W:MAC-PC EXCHANGEPetra Cliffswall graphics 8-0806 DD model · Title: W:MAC-PC EXCHANGEPetra...

5
SCALE: Copyright © 2018 Susan M. Coddaire Registered Architect, All Rights Reserved studio b www.studiobvt.com architecture 114 meadow lane dorset, vermont 802.318.1309 CLIENT: DATE: DESIGN PHASE: 1/2" = 1'-0" A2.0 A2.0 A2.0 A2.0 PERMIT DRAWINGS CHAREST ALPINISM LLC PETRA C LIFFS CLIMBING CENTER PETRA C LIFFS CLIMBING CENTER PETRA C LIFFS CLIMBING CENTER PETRA C LIFFS CLIMBING CENTER 75 BRIGGS STREET BURLINGTON, VERMONT 75 BRIGGS STREET BURLINGTON, VERMONT 75 BRIGGS STREET BURLINGTON, VERMONT 75 BRIGGS STREET BURLINGTON, VERMONT AUGUST 6, 2018 PERMIT DRAWINGS

Transcript of W:MAC-PC EXCHANGEPetra Cliffswall graphics 8-0806 DD model · Title: W:MAC-PC EXCHANGEPetra...

Page 1: W:MAC-PC EXCHANGEPetra Cliffswall graphics 8-0806 DD model · Title: W:MAC-PC EXCHANGEPetra Cliffswall graphics 8-0806 DD model.pdf Author: Architect Created Date: 8/6/2018 6:17:14

SCALE:

Copyright © 2018 Susan M. CoddaireRegistered Architect, All Rights Reserved

studio b

www.studiobvt.com

architecture114 meadow lanedorset, vermont802.318.1309

CLIENT:

DATE:

DESIGN PHASE:

1/2" = 1'-0"

A2.0A2.0A2.0A2.0

PERMITDRAWINGS

CHAREST ALPINISM LLC

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

75 B

RIG

GS

ST

RE

ET

B

UR

LIN

GT

ON

, VE

RM

ON

T75

BR

IGG

S S

TR

EE

T

BU

RL

ING

TO

N, V

ER

MO

NT

75 B

RIG

GS

ST

RE

ET

B

UR

LIN

GT

ON

, VE

RM

ON

T75

BR

IGG

S S

TR

EE

T

BU

RL

ING

TO

N, V

ER

MO

NT

AUGUST 6, 2018

PERMITDRAWINGS

Page 2: W:MAC-PC EXCHANGEPetra Cliffswall graphics 8-0806 DD model · Title: W:MAC-PC EXCHANGEPetra Cliffswall graphics 8-0806 DD model.pdf Author: Architect Created Date: 8/6/2018 6:17:14

1 GROUND FLOOR0"

1M MEZZ. FLOOR11' - 0"

AVG. GRADE-1' - 0"

MIDPOINT ROOF44' - 0"

2 TOP FLOOR25' - 0"

150 SQ. FT. SIGNAGEPER SECTION 7.2.1 :(ALLOWED: 200 MAX.)

PAINTED ART GRAPHIC,TONE-ON-TONE,WRAPPING CORNER

TYP. INSULATEDMETAL SIDINGPANEL TYPE 'A'

TYP: OPERABLEWINDOWS WHEREINDICATED

METAL PANEL TYPE 'C'TYP. @ CANTED WALLS

ENTRY CANOPY, WCEILING LIGHTS

STRUCTURALSTEEL SUPPORT

TYP.LOUVERED VENT

ROOF DECK BALCONY:ENCLOSED WITH 18" HGUARDRAIL ON 24" HPARAPET WALL

TYPICAL: FIXEDGLAZING @ MAINCONDITIONED SPACE

DISPLAYCASE

4 1 FT 1 1 FT 4 8 FT

1 0 0 LINEAR FT. STREET FRONTAGE

WOODSCREENING

METAL PANEL TYPE 'B' WIRE TRELLISSTRUCTURE

BIKES

SCALE:

Copyright © 2018 Susan M. CoddaireRegistered Architect, All Rights Reserved

studio b

www.studiobvt.com

architecture114 meadow lanedorset, vermont802.318.1309

CLIENT:

DATE:

DESIGN PHASE:

1/8" = 1'-0"

A2.1A2.1A2.1A2.1

EASTBUILDINGELEVATION

CHAREST ALPINISM LLC

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

75 B

RIG

GS

ST

RE

ET

B

UR

LIN

GT

ON

, VE

RM

ON

T75

BR

IGG

S S

TR

EE

T

BU

RL

ING

TO

N, V

ER

MO

NT

75 B

RIG

GS

ST

RE

ET

B

UR

LIN

GT

ON

, VE

RM

ON

T75

BR

IGG

S S

TR

EE

T

BU

RL

ING

TO

N, V

ER

MO

NT

AUGUST 6, 2018

PERMITDRAWINGS

1/8" = 1'-0"1

BRIGGS STREET ELEVATION

Page 3: W:MAC-PC EXCHANGEPetra Cliffswall graphics 8-0806 DD model · Title: W:MAC-PC EXCHANGEPetra Cliffswall graphics 8-0806 DD model.pdf Author: Architect Created Date: 8/6/2018 6:17:14

1 GROUND FLOOR0"

1M MEZZ. FLOOR11' - 0"

AVG. GRADE-1' - 0"

MIDPOINT ROOF44' - 0"

2 TOP FLOOR25' - 0"

WINDOW OVERLOBBY + LOUNGE

PAINTED ART GRAPHIC,TONE-ON-TONE,WRAPS CORNER

WOOD SCREEN@ TRASH, 6' H.HORIZ. SLATS, TYP.WALKWAY

LIGHTING @ CLG.ROOF CANOPY

POSSIBLE SOLAR PVARRAY ON LARGEROOF, T.B.D.

ROOF DECKOVER BUILDINGENTRY, BEYOND

ROOF CANOPYSTRUCTURE

TYP. EXTERIORLIGHT FIXTURE

CONC. PAD, TYP.@ EXT. DOORS

PAINTED ARTGRAPHICS, TYP.@ NORTH ELEV.

ROOF/CANOPYOVER DOOR

ROOF-MOUNTEDMECH. EQUIP.TYP. SIDING

PANEL TYPE 'A'

TO

MID

PO

INT

OF

RO

OF

45

' - 0

"

WIRE TRELLISSTRUCTURE

9' -

0"

17

' - 0

"

25

' - 0

"

TYP.

6' - 0"

TYP. SIDINGPANEL TYPE 'B'

TYP. SIDINGPANEL TYPE 'C'BEYOND

SCALE:

Copyright © 2018 Susan M. CoddaireRegistered Architect, All Rights Reserved

studio b

www.studiobvt.com

architecture114 meadow lanedorset, vermont802.318.1309

CLIENT:

DATE:

DESIGN PHASE:

1/8" = 1'-0"

A2.2A2.2A2.2A2.2

NORTHBUILDINGELEVATION

CHAREST ALPINISM LLC

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

75 B

RIG

GS

ST

RE

ET

B

UR

LIN

GT

ON

, VE

RM

ON

T75

BR

IGG

S S

TR

EE

T

BU

RL

ING

TO

N, V

ER

MO

NT

75 B

RIG

GS

ST

RE

ET

B

UR

LIN

GT

ON

, VE

RM

ON

T75

BR

IGG

S S

TR

EE

T

BU

RL

ING

TO

N, V

ER

MO

NT

AUGUST 6, 2018

PERMITDRAWINGS

1/8" = 1'-0"1

NORTH FACING ELEVATION

Page 4: W:MAC-PC EXCHANGEPetra Cliffswall graphics 8-0806 DD model · Title: W:MAC-PC EXCHANGEPetra Cliffswall graphics 8-0806 DD model.pdf Author: Architect Created Date: 8/6/2018 6:17:14

1 GROUND FLOOR0"

1M MEZZ. FLOOR11' - 0"

AVG. GRADE-1' - 0"

MIDPOINT ROOF44' - 0"

2 TOP FLOOR25' - 0"

OVERHEAD DOORWITH GLASS LITES

MEMBRANEROOF, TYP.

EXIT DOOR

INDICATESOPERABLEWINDOW

TYP. EXTERIORLIGHT FIXTURE

TYP. EXTERIORLIGHT FIXTURE

'ACTIVE ROOF TOP'ROOF DECK

LOUVEREDVENT, TYP.

ROOFCANOPY

ROOF-MOUNTEDMECH. EQUIP. WOOD SCREEN

TYP. WIRETRELLISSTRUCTURE

SIDINGTRANSITION

INSULATED METALPANEL TYPE 'B'

INSULATEDMETAL PANELTYPE 'A'

INSULATED METALPANEL TYPE 'C'

SCALE:

Copyright © 2018 Susan M. CoddaireRegistered Architect, All Rights Reserved

studio b

www.studiobvt.com

architecture114 meadow lanedorset, vermont802.318.1309

CLIENT:

DATE:

DESIGN PHASE:

1/8" = 1'-0"

A2.3A2.3A2.3A2.3

WESTBUILDINGELEVATION

CHAREST ALPINISM LLC

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

75 B

RIG

GS

ST

RE

ET

B

UR

LIN

GT

ON

, VE

RM

ON

T75

BR

IGG

S S

TR

EE

T

BU

RL

ING

TO

N, V

ER

MO

NT

75 B

RIG

GS

ST

RE

ET

B

UR

LIN

GT

ON

, VE

RM

ON

T75

BR

IGG

S S

TR

EE

T

BU

RL

ING

TO

N, V

ER

MO

NT

AUGUST 6, 2018

PERMITDRAWINGS

1/8" = 1'-0"1

WEST FACING ELEVATION

Page 5: W:MAC-PC EXCHANGEPetra Cliffswall graphics 8-0806 DD model · Title: W:MAC-PC EXCHANGEPetra Cliffswall graphics 8-0806 DD model.pdf Author: Architect Created Date: 8/6/2018 6:17:14

1 GROUND FLOOR0"

1M MEZZ. FLOOR11' - 0"

AVG. GRADE-1' - 0"

MIDPOINT ROOF44' - 0"

2 TOP FLOOR25' - 0"

18" GUARDRAIL

PARAPET TO 24" H

ENTRYCANOPY

WOODCEILINGFINISH

TYP. CLADDING: INSULATEDMETAL PANEL SYSTEM;

PROVIDE SYSTEMTO CONTROLSNOW SLIDING

WOOD SCREEN

50 SQ. FT. SIGNAGE;PER SECTION 7.2.1 :(ALLOWED: 200 MAX.)

OPERABLEWINDOWSWHEREINDICATED

TYP:METAL PANELFINISH @ BOTT.ROOF OVERHANG

ALLOWABLEBUILDINGHEIGHT PERE-LM ZONE;

TYP. EXTERIORLIGHT FIXTURE

WOOD SCREEN,@ TRASH, 6' HIGH

TYP. EXTERIORLIGHT FIXTURE

45

' - 0

"

ROOF-MOUNTEDMECH. EQUIP.

SCALE:

Copyright © 2018 Susan M. CoddaireRegistered Architect, All Rights Reserved

studio b

www.studiobvt.com

architecture114 meadow lanedorset, vermont802.318.1309

CLIENT:

DATE:

DESIGN PHASE:

1/8" = 1'-0"

A2.4A2.4A2.4A2.4

SOUTHBUILDINGELEVATION

CHAREST ALPINISM LLC

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

PE

TR

A C

LIF

FS

CL

IMB

ING

CE

NT

ER

75 B

RIG

GS

ST

RE

ET

B

UR

LIN

GT

ON

, VE

RM

ON

T75

BR

IGG

S S

TR

EE

T

BU

RL

ING

TO

N, V

ER

MO

NT

75 B

RIG

GS

ST

RE

ET

B

UR

LIN

GT

ON

, VE

RM

ON

T75

BR

IGG

S S

TR

EE

T

BU

RL

ING

TO

N, V

ER

MO

NT

AUGUST 6, 2018

PERMITDRAWINGS

1/8" = 1'-0"1

SOUTH FACING ELEVATION