WLTP - Validation Phase 2 - Analysis of results (excerpt from the VTF terms of reference)

1
Brussels, 22 September 2009 – 101st MVEG 1 WLTP - Validation Phase 2 - Analysis of results (excerpt from the VTF terms of reference) 8. Data format and analysis of results The format of input data for test execution and the data format of the test results will be described in the Technical Guidelines. The results will be uploaded on JRC ftp server by each participating lab. Instructions on how to access and upload/download data to JRC ftp server will be provided in the Technical Guidelines. A consistency and plausibility check will be performed as a first step of the analysis (Japan/EU). The analysis of the results will be carried out by each DTP subgroup, and DHC if necessary, under the coordination of the VTF. The outcome of this analysis will be put together by VTF and presented at a DTP/DHC combined working group with an initial assessment of the acceptability of the new test procedure. The WLTP steering committee will review this initial assessment before formal submission to GRPE for approval.

description

WLTP - Validation Phase 2 - Analysis of results (excerpt from the VTF terms of reference) 8. Data format and analysis of results The format of input data for test execution and the data format of the test results will be described in the Technical Guidelines. - PowerPoint PPT Presentation

Transcript of WLTP - Validation Phase 2 - Analysis of results (excerpt from the VTF terms of reference)

Page 1: WLTP - Validation Phase 2 -  Analysis of results  (excerpt from the VTF terms of reference)

Brussels, 22 September 2009 – 101st MVEG 1

WLTP - Validation Phase 2 - Analysis of results (excerpt from the VTF terms of reference)

8. Data format and analysis of results • The format of input data for test execution and the data format of the test results will be

described in the Technical Guidelines.• The results will be uploaded on JRC ftp server by each participating lab. Instructions on how to

access and upload/download data to JRC ftp server will be provided in the Technical Guidelines.

• A consistency and plausibility check will be performed as a first step of the analysis (Japan/EU).

• The analysis of the results will be carried out by each DTP subgroup, and DHC if necessary, under the coordination of the VTF.

• The outcome of this analysis will be put together by VTF and presented at a DTP/DHC combined working group with an initial assessment of the acceptability of the new test procedure.

• The WLTP steering committee will review this initial assessment before formal submission to GRPE for approval.