5931594.333
5931595.756
5931597.072
5931598.387
5931599.703
5931601.018
5931601.832
5931580.613
5931578.322
5931576.497
5931574.640
5931572.673
5931570.705
5931569.372
5931566.958
5931565.133
5931563.308
5931561.483
5931559.657
5931557.832
5931555.897
5931554.661
5931557.388
5931557.928
5931559.467
5931561.771
5931564.488
5931567.205
5931569.508
5931571.047
5931571.588
5931571.047
5931569.508
5931567.205
5931564.488
5931561.771
5931559.467
Level
242.968
243.072
243.133
243.117
243.038
242.973
242.836
242.706
242.565
242.459
242.564
242.709
242.887
243.007
243.037
243.012
242.954
242.884
242.794
242.729
242.335
242.431
242.349
242.203
242.048
241.893
241.788
241.583
241.428
241.273
241.118
240.977
240.899
240.887
240.898
241.831
241.773
241.770
241.820
241.925
242.083
242.259
242.419
242.527
242.583
242.586
242.538
242.437
242.284
242.109
SETOUT
Point #
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
Easting
255302.255
255313.086
255315.187
255315.824
255316.359
255317.348
255318.338
255317.243
255315.216
255319.234
255319.846
255320.495
255320.444
255320.039
255314.085
255312.427
255312.171
255312.330
255313.313
255314.297
255315.659
255314.838
255316.579
255315.790
255316.567
255316.956
255317.091
255290.712
255290.299
255289.957
255289.324
255287.599
255285.874
255285.874
255288.301
255283.274
255283.274
255280.768
255278.263
255275.758
255273.253
255272.984
255273.310
255275.797
255278.290
255280.783
Northing
5931557.928
5931552.713
5931553.877
5931553.967
5931553.609
5931552.209
5931550.808
5931549.852
5931551.356
5931548.138
5931548.673
5931547.755
5931547.353
5931547.368
5931575.508
5931577.191
5931577.747
5931578.338
5931579.746
5931581.155
5931580.360
5931577.945
5931582.833
5931583.294
5931584.406
5931584.498
5931584.121
5931565.560
5931563.205
5931562.644
5931562.465
5931562.636
5931562.807
5931564.806
5931565.135
5931564.563
5931563.065
5931563.313
5931563.561
5931563.809
5931564.058
5931564.385
5931564.655
5931564.480
5931564.406
5931564.434
Level
241.943
241.418
241.339
241.296
241.254
241.147
241.039
241.091
241.280
240.903
240.887
240.848
240.845
240.854
242.398
242.413
242.418
242.420
242.424
242.425
242.390
242.392
242.386
242.407
242.394
242.390
242.387
242.299
242.307
242.308
242.304
242.288
242.270
242.256
242.279
242.232
242.243
242.215
242.187
242.160
242.133
242.132
242.135
242.160
242.184
242.208
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
-
12
SETOUT TABLES
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
20/12/18
11/07/19
-
13
SURFACE DIFFERENCE PLOT
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
0.55 to 0.30
0.30 to 0.15
0.15 to 0.05
0.05 to -0.05
-0.05 to -0.15
-0.15 to -0.30
-0.30 to -0.50
FSL change
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
-
14
COVER SHEET
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
WOOD STREET
LONG GULLY
GB4449
INTERSECTION UPGRADES
DOWDING STREET INTERSECTION
JULY 2019
LOCALITY MAP
D
O
W
D
IN
G
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
2
6
D
O
W
D
IN
G
S
T
R
E
E
T
DOCUMENT CONTROL
SH
EE
T
No
.
SH
EE
T
DE
SC
.
11/07/19
14/04/20
01/12/20
DRAFT TENDER CONSTRUCTION
REVISION REVISION REVISION
1 - 13 NELSON STREET ROUNDABOUT PLANS A A A
14 COVER SHEET A A A
15 GENERAL NOTES A A A
16 DEMOLITION PLAN A A A
17LAYOUT, FINISHES & ALIGNMENTS
A A A
18 SIGNAGE & LINEMARKING A A A
19 KERB & CHANNEL LONG SECTIONS A A A
20 LIGHTING UPGRADES A A A
21 SETOUT N/A N/A A
22 - 29 WEATHERALL STREET INTERSECTION PLANS A A A
30 SPEED HUMP LOCATIONS A A A
D
O
W
D
IN
G
S
T
R
E
E
T
2
4
D
O
W
D
IN
G
S
T
R
E
E
T
2
5
D
O
W
D
IN
G
S
T
R
E
E
T
2
7
D
O
W
D
IN
G
S
T
R
E
E
T
2
9
D
O
W
D
IN
G
S
T
R
E
E
T
PROJECT EXTENTS
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
-
15
GENERAL NOTES
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
IMPORTANT!
The location of underground services have been derived from
available information, however accuracy cannot be guaranteed.
All existing service information should therefore be treated as
indicative only, and service locations must be arranged prior to
commencement of any excavation. The contractor will be held
responsible for any damage caused to underground services.
Kerb Returns and straights - IDM SD100 - SM2
600
300110 190
275
40
Setout is to back of kerb
500
SM2 kerb is to have a
0.5m flat area behind
190
Splitter Islands - IDM SD100 - SM1
300
110 190
275
125
Setout is to back of kerb
150
Reinforced
concrete apron
VEGETATION PROTECTION NOTES
1. If fencing is required as a condition of the Planning Permit or as a result of the
pre-construction meeting, a three strand star picket and wire fence shall be constructed.
2. All trees and shrubs are to be retained unless otherwise shown or directed by the
Superintendent's Representative.
3. No tree or native vegetation is to be disturbed or removed without prior approval. Any
approved trees or vegetation removed as part of the works are not to be burnt onsite.
4. If tree roots are discovered during excavation works, works in the immediate area shall
cease until the Superintendent's Representative has inspected, and approved works to
proceed.
FILL NOTES
1. All earthworks and compaction are to be in accordance with VicRoad's Specification
Section 204.
2. All fill materials are to be approved by the Superintendent's Representative prior to being
imported onto the site, and unless noted otherwise, shall be a clean clay based material
free of vegetation matter or contaminants.
3. All filling is to comply with AS3798-1996 Appendix B, level 1 (or 2) as specified
4. The Contractor is responsible for ensuring that all imported fill material, including topsoil,
satisfies the description for clean fill material in EPA bulletin publication No. 448 (Sep
95) and subsequent revisions. The Contractor shall provide verification including test
certificates to the Superintendent's Representative.
ROAD CONSTRUCTION NOTES
1. All Works to be carried out in accordance with CoGB Standard Drawings, Specifications,
approved plans and to the satisfaction of the Superintendent's Representative.
2. These notes also refer to the latest version of the Infrastructure Design Manual (IDM) and
latest version of the IDM Standard Drawings.
3. The Project Manager is to be notified seven days prior to the commencement of Works
with a Pre-commencement meeting to be held between CoGB, the Consultant and the
Contractor. A site management plan is to be submitted prior to the commencement of
Works and prior to the onsite Pre-commencement meeting.
4. Prior to commencement of the Works, the Contractor shall provide the following:
- Source of quarry material
- N.A.T.A. approved test results for the F.C.R that is to be used
- If the source of the quarry material is changed during the course of the Works, then new
test results shall be provided.
5. Prior to commencement of Works on site, the Contractor must ensure that all matters
relating to the Occupational Health and Safety Act 1985, have been and will be complied
with.
6. On the commencement of construction, the Contractor must comply with the
recommendation of the Environment Protection Authority publication "Construction
Techniques for Sediment Pollution Control". Appropriate siltation control is to be
maintained throughout the construction and maintenance period of the Works.
7. The disposal site for spoil storage, and truck removal route, is to be submitted in writing
to, and approved by the Superintendent's Representative prior to the commencement of
Works.
8. Where Works are in the vicinity of existing services, these services are to be located and
exposed prior to commencement of the work. Relevant authorities are to be notified 7
days prior to the Works.
9. All dimensions are in metres unless noted otherwise.
10. All levels are to Australian Height Datum (AHD) unless noted otherwise.
11. All co-ordinates are to Map Grid of Australia (MGA) unless noted otherwise.
12. The Contractor must arrange the inspection of the Works with the Superintendent's
Representative as per the hold points in the Specifications, or as directed by the
Superintendent's Representative.
13. All redundant assets are to be removed and disposed off site unless noted otherwise.
14. All service conduit trenches under road pavements, under footpaths and under swales are
to be backfilled as per IDM SD310 unless noted otherwise. Compaction standards noted
in SD310 shall be achieved.
15. Blasting is not generally accepted.
16. All existing assets affected by the Works (i.e. signs, vehicle crossings, footpaths, kerb and
line marking) shall be reinstated by the Contractor before the completion of Works, to the
satisfaction of the Superintendent's Representative.
17. At the completion of all Works, all rubbish, debris and surplus spoil shall be removed and
the site shall be cleared to the satisfaction of the Superintendent's Representative.
18. The Contractor is to obtain a Building Permit for any structures, fences and for any
retaining walls over 1.0m in height.
19. Any infrastructure damage incurred during the Defects Liability Period noted on the
contract is the responsibility of the Contractor and is to be reinstated to the satisfaction of
the Superintendent's Representative.
20. All disturbed areas (eg. nature strips, batters, allotments and reserves) are to be
reinstated to a clean, tidy condition, top dressed with 75mm min. depth approved top soil,
and seeded with a CoGB approved blend or unless otherwise noted. Soil & seeded
treated areas must be satisfactorily established prior to the end of the Maintenance Period
otherwise further treatment is required by the Contractor.
21. Any exposed aggregate concrete works are to be achieved by sandblasting only. Washing
aggregate off with water is not permitted.
22. The Contractor shall notify the public of any impending road closures by providing
sufficient signage 2 weeks prior to construction commencing.
PAVEMENT NOTES
1. Construction of road pavements is to be in accordance with the requirements of VicRoad's
Standard Specifications for Roadworks (Section 304). Testing must be carried out by a N.A.T.A.
approved laboratory, or by calibrated nuclear densometer test to the relevant Australian
Standard.
2. Compaction tests are to be undertaken in the following locations:
- At
2
3
depth of the pavement
- At alternating sides of the road
- 1.0m in from the seal edge or lip of kerb
- At even spacings.
3. The number of compaction tests shall comply with the table below:
Location Number of Compaction tests
Court bowls 3
Intersections 2
Straights 1 per 500m2 (1/50m for 10.2m wide pvmt.)
4. Copies of the geotechnical results are to be submitted to the Superintendent's Representative.
5. Sub-base and base materials are to be at 85% optimum moisture content (OMC) during
compaction, and maintained at 85% OMC until proof rolling.
6. Typical Compaction levels required (unless noted otherwise):
Subgrade: To be compacted to 100% standard dry density ratio.
Subbase: Flexible pavements shall be compacted in accordance with Scale C in VicRoads table
304.082.
Compaction shall be to 98% of the maximum dry density ratio determined by the modified
compaction test.
Base: Flexible pavements shall be compacted in accordance with Scale C in VicRoads table
304.082.
Compaction shall be to 100% of the maximum dry density ratio determined by the modified
compaction test.
7. Proof rolling of the Subgrade, Sub base and Base must be undertaken as per Section 12.7.15 of
the IDM. Proof rolling will be at the expense of the contractor in accordance with AS3798 and the
requirements of section 173 and 204.12 of the VicRoad's Specification. The Superintendent's
Representative must be present during the proof rolling. The Subgrade must not deflect more
than 2mm vertically within 300mm of the test roller in isolated locations.
8. Identification and treatment of soft areas during proof rolling shall be dealt with as per Sections
12.7.13 and 12.7.14 of the IDM and as approved by the Superintendent's Representative.
SIGNAGE, GUIDE POSTS, LINEMARKING & RRPMS
1. All existing signage, linemarking guideposts and RRMPs within Works site are to be removed
as per the 'demolition plan'
2. All proposed Signage, linemarking, guideposts and RRPMs are to be installed as per the
'Linemarking and signage plan'
3. All signs to be installed shall be Class 1 high intensity type and comply with the requirements of
AS1743-2001.
4. All guideposts are to have delineators satisfying the requirements of AS1906.2 section 3.
FOOTPATH CONSTRUCTION NOTES
1. Any property storm water pipes located during works are to be plumbed to the nearest pit. Where this is not practical, seek approval
from superintendent to plumb to kerb or into nearest storm water pipe.
2. Footpath to be constructed to SD205 unless noted otherwise.
3. An SD210 expansion joint is to be constructed at any joins with existing footpath, existing driveways or bridges.
4. SD210 Expansion joints along any new sections of footpath are to be at a maximum separation of 14m centres as per SD205.
5. Tool joints are to be at 1.2m centres and constructed to SD210 unless noted otherwise.
6. Pedestrian crossings are to be constructed as per IDM SD192 and are to have the boxing inspected by the Superintendents
representative prior to pouring concrete.
7. All pedestrian crossings are to have ceramic tile TGSIs installed as per AS1428.4
GENERAL CONSTRUCTION NOTES
1. All kerb, footpath and pram crossing constructions shall have bedding/boxing inspected by the Superintendent's Representative prior to
pouring of concrete.
2. All driveway laybacks in kerb are to be as per IDM SD 120 unless noted otherwise
3. If property stormwater outlets (not already identified on plan) are located during construction, it is the Contractors responsibility to connect
them into council underground drainage or back of kerb (As per IDM SD140) to the approval of the Superintendent's Representative.
4. Renewal of gas and water property service conduits to be 100mmØPVC (sewer grade).
5. All sewer man-hole covers within the footpath alignment (wholly or partly) are to be renewed & adjusted to design finished levels unless
noted otherwise or directed by the Superintendent's Representative.
6. All redundant footpath, kerb and road seal to be saw cut and removed from site as per the 'demolition plan'.
7. All service pits are to be renewed and matched into design surface unless noted otherwise or directed by the Superintendent's
Representative.
DRAINAGE CONSTRUCTION NOTES
1. The Superintendent's Representative and Design Engineer must be notified if any any modifications to drainage design are
required due to unforseen circumstances identified during works onsite.
2. Any property storm water pipes located during Works are to be plumbed to the nearest pit. Where this is not practical, seek
approval from the Superintendent's Representative to connect stormwater into kerb or into the nearest storm water pipe.
3. All drainage pits are to be constructed as per the noted Standard Drawing.
4. Invert fall through pits is to be a min. of 30mm unless noted otherwise.
5. Concrete pit walls are to be sponge finished and floors are to be shaped for best hydraulic efficiency unless noted otherwise.
6. Pit lids are to be installed flush with the surrounding surface unless noted otherwise.
7. Where concrete box culverts (CBC) or Crown Units are specified, they are to be compliant to AS1597 and designed to the
latest revision of the shear design standard.
8. Pipe extensions are to be constructed by removing the remaining stub of the existing pipe to be extended, and then
connecting the new pipe at the socket.
9. All pipe backfill is to be constructed as per the noted Standard Drawing.
10. The location of any saw cuts in asphalt are to be kept the minimum required trench width until after the pipe is laid and
backfilled up to 300mm from surface. At this point, a further 150mm wide, 300mm deep section of asphalt/pavement is to be
sawcut and excavated so as to provide a longitudinal pavement join over the drainage trench. This also should ensure a
straight edge for re-asphalting. The top 300m depth of backfill should then be constructed accordingly.
11. At the completion of the Works, pipes are to be visually inspected via inspection pits to check for construction debris, including
crushed rock, soil and concrete over spill. Should a volume of debris be present enough to impede flows, pipe cleaning shall
be undertaken at the contractors expense.
12. Gas and water property services are generally not located during the design phase and therefore have not been shown on
plans. It is therefore the Contractors responsibility to consider these services when excavating and adjust or realign
accordingingly whilst causing minimal disruption to property owners.
13. Gas and Water property services encountered during construction are to be altered and reconnected to the appropriate
standard and to the satisfaction of the Superintendents Representative.
KERB DETAILS
FOOTPATH DETAILS
STENCILED CONCRETE
LANDSCAPING DETAILS
1500
2.5
%
cro
ssfa
ll
125mm thick 25MPa concrete
slab with central SL72
IDM SD205
Bedding, 50mm thick layer
compacted CL3 FCR
5050
Varying widths
Bedding, 100mm thick layer
compacted CL3 FCR
- 150mm thick 32MPa concrete slab
- 1 layer SL82 placed 50mm from bottom
- Flagstone stencil pattern, Charcoal
color, clear seal
50
ROLL OUT GRASS
75
Loamy sand
Pull strin
g b
etw
een ke
rbs fo
r gra
de
Transverse Pavement Joins
300 300
existing pavement
Where design pavement meets
existing pavement, the design
layers are to be overlapped into the
existing pavement by 300mm as
shown
Dowel into kerb
with 200mm long
N10s at 500mm
cts. Pre-drill and
place dowels
100mm below top
of kerb
50
Kykuyu roll out grass sod
KERB & CHANNEL CONSTRUCTION NOTES
1. Where design kerb is to be matched into existing kerb of a different
profile, a 3m transition length is required. Over the transition length,
the kerb invert is to continue to fall in the direction of the existing kerb,
unless otherwise noted.
SEAL: Type V Asphalt (10mm)
BASE: Class 1 FCR (20mm)
Place and compact in 2 even layers
Compact to a min. of 98% MMDD
(min CBR 80)
Existing material:
- See notes this page for all compaction and testing
requirements
MINIMUM PAVEMENT REQUIREMENTS
40
260
300
PSM 1766
RL 240.798
PSM 221
RL 238.582
STN 9
RL 238.675
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
1:200
16
DEMOLITION PLAN
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
27 DOWDING STREET29 DOWDING STREET
25 DOWDING STREET
23 DOWDING STREET
22 DOWDING STREET
24 DOWDING STREET
26 DOWDING STREET
LEGEND
Concrete Kerb Removal Road Pavement RemovalSawcut AsphaltFootpath Removal
SERVICE ALTERATIONS
NO. TYPE ACTION
1 Water
Install new valve cover to match Design Back of Kerb Level (+150mm)
2
Drainage
Remove SEP
3
Drainage
Remove SEP
4
Drainage
Remove 300Ø RCP
5
Drainage Convert SEP to JP (COGB SD590-A-D-H-R) and bury below Design kerb
1
2
3
4
5
D
O
W
D
IN
G
S
T
R
E
E
T
D
O
W
D
IN
G
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
Linemarking Removal
PSM 1766
RL 240.798
PSM 221
RL 238.582
STN 9
RL 238.675
C
H
5
.0
0
C
H
1
0
.
0
0
C
H
1
5
.
0
0
C
H 20.0
0
C
H
2
5
.
0
0
C
H
5
.0
0
C
H
10.00
C
H
1
5
.
0
0
C
H
20.00
C
H
2
5
.0
0
C
H
5
.0
0
C
H
1
0
.0
0
C
H
1
5
.0
0
C
H
2
0
.
0
0
C
H
2
5
.0
0
C
H
3
0
.
0
0
C
H
5
.0
0
C
H
1
0
.0
0
C
H
1
5
.
0
0
C
H 20.00
C
H
2
5
.
0
0
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
1:200
17
LAYOUT, FINISHES & ALIGNMENTS
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
27 DOWDING STREET29 DOWDING STREET
25 DOWDING STREET
23 DOWDING STREET
22 DOWDING STREET
24 DOWDING STREET
26 DOWDING STREET
LEGEND
Concrete Kerb
- IDM SD100 SM1 for Kerb islands
- IDM SD100 SM2 for all other kerb
- Pedestrian Laybacks COGB SD192
- Driveway Layback COGB SD191
Road Pavement
- 40mm Asphalt
- 230mm CL1 FCR
Concrete Footpath
- IDM SD205
Stenciled Concrete
- IDM SD205
- 150mm depth
Naturestrip Treatment
- Kykuyu Roll out turf
- 75mm topsoil
North-West Kerb
North-East Kerb
South-East Kerb
South-West Kerb
Construct SEP (COGB SD590-A-D-G-R)
on back of kerb. Extend and connect
existing 300Ø RCP.
Construct SEP (COGB SD590-A-D-G-R)
on back of kerb. Connect to converted JP.
Linemarking
Gravel Driveway
- 50mm CL3 FCR
See Page 2 for notes on
matching design kerb into
the existing kerb profile.
D
O
W
D
IN
G
S
T
R
E
E
T
D
O
W
D
IN
G
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
Raise JP lid to match design surface
levels (+50mm)
PSM 1766
RL 240.798
PSM 221
RL 238.582
STN 9
RL 238.675
3
.6
0
3
.6
0
3
.5
0
3
.5
0
3
.5
0
3
.5
0
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
1:200
18
SIGNAGE & LINEMARKING
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
27 DOWDING STREET29 DOWDING STREET
25 DOWDING STREET
23 DOWDING STREET
22 DOWDING STREET
24 DOWDING STREET
26 DOWDING STREET
SIGN ALTERATIONS
NO. TYPE ACTION
1
Give Way: R1 - 2A Install Facing Western Approach
2
Give Way: R1 - 2A Install Facing Eastern Approach
3
Keep Left: R2 - 3A Install Facing Western Approach
4
Keep Left: R2 - 3A Install on same pole as 1 Facing East
5
Keep Left: R2 - 3A Install on same pole as 2 Facing West
6
Keep Left: R2 - 3A Install Facing Eastern Approach
7
Existing Give Way
Retain
8
Existing Give Way
Retain
9
Existing Street Sign
Retain
1
2
3
4
5
6
7
8
9
LEGEND
Linemarking
D
O
W
D
IN
G
S
T
R
E
E
T
D
O
W
D
IN
G
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
-
19
KERB & CHANNEL LONG SECTIONS
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
0.00
5.00
10.00
15.00
20.00
25.00
25.94
30.94
CHAINAGE
238.11
238.11
238.30
238.30
238.30
238.41
238.66
238.94
239.32
239.37
239.37
239.37
239.61
239.61
239.61
NS CL
238.30
238.55
238.81
239.06
239.32
239.37
R.L. 235.50
I.P
. 238.300
5.09%
NORTH-EAST KERB LONGITUDINAL SECTION CH 0.000 To 30.937
SCALES: H 1:200 V 1:50 (A3)
0.00
5.00
6.74
10.00
14.24
15.00
20.00
21.74
25.00
25.92
30.92
CHAINAGE
238.79
238.79
238.70
238.70
238.70
238.54
238.51
238.56
238.39
238.29
238.22
238.17
238.14
238.14
238.14
237.98
237.98
237.98
NS CL
238.70
238.69
238.67
238.59
238.57
238.40
238.32
238.17
R.L. 235.00
I.P
. 238.699
-0.32%
I.P
. 238.669
-4.64%
15.00
NORTH-WEST KERB LONGITUDINAL SECTION CH 0.000 To 30.919
SCALES: H 1:200 V 1:50 (A3)
0.00
5.00
7.47
9.97
10.00
12.47
13.72
15.00
16.22
18.72
20.00
21.97
22.23
23.47
24.97
25.00
25.08
30.08
CHAINAGE
239.11
239.11
239.00
239.00
239.00
238.86
238.86
238.86
238.79
238.75
238.71
238.66
238.61
238.61
238.62
238.62
238.66
238.85
238.85
238.85
238.85
238.85
238.99
238.99
238.99
NS CL
239.00
238.97
238.94
238.94
238.89
238.86
238.84
238.82
238.80
238.80
238.79
238.79
238.80
238.84
238.85
238.85
DESIGN
Sag
R.L. 236.00
I.P
. 238.995
-1.02%
I.P
. 238.945
-2.13%
5.00
I.P
. 238.811
-0.41%
5.00
I.P
. 238.782
4.19%
3.00
SOUTH-WEST KERB LONGITUDINAL SECTION CH 0.000 To 30.083
SCALES: H 1:200 V 1:50 (A3)
0.00
5.00
10.00
15.00
15.98
16.98
17.98
20.00
20.35
21.35
21.76
22.35
25.00
26.94
30.00
30.89
31.89
32.89
33.62
38.63
CHAINAGE
240.07
240.07
239.79
239.79
239.79
239.41
239.08
239.04
238.98
238.90
238.76
238.77
238.88
238.78
238.79
238.86
238.91
238.96
238.96
238.95
239.15
239.21
239.18
239.18
239.18
NS CL
239.79
239.50
239.21
239.15
239.09
239.05
238.98
238.97
238.95
238.95
238.95
238.99
239.02
239.07
239.09
239.12
239.17
239.21
Sag
R.L. 236.00
I.P
. 239.794
-5.89%
I.P
. 239.089
-3.43%
2.00
I.P
. 238.938
1.45%
2.00
I.P
. 239.019
1.80%
I.P
. 239.108
5.87%
2.00
SOUTH-EAST KERB LONGITUDINAL SECTION CH 0.000 To 38.629
SCALES: H 1:200 V 1:50 (A3)
BACK OF KERB
DESIGN
BACK OF KERB
DESIGN
BACK OF KERB
DESIGN
BACK OF KERB
PSM 1766
RL 240.798
PSM 221
RL 238.582
STN 9
RL 238.675
2
2
D
o
w
d
in
g
S
tre
e
t
2
4
D
o
w
d
in
g
S
tre
e
t
7
1
W
o
o
d
S
tre
e
t
2
6
D
o
w
d
in
g
S
tre
e
t
2
8
D
o
w
d
in
g
S
tre
e
t
2
9
D
o
w
d
in
g
S
tre
e
t
2
7
D
o
w
d
in
g
S
tre
e
t
2
3
D
o
w
d
in
g
S
tre
e
t
2
5
D
o
w
d
in
g
S
tre
e
t
?
?
W
o
o
d
S
tre
e
t
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
1:300
20
LIGHTING UPGRADES
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
D
O
W
D
IN
G
S
T
R
E
E
T
D
O
W
D
IN
G
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
Install Cat P (22W) Light on existing pole
Install Cat P (22W) Light on existing pole
Existing Cat P Light
PSM 221
RL 238.582
STN 9
RL 238.675
SETOUT
Point #
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
Easting
255401.090
255401.899
255402.715
255403.470
255404.499
255405.305
255405.751
255407.220
255408.049
255409.170
255410.016
255409.537
255409.234
255410.748
255410.711
255410.582
255410.160
255409.444
255408.728
255408.306
255418.957
255419.061
255418.833
255418.605
255418.711
255418.932
255419.242
255421.074
255421.377
255421.209
255421.872
255422.587
255423.271
255424.740
255425.850
255426.927
255427.995
255428.806
255429.566
255430.344
255431.178
255440.583
255439.747
255438.906
255438.049
255437.151
255436.317
255432.355
255431.646
255429.917
Northing
5931256.958
5931257.065
5931257.042
5931257.020
5931257.174
5931257.388
5931258.938
5931259.241
5931258.936
5931260.139
5931261.549
5931262.216
5931263.685
5931264.763
5931265.620
5931266.468
5931267.679
5931268.743
5931269.808
5931271.021
5931273.260
5931271.975
5931270.706
5931269.433
5931268.144
5931267.316
5931266.516
5931266.128
5931264.659
5931263.859
5931263.336
5931262.888
5931263.285
5931263.588
5931261.922
5931261.921
5931262.068
5931262.310
5931262.686
5931263.070
5931263.313
5931254.593
5931254.497
5931254.542
5931254.587
5931254.475
5931253.725
5931252.900
5931253.329
5931252.969
Level
238.679
238.696
238.694
238.691
238.683
238.676
0.000
0.000
238.628
238.592
238.547
0.000
0.000
238.435
238.400
238.364
238.306
238.246
238.186
238.138
238.300
238.366
238.432
238.498
238.564
238.608
238.651
0.000
0.000
238.821
238.864
238.907
0.000
0.000
239.081
239.136
239.191
239.234
239.277
239.321
239.366
239.794
239.744
239.695
239.644
239.591
239.550
239.292
239.260
239.156
SETOUT
Point #
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
Easting
255428.857
255427.850
255427.496
255426.027
255425.245
255424.976
255424.730
255425.102
255425.387
255423.696
255423.682
255423.834
255424.281
255425.046
255425.829
255426.273
255415.371
255415.281
255415.541
255415.802
255415.705
255415.390
255414.918
255412.888
255412.585
255412.644
255411.534
255410.327
255409.689
255408.219
255407.201
255405.840
255405.281
255404.718
255404.131
255410.895
255408.902
255408.561
255405.353
255404.954
255407.094
255422.581
255424.088
255424.414
255427.766
255428.036
255426.712
255408.851
255410.410
255411.238
Northing
5931252.669
5931252.224
5931250.228
5931249.925
5931250.004
5931249.624
5931249.228
5931248.539
5931247.066
5931245.951
5931244.808
5931243.675
5931242.414
5931241.317
5931240.183
5931238.878
5931236.735
5931238.055
5931239.353
5931240.665
5931241.999
5931243.098
5931244.140
5931244.487
5931245.956
5931246.734
5931247.411
5931247.894
5931247.275
5931246.972
5931248.197
5931247.917
5931247.690
5931247.461
5931247.302
5931244.076
5931243.665
5931245.319
5931260.870
5931262.802
5931263.244
5931266.439
5931266.750
5931265.169
5931248.920
5931247.612
5931247.339
5931254.043
5931254.371
5931253.827
Level
239.097
239.052
0.000
0.000
238.949
238.949
238.954
0.000
0.000
239.004
239.021
239.042
239.066
239.090
239.133
239.201
238.995
238.982
238.968
238.952
238.932
238.911
238.888
0.000
0.000
238.824
238.810
238.801
0.000
0.000
238.788
238.796
238.808
238.826
238.843
238.861
238.870
238.828
238.584
238.535
238.510
238.794
238.904
238.907
238.971
238.985
238.975
238.965
238.955
238.950
SETOUT
Point #
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
Easting
255410.695
255409.136
255406.316
255406.590
255404.277
255401.964
255401.437
255401.740
255404.028
255423.966
255424.249
255423.085
255422.255
255422.809
255426.512
255428.247
255429.981
255430.507
255430.221
255428.504
255426.786
Northing
5931253.000
5931252.675
5931253.463
5931252.145
5931251.664
5931251.182
5931251.510
5931252.053
5931252.758
5931257.195
5931255.823
5931255.581
5931256.129
5931256.955
5931257.722
5931258.084
5931258.447
5931258.126
5931257.581
5931256.986
5931256.391
Level
238.955
238.965
238.980
238.980
238.994
239.008
239.012
239.009
238.994
239.202
239.230
239.192
239.161
239.169
239.287
239.345
239.403
239.427
239.425
239.374
239.316
STATION DATA
Point #
909
910
911
920
921
922
Description
STN 8
STN 9
STN 10
PSM 221
PSM 222
PSM 1766
Easting
255432.321
255422.124
255320.001
255410.252
255512.605
255456.846
Northing
5931129.103
5931266.717
5931573.822
5931245.804
5931266.862
5931254.692
Level
240.193
238.675
242.231
238.582
240.699
240.798
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
-
21
SETOUT
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
-
22
COVER SHEET
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
WOOD STREET
LONG GULLY
GB4449
INTERSECTION UPGRADES
WEATHERALL STREET INTERSECTION
DECEMBER 2020
LOCALITY MAP
W
E
A
T
H
E
R
A
L
L
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
6
1
W
O
O
D
S
T
R
E
E
T
DOCUMENT CONTROL
SH
EE
T
No
.
SH
EE
T
DE
SC
.
11/07/19
14/04/20
01/12/20
DRAFT TENDER CONSTRUCTION
REVISION REVISION REVISION
1 - 13 NELSON STREET ROUNDABOUT PLANS A A A
14 - 21 DOWDING STREET INTERSECTION PLANS A A A
22 COVER SHEET A A A
23 GENERAL NOTES A A A
24 DEMOLITION PLAN A A A
25LAYOUT, FINISHES & ALIGNMENTS
A A A
26 SIGNAGE & LINEMARKING A A A
27 KERB & CHANNEL LONG SECTIONS A A A
28 LIGHTING UPGRADES A A A
29 SETOUT N/A N/A A
30 SPEED HUMP LOCATIONS A A A
W
E
A
T
H
E
R
A
L
L
S
T
R
E
E
T
2
B
W
E
A
T
H
E
R
A
L
L
S
T
R
E
E
T
6
2
W
O
O
D
S
T
R
E
E
T
5
9
W
O
O
D
S
T
R
E
E
T
PROJECT EXTENTS
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
-
23
GENERAL NOTES
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
IMPORTANT!
The location of underground services have been derived from
available information, however accuracy cannot be guaranteed.
All existing service information should therefore be treated as
indicative only, and service locations must be arranged prior to
commencement of any excavation. The contractor will be held
responsible for any damage caused to underground services.
SEAL: Type V Asphalt (10mm)
BASE: Class 1 FCR (20mm)
Place and compact in 2 even layers
Compact to a min. of 98% MMDD
(min CBR 80)
Existing material:
- See notes this page for all compaction and testing
requirements
Kerb Returns and straights - IDM SD100 - SM2
600
300110 190
275
40
Setout is to back of kerb
500
SM2 kerb is to have a
0.5m flat area behind
190
Splitter Islands - IDM SD100 - SM1
300
110 190
275
125
Setout is to back of kerb
150
Reinforced
concrete apron
VEGETATION PROTECTION NOTES
1. If fencing is required as a condition of the Planning Permit or as a result of the
pre-construction meeting, a three strand star picket and wire fence shall be constructed.
2. All trees and shrubs are to be retained unless otherwise shown or directed by the
Superintendent's Representative.
3. No tree or native vegetation is to be disturbed or removed without prior approval. Any
approved trees or vegetation removed as part of the works are not to be burnt onsite.
4. If tree roots are discovered during excavation works, works in the immediate area shall
cease until the Superintendent's Representative has inspected, and approved works to
proceed.
FILL NOTES
1. All earthworks and compaction are to be in accordance with VicRoad's Specification
Section 204.
2. All fill materials are to be approved by the Superintendent's Representative prior to being
imported onto the site, and unless noted otherwise, shall be a clean clay based material
free of vegetation matter or contaminants.
3. All filling is to comply with AS3798-1996 Appendix B, level 1 (or 2) as specified
4. The Contractor is responsible for ensuring that all imported fill material, including topsoil,
satisfies the description for clean fill material in EPA bulletin publication No. 448 (Sep
95) and subsequent revisions. The Contractor shall provide verification including test
certificates to the Superintendent's Representative.
ROAD CONSTRUCTION NOTES
1. All Works to be carried out in accordance with CoGB Standard Drawings, Specifications,
approved plans and to the satisfaction of the Superintendent's Representative.
2. These notes also refer to the latest version of the Infrastructure Design Manual (IDM) and
latest version of the IDM Standard Drawings.
3. The Project Manager is to be notified seven days prior to the commencement of Works
with a Pre-commencement meeting to be held between CoGB, the Consultant and the
Contractor. A site management plan is to be submitted prior to the commencement of
Works and prior to the onsite Pre-commencement meeting.
4. Prior to commencement of the Works, the Contractor shall provide the following:
- Source of quarry material
- N.A.T.A. approved test results for the F.C.R that is to be used
- If the source of the quarry material is changed during the course of the Works, then new
test results shall be provided.
5. Prior to commencement of Works on site, the Contractor must ensure that all matters
relating to the Occupational Health and Safety Act 1985, have been and will be complied
with.
6. On the commencement of construction, the Contractor must comply with the
recommendation of the Environment Protection Authority publication "Construction
Techniques for Sediment Pollution Control". Appropriate siltation control is to be
maintained throughout the construction and maintenance period of the Works.
7. The disposal site for spoil storage, and truck removal route, is to be submitted in writing
to, and approved by the Superintendent's Representative prior to the commencement of
Works.
8. Where Works are in the vicinity of existing services, these services are to be located and
exposed prior to commencement of the work. Relevant authorities are to be notified 7
days prior to the Works.
9. All dimensions are in metres unless noted otherwise.
10. All levels are to Australian Height Datum (AHD) unless noted otherwise.
11. All co-ordinates are to Map Grid of Australia (MGA) unless noted otherwise.
12. The Contractor must arrange the inspection of the Works with the Superintendent's
Representative as per the hold points in the Specifications, or as directed by the
Superintendent's Representative.
13. All redundant assets are to be removed and disposed off site unless noted otherwise.
14. All service conduit trenches under road pavements, under footpaths and under swales are
to be backfilled as per IDM SD310 unless noted otherwise. Compaction standards noted
in SD310 shall be achieved.
15. Blasting is not generally accepted.
16. All existing assets affected by the Works (i.e. signs, vehicle crossings, footpaths, kerb and
line marking) shall be reinstated by the Contractor before the completion of Works, to the
satisfaction of the Superintendent's Representative.
17. At the completion of all Works, all rubbish, debris and surplus spoil shall be removed and
the site shall be cleared to the satisfaction of the Superintendent's Representative.
18. The Contractor is to obtain a Building Permit for any structures, fences and for any
retaining walls over 1.0m in height.
19. Any infrastructure damage incurred during the Defects Liability Period noted on the
contract is the responsibility of the Contractor and is to be reinstated to the satisfaction of
the Superintendent's Representative.
20. All disturbed areas (eg. nature strips, batters, allotments and reserves) are to be
reinstated to a clean, tidy condition, top dressed with 75mm min. depth approved top soil,
and seeded with a CoGB approved blend or unless otherwise noted. Soil & seeded
treated areas must be satisfactorily established prior to the end of the Maintenance Period
otherwise further treatment is required by the Contractor.
21. Any exposed aggregate concrete works are to be achieved by sandblasting only. Washing
aggregate off with water is not permitted.
22. The Contractor shall notify the public of any impending road closures by providing
sufficient signage 2 weeks prior to construction commencing.
PAVEMENT NOTES
1. Construction of road pavements is to be in accordance with the requirements of VicRoad's
Standard Specifications for Roadworks (Section 304). Testing must be carried out by a N.A.T.A.
approved laboratory, or by calibrated nuclear densometer test to the relevant Australian
Standard.
2. Compaction tests are to be undertaken in the following locations:
- At
2
3
depth of the pavement
- At alternating sides of the road
- 1.0m in from the seal edge or lip of kerb
- At even spacings.
3. The number of compaction tests shall comply with the table below:
Location Number of Compaction tests
Court bowls 3
Intersections 2
Straights 1 per 500m2 (1/50m for 10.2m wide pvmt.)
4. Copies of the geotechnical results are to be submitted to the Superintendent's Representative.
5. Sub-base and base materials are to be at 85% optimum moisture content (OMC) during
compaction, and maintained at 85% OMC until proof rolling.
6. Typical Compaction levels required (unless noted otherwise):
Subgrade: To be compacted to 100% standard dry density ratio.
Subbase: Flexible pavements shall be compacted in accordance with Scale C in VicRoads table
304.082.
Compaction shall be to 98% of the maximum dry density ratio determined by the modified
compaction test.
Base: Flexible pavements shall be compacted in accordance with Scale C in VicRoads table
304.082.
Compaction shall be to 100% of the maximum dry density ratio determined by the modified
compaction test.
7. Proof rolling of the Subgrade, Sub base and Base must be undertaken as per Section 12.7.15 of
the IDM. Proof rolling will be at the expense of the contractor in accordance with AS3798 and the
requirements of section 173 and 204.12 of the VicRoad's Specification. The Superintendent's
Representative must be present during the proof rolling. The Subgrade must not deflect more
than 2mm vertically within 300mm of the test roller in isolated locations.
8. Identification and treatment of soft areas during proof rolling shall be dealt with as per Sections
12.7.13 and 12.7.14 of the IDM and as approved by the Superintendent's Representative.
SIGNAGE, GUIDE POSTS, LINEMARKING & RRPMS
1. All existing signage, linemarking guideposts and RRMPs within Works site are to be removed
as per the 'demolition plan'
2. All proposed Signage, linemarking, guideposts and RRPMs are to be installed as per the
'Linemarking and signage plan'
3. All signs to be installed shall be Class 1 high intensity type and comply with the requirements of
AS1743-2001.
4. All guideposts are to have delineators satisfying the requirements of AS1906.2 section 3.
FOOTPATH CONSTRUCTION NOTES
1. Any property storm water pipes located during works are to be plumbed to the nearest pit. Where this is not practical, seek approval
from superintendent to plumb to kerb or into nearest storm water pipe.
2. Footpath to be constructed to SD205 unless noted otherwise.
3. An SD210 expansion joint is to be constructed at any joins with existing footpath, existing driveways or bridges.
4. SD210 Expansion joints along any new sections of footpath are to be at a maximum separation of 14m centres as per SD205.
5. Tool joints are to be at 1.2m centres and constructed to SD210 unless noted otherwise.
6. Pedestrian crossings are to be constructed as per IDM SD192 and are to have the boxing inspected by the Superintendents
representative prior to pouring concrete.
7. All pedestrian crossings are to have ceramic tile TGSIs installed as per AS1428.4
GENERAL CONSTRUCTION NOTES
1. All kerb, footpath and pram crossing constructions shall have bedding/boxing inspected by the Superintendent's Representative prior to
pouring of concrete.
2. All driveway laybacks in kerb are to be as per IDM SD 120 unless noted otherwise
3. If property stormwater outlets (not already identified on plan) are located during construction, it is the Contractors responsibility to connect
them into council underground drainage or back of kerb (As per IDM SD140) to the approval of the Superintendent's Representative.
4. Renewal of gas and water property service conduits to be 100mmØPVC (sewer grade).
5. All sewer man-hole covers within the footpath alignment (wholly or partly) are to be renewed & adjusted to design finished levels unless
noted otherwise or directed by the Superintendent's Representative.
6. All redundant footpath, kerb and road seal to be saw cut and removed from site as per the 'demolition plan'.
7. All service pits are to be renewed and matched into design surface unless noted otherwise or directed by the Superintendent's
Representative.
DRAINAGE CONSTRUCTION NOTES
1. The Superintendent's Representative and Design Engineer must be notified if any any modifications to drainage design are
required due to unforseen circumstances identified during works onsite.
2. Any property storm water pipes located during Works are to be plumbed to the nearest pit. Where this is not practical, seek
approval from the Superintendent's Representative to connect stormwater into kerb or into the nearest storm water pipe.
3. All drainage pits are to be constructed as per the noted Standard Drawing.
4. Invert fall through pits is to be a min. of 30mm unless noted otherwise.
5. Concrete pit walls are to be sponge finished and floors are to be shaped for best hydraulic efficiency unless noted otherwise.
6. Pit lids are to be installed flush with the surrounding surface unless noted otherwise.
7. Where concrete box culverts (CBC) or Crown Units are specified, they are to be compliant to AS1597 and designed to the
latest revision of the shear design standard.
8. Pipe extensions are to be constructed by removing the remaining stub of the existing pipe to be extended, and then
connecting the new pipe at the socket.
9. All pipe backfill is to be constructed as per the noted Standard Drawing.
10. The location of any saw cuts in asphalt are to be kept the minimum required trench width until after the pipe is laid and
backfilled up to 300mm from surface. At this point, a further 150mm wide, 300mm deep section of asphalt/pavement is to be
sawcut and excavated so as to provide a longitudinal pavement join over the drainage trench. This also should ensure a
straight edge for re-asphalting. The top 300m depth of backfill should then be constructed accordingly.
11. At the completion of the Works, pipes are to be visually inspected via inspection pits to check for construction debris, including
crushed rock, soil and concrete over spill. Should a volume of debris be present enough to impede flows, pipe cleaning shall
be undertaken at the contractors expense.
12. Gas and water property services are generally not located during the design phase and therefore have not been shown on
plans. It is therefore the Contractors responsibility to consider these services when excavating and adjust or realign
accordingingly whilst causing minimal disruption to property owners.
13. Gas and Water property services encountered during construction are to be altered and reconnected to the appropriate
standard and to the satisfaction of the Superintendents Representative.
MINIMUM PAVEMENT REQUIREMENTS
KERB DETAILS
FOOTPATH DETAILS
STENCILED CONCRETE
LANDSCAPING DETAILS
1500
2.5
%
cro
ssfa
ll
125mm thick 25MPa concrete
slab with central SL72
IDM SD205
Bedding, 50mm thick layer
compacted CL3 FCR
5050
Varying widths
Bedding, 100mm thick layer
compacted CL3 FCR
- 150mm thick 32MPa concrete slab
- 1 layer SL82 placed 50mm from bottom
- Flagstone stencil pattern, Charcoal
color, clear seal
50
ROLL OUT GRASS
75
Loamy sand
Pull strin
g b
etw
een ke
rbs fo
r gra
de
Transverse Pavement Joins
300 300
existing pavement
Where design pavement meets
existing pavement, the design
layers are to be overlapped into the
existing pavement by 300mm as
shown
40
260
300
Dowel into kerb
with 200mm long
N10s at 500mm
cts. Pre-drill and
place dowels
100mm below top
of kerb
50
Kykuyu roll out grass sod
KERB & CHANNEL CONSTRUCTION NOTES
1. Where design kerb is to be matched into existing kerb of a different
profile, a 3m transition length is required. Over the transition length,
the kerb invert is to continue to fall in the direction of the existing kerb,
unless otherwise noted.
STN 8
RL 240.193
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
1:200
24
DEMOLITION PLAN
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
59 WOOD STREET
62 WOOD STREET
1/2A WEATHERALL STREET
2B WEATHERALL STREET
61 WOOD STREET
LEGEND
Concrete Kerb Removal Road Pavement RemovalSawcut AsphaltFootpath Removal
SERVICE ALTERATIONS
NO. TYPE ACTION
1
Drainage Extend Throat of existing DSEP 200mm to new kerb alignment.
2
Drainage Extend Throat of existing DSEP 250mm to new kerb alignment.
3
Drainage Remove Existing DSEP
4
Drainage Convert Existing DSEP to JP
5 Water
Replace Stop Valve Cover and raise to design pavement level. (+20mm)
6 Telstra
Raise Telstra lid level to match design naturestrip level. (+20mm)
7 Telstra
Lower Tesltra Lid level to match design footpath level. (-100mm)
8 Sewer
Replace Sewer Manhole Cover and lower to design footpath level (-100mm)
1
2
3
4
7
W
E
A
T
H
E
R
A
L
L
S
T
R
E
E
T
W
E
A
T
H
E
R
A
L
L
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
Linemarking Removal
5
6
8
STN 8
RL 240.193
C
H
0
.0
0
C
H
5
.0
0
C
H
1
0
.0
0
C
H
1
5
.
0
0
C
H
2
0
.
0
0
CH
25.0
0
C
H
3
0
.
0
0
C
H
3
2
.
8
1
C
H
0
.0
0
C
H
5
.0
0
C
H
1
0
.0
0
C
H
1
5
.
0
0
C
H
2
0
.
0
0
C
H
2
5
.0
0
C
H
3
0
.0
0
C
H
3
2
.8
9
C
H
0
.0
0
C
H
5
.0
0
C
H
1
0
.0
0
C
H
1
5
.0
0
C
H
2
0
.
0
0
C
H
2
5
.0
0
CH 30.00
C
H
3
5
.0
0
C
H
3
6
.1
7
C
H
0
.
0
0
C
H
5
.
0
0
C
H
1
0
.
0
0
CH 15.00
C
H
2
0
.
0
0
C
H
2
5
.
0
0
C
H
3
0
.0
0
C
H
3
4
.8
4
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
1:200
25
LAYOUT, FINISHES & ALIGNMENTS
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
LEGEND
Concrete Kerb
- IDM SD100 SM1 for Kerb islands
- IDM SD100 SM2 for all other kerb
- Pedestrian Laybacks COGB SD192
- Driveway Layback COGB SD191
Road Pavement
- 40mm Asphalt
- 230mm CL1 FCR
Concrete Footpath
- IDM SD205
Stenciled Concrete
- IDM SD205
- 150mm depth
Naturestrip Treatment
- Kykuyu Roll out turf
- 75mm topsoil
North-West Kerb
North-East Kerb
South-East Kerb
South-West Kerb
See Page 2 for notes on
matching design kerb into
the existing kerb profile.
59 WOOD STREET
62 WOOD STREET
1/2A WEATHERALL STREET
2B WEATHERALL STREET
61 WOOD STREET
W
E
A
T
H
E
R
A
L
L
S
T
R
E
E
T
W
E
A
T
H
E
R
A
L
L
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
Construct SEP (COGB SD590-A-D-G-R).
Connect 300Ø RCP and extend 225Ø
RCP to connect to new pit.
Construct SEP (COGB SD590-A-D-G-R).
Connect to converted JP by 300Ø RCP
at 1%.
Match to existing Concrete footpaths and
property gate.
STN 8
RL 240.193
3
.
5
0
3
.
5
0
3
.5
0
3
.5
0
3
.5
0
3
.5
0
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
1:200
26
SIGNAGE & LINEMARKING
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
SIGN ALTERATIONS
NO. TYPE ACTION
1
Give Way: R1 - 2A Install Facing Western Approach
2
Give Way: R1 - 2A Install Facing Eastern Approach
3
Keep Left: R2 - 3A Install Facing Western Approach
4
Keep Left: R2 - 3A Install on same pole as 1 Facing East
5
Keep Left: R2 - 3A Install on same pole as 2 Facing West
6
Keep Left: R2 - 3A Install Facing Eastern Approach
7
Existing Give Way
Retain
8
Existing Give Way
Retain
1
2
3
4
5
6
7
8
LEGEND
Linemarking
59 WOOD STREET
62 WOOD STREET
1/2A WEATHERALL STREET
2B WEATHERALL STREET
61 WOOD STREET
W
E
A
T
H
E
R
A
L
L
S
T
R
E
E
T
W
E
A
T
H
E
R
A
L
L
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
-
27
KERB & CHANNEL LONG SECTIONS
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
5.00
10.00
12.50
14.00
15.00
15.50
18.86
20.00
21.36
23.86
25.00
26.00
26.65
27.00
28.00
29.00
30.00
31.00
31.17
CHAINAGE
238.43
238.43
238.43
238.64
238.71
238.76
238.81
238.84
238.99
239.04
239.08
239.12
239.14
239.14
239.14
239.15
239.13
239.10
239.08
239.08
239.09
NS CL
238.43
238.62
238.71
238.77
238.81
238.83
238.98
239.03
239.07
239.12
239.13
239.14
239.15
239.14
239.13
239.11
239.09
239.09
239.09
DES CL
Crest
R.L. 235.50
I.P
. 238.430
3.71%
I.P
. 238.764
4.50%
3.00
I.P
. 239.096
1.00%
5.00
I.P
. 239.152
-2.08%
2.00
I.P
. 239.090
-0.30%
2.00
NORTH-EAST KERB LONGITUDINAL SECTION CH 5.000 To 31.172
SCALES: H 1:200 V 1:50 (A3)
5.00
10.00
11.00
11.01
12.00
12.78
15.00
15.28
17.78
20.00
25.00
27.89
CHAINAGE
239.21
239.21
239.21
239.19
239.19
239.19
239.19
239.20
239.19
239.22
239.44
239.68
240.24
240.54
240.54
240.54
NS CL
239.21
239.16
239.15
239.15
239.16
239.16
239.23
239.25
239.46
239.69
240.23
240.54
DES CL
Sag
R.L. 236.50
I.P
. 239.207
-1.02%
I.P
. 239.146
0.99%
2.00
I.P
. 239.188
10.72%
5.00
NORTH-WEST KERB LONGITUDINAL SECTION CH 5.000 To 27.894
SCALES: H 1:200 V 1:50 (A3)
5.00
8.47
10.00
13.47
14.74
15.00
18.47
20.00
20.50
23.00
25.00
25.50
29.84
CHAINAGE
238.44
238.44
238.44
238.58
238.62
238.68
238.69
238.69
238.64
238.61
238.60
238.54
238.49
238.47
238.35
NS CL
238.44
238.57
238.62
238.68
238.68
238.68
238.64
238.61
238.60
238.54
238.49
238.47
238.35
DES CL
Crest
R.L. 235.50
I.P
. 238.442
3.65%
I.P
. 238.751
-2.17%
10.00
I.P
. 238.544
-2.90%
5.00
SOUTH-EAST KERB LONGITUDINAL SECTION CH 5.000 To 29.835
SCALES: H 1:200 V 1:50 (A3)
5.00
10.00
13.71
15.00
16.21
18.71
20.00
20.50
22.00
23.50
24.50
25.00
26.00
27.50
27.81
CHAINAGE
240.03
240.03
240.03
239.54
239.15
239.03
238.92
238.85
238.83
238.82
238.79
238.75
238.71
238.69
238.65
238.62
238.62
238.62
238.62
NS CL
240.03
239.52
239.15
239.03
238.94
238.85
238.83
238.82
238.79
238.74
238.70
238.69
238.66
238.62
238.62
DES CL
R.L. 236.00
I.P
. 240.034
-10.19%
I.P
. 238.891
-1.62%
5.00
I.P
. 238.798
-3.74%
3.00
I.P
. 238.648
-1.61%
3.00
SOUTH-WEST KERB LONGITUDINAL SECTION CH 5.000 To 27.806
SCALES: H 1:200 V 1:50 (A3)
STN 8
RL 240.193
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
1:300
28
LIGHTING UPGRADES
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
Install Cat P (22W) Light on existing pole
Existing Cat P Light
59 WOOD STREET
62 WOOD STREET
1/2A WEATHERALL STREET
2B WEATHERALL STREET
61 WOOD STREET
W
E
A
T
H
E
R
A
L
L
S
T
R
E
E
T
W
E
A
T
H
E
R
A
L
L
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
W
O
O
D
S
T
R
E
E
T
STN 8
RL 240.193
SETOUT
Point #
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
Easting
255449.793
255449.333
255449.184
255449.040
255448.595
255447.659
255445.879
255445.576
255445.500
255443.442
255441.134
255440.605
255439.287
255437.945
255436.025
255435.596
255435.179
255434.733
255434.274
255427.899
255428.438
255428.983
255429.524
255430.060
255432.050
255432.591
255433.121
255433.451
255434.769
255435.690
255436.550
255437.246
255437.016
255436.713
255438.182
255438.138
255437.847
255437.413
255436.769
255435.981
255435.529
255445.956
255446.085
255445.776
255445.395
255445.643
255445.868
255446.055
255446.276
255448.046
Northing
5931106.747
5931107.925
5931109.181
5931110.369
5931111.481
5931113.206
5931113.604
5931115.073
5931115.824
5931116.966
5931117.434
5931116.836
5931116.121
5931117.020
5931116.624
5931116.515
5931116.367
5931116.210
5931116.096
5931125.000
5931125.078
5931125.097
5931125.116
5931125.196
5931125.606
5931125.738
5931125.909
5931126.874
5931127.590
5931127.464
5931128.391
5931129.445
5931130.163
5931131.632
5931132.701
5931134.083
5931135.435
5931136.426
5931137.296
5931138.421
5931139.718
5931142.383
5931140.903
5931139.451
5931137.745
5931136.015
5931135.346
5931134.851
5931134.370
5931133.970
Level
238.699
238.724
238.753
238.800
238.849
238.900
0.000
0.000
238.979
239.140
239.391
0.000
0.000
239.735
239.935
239.985
240.036
240.079
240.116
240.594
240.574
240.522
240.457
240.392
240.173
240.109
240.045
0.000
0.000
239.696
239.550
239.420
0.000
0.000
239.249
239.237
239.243
239.255
239.268
239.281
239.288
239.191
239.181
239.204
239.230
239.213
239.206
239.200
239.191
0.000
SETOUT
Point #
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
Easting
255448.350
255448.422
255449.750
255451.219
255451.870
255453.189
255454.684
255456.580
255457.742
255458.767
255459.822
255461.019
255466.534
255466.043
255465.547
255465.110
255464.678
255462.758
255461.213
255459.805
255459.776
255458.457
255457.669
255457.574
255457.974
255458.278
255456.627
255456.796
255457.546
255458.356
255459.439
255460.551
255461.385
255435.421
255436.107
255433.578
255431.050
255430.523
255430.824
255433.122
255438.070
255438.767
255440.539
255441.084
255440.257
255456.521
255457.209
255459.539
255461.869
255462.170
Northing
5931132.501
5931131.750
5931130.916
5931130.369
5931130.741
5931131.456
5931130.273
5931130.664
5931131.063
5931131.740
5931132.437
5931132.847
5931122.743
5931122.660
5931122.626
5931122.599
5931122.532
5931122.136
5931121.643
5931120.837
5931119.320
5931118.604
5931118.485
5931118.319
5931117.636
5931116.167
5931115.060
5931112.927
5931110.922
5931109.828
5931109.003
5931108.157
5931107.037
5931122.091
5931120.827
5931120.305
5931119.784
5931120.112
5931120.654
5931121.373
5931122.661
5931121.375
5931121.741
5931122.568
5931123.112
5931126.469
5931125.202
5931125.930
5931126.659
5931127.201
Level
0.000
239.078
239.002
238.926
0.000
0.000
238.773
238.701
238.649
238.598
238.557
238.495
238.432
238.444
238.456
238.471
238.485
238.542
238.591
238.637
0.000
0.000
238.715
238.719
0.000
0.000
238.768
238.758
238.717
238.672
238.617
238.572
238.494
239.985
239.943
240.220
240.497
240.566
240.498
240.242
239.694
239.652
239.458
239.369
239.456
238.845
238.837
238.784
238.732
238.722
SETOUT
Point #
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
Easting
255461.643
255459.082
255453.862
255454.560
255452.731
255451.905
255452.449
255439.859
255440.432
255437.794
255438.151
255442.431
255443.688
255442.714
255444.297
255460.152
255461.504
255460.897
255452.316
255451.444
255449.700
Northing
5931127.529
5931126.999
5931125.918
5931124.632
5931124.255
5931124.799
5931125.626
5931115.066
5931114.010
5931113.188
5931111.787
5931109.765
5931110.409
5931112.950
5931113.277
5931116.379
5931116.658
5931117.849
5931133.064
5931134.672
5931134.312
Level
238.732
238.788
238.904
238.896
238.936
238.954
238.936
239.548
239.487
239.873
239.862
239.504
239.457
239.226
239.048
238.737
238.768
238.721
238.904
238.938
239.042
STATION DATA
Point #
909
910
911
920
921
922
Description
STN 8
STN 9
STN 10
PSM 221
PSM 222
PSM 1766
Easting
255432.321
255422.124
255320.001
255410.252
255512.605
255456.846
Northing
5931129.103
5931266.717
5931573.822
5931245.804
5931266.862
5931254.692
Level
240.193
238.675
242.231
238.582
240.699
240.798
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
-
29
SETOUT
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
6
0
m
1
0
0
m
8
0
m
7
0
m
4
0
m
1
0
0
m
3.70
t (m)
h (mm)
t (m)0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8
h (mm)100 100 99 97 95 93 90 86 81 76 71 65 58 51 43 34 25 16 5
CITY OF GREATER BENDIGO
Survey
Scale:
Approved by
Design
Checked
GB4449
WOOD STREET
LONG GULLY
INTERSECTION UPGRADES
H. WHYTOCK
B. JANSSEN
A. SMITH
N. SARTORI
13/06/19
11/07/19
-
30
SPEED HUMP LOCATIONS
Revision :
File :
Original sheet size:
AMENDMENTS
Approved by DateRevision Description
CONSTRUCTION
ISSUED FOR
Plot Date:
BAYLEYPlotted By:
24/03/2020
Sheet: Reference:
OF 30
11/07/19
11/07/19
A
GB4449.dwg
A3
- - - -
H
O
L
D
S
W
O
R
T
H
R
O
A
D
M
C
G
O
W
A
N
S
T
R
E
E
T
W
E
A
T
H
E
R
A
L
L
S
T
R
E
E
T
D
O
W
D
IN
G
S
T
R
E
E
T
N
E
L
S
O
N
S
T
R
E
E
T
S
T
A
F
F
O
R
D
S
T
R
E
E
T
LEGEND
Speed Humps
- Layout/Signs: AS1742.13 Figure 3.2
- Linemarking: AS1742.13 Figure 4.3
- Profile: AS1742.13 Figure C1
Install W5-10 & W8-2 (20)
Install W5-10 & W8-2 (20)
Construct asphalt speed
hump 3.70m wide as per
Speed hump profile.
Piano Key Linemarking as
shown.
Speed Hump Detail
Speed Hump Profile
W5 - 10
W8 - 2 (20)
Scale: 1:100