With the contribution of the LIFE financial instrument of the European Community IWA, 14/06/2011,...

7
With the contribution of the LIFE financial instrument of the European Community IWA, 14/06/2011, Granada PROJECT LIFE+ ES-AG_UAS LIE09 ENVS/ ES / 0456 “Sustainable water management at regional scale through Airborne Remote Sensing based on Unmanned Aerial Systems (UAS)” AG_UAS

Transcript of With the contribution of the LIFE financial instrument of the European Community IWA, 14/06/2011,...

Page 1: With the contribution of the LIFE financial instrument of the European Community IWA, 14/06/2011, Granada PROJECT LIFE+ ES-AG_UAS LIE09 ENVS/ ES / 0456.

With the contribution of the LIFE financial instrument of the European Community

IWA, 14/06/2011, Granada

PROJECTLIFE+ ES-AG_UAS

LIE09 ENVS/ ES / 0456

“Sustainable water management at regional scalethrough Airborne Remote Sensing based on

Unmanned Aerial Systems (UAS)”AG_UAS

Page 2: With the contribution of the LIFE financial instrument of the European Community IWA, 14/06/2011, Granada PROJECT LIFE+ ES-AG_UAS LIE09 ENVS/ ES / 0456.

Project title and acronym: “Sustainable water management at regional scale through Airborne Remote Sensing based on Unmanned Aerial Systems (UAS)”- AG_UAS

Objective: To demonstrate the technical and economic feasibility of a new Remote Sensing technology based on UAS (unmanned aerial systems) to improve water management, contributing to its sustainable use on a regional scale.

IWA, 14/06/2011, Granada

With the contribution of the LIFE financial instrument of the European Community

Page 3: With the contribution of the LIFE financial instrument of the European Community IWA, 14/06/2011, Granada PROJECT LIFE+ ES-AG_UAS LIE09 ENVS/ ES / 0456.

What does it propose?

A developed technology (UAS-VTOL)

A problem that exists with respect to the use of water: Resource utilization (efficiency of hydraulic infrastructures, irrigation optimization, etc.) Safety of mine exploitation storage facilities.Resource protection (dumping, thermal pollution, etc.) Efficient control of the water status. Water resource inventory.

Spatial information(images)

+ =

IWA, 14/06/2011, Granada

With the contribution of the LIFE financial instrument of the European Community

Page 4: With the contribution of the LIFE financial instrument of the European Community IWA, 14/06/2011, Granada PROJECT LIFE+ ES-AG_UAS LIE09 ENVS/ ES / 0456.

Expected results:

1.1 demonstrator prototype instrumented with a high resolution / gyro stabilized thermal infrared (IR) camera (8-12 µm), with maximum take off and landing weight (MTOW) of 75 kg and 1,5 h endurance

1 demonstrator prototype instrumented with a multispectral camera ( 6 bands) with MTOW of 20 Kg and 30 min endurance

1.Spectral, geo-referenced, imaging information of the environmental applications objective for interpretation and analysis in order to evaluate technical feasibility

2.Real operating costs information about imaging data collection and interpretation in order to evaluate economic feasibility

3.Establishment of contacts and enough audience at national and European level of public bodies related to water management as potential futures customers

4.Establishment of the best operative procedures to carry out the proposed environmental missions including, among other, the suitable atmospheric conditions and time during day for maximum detectivity, flight conditions, the on board instrumentation and the operating parameters

IWA, 14/06/2011, Granada

With the contribution of the LIFE financial instrument of the European Community

Page 5: With the contribution of the LIFE financial instrument of the European Community IWA, 14/06/2011, Granada PROJECT LIFE+ ES-AG_UAS LIE09 ENVS/ ES / 0456.

Actions:

ENVIRONMENTALMISSIONS DEFINITION

ANDDEMONSTRATION PLAN

ENVIRONMENTALMISSIONS DEFINITION

ANDDEMONSTRATION PLAN

ACTION 1

GDN

WATER PROTOTYPESCONSTRUCCTIONWATER PROTOTYPES

CONSTRUCCTION

ACTION 2

AIN

EXECUTION OFDEMONSTRATION PLAN EXECUTION OF

DEMONSTRATION PLAN

P6RESULT S ANALYSIS

AND REPORTINGRESULT S ANALYSIS AND REPORTING

ACTION 4

PROJECT MANAGEMENT / MONITORING/ AUDITPROJECT MANAGEMENT / MONITORING/ AUDITAIN

COMMUNICATION AND DISSEMINATIONCOMMUNICATION AND DISSEMINATION CRANA

AIN

ACTION 3

AIN

ACTION 6

ACTIONS 5,7,8

Environmental problem knowledgeAvailable TechnologyData and Equipment

Action 9: After LIFE communicationEXPLOITATION

IWA, 14/06/2011, Granada

With the contribution of the LIFE financial instrument of the European Community

Page 6: With the contribution of the LIFE financial instrument of the European Community IWA, 14/06/2011, Granada PROJECT LIFE+ ES-AG_UAS LIE09 ENVS/ ES / 0456.

Communication and dissemination:

18 communication actions from 2010 to 2013, for example:

• Preparation and dissemination of a project brochure

• Presentation of the project in conferences or events in a national level

• Creation of a project Web : www.lifeaguas.es

• Development and dissemination of an informative DVD of the project

• Organization of workshops to present the project results in Europe

• Organization of a European seminar on technologies relating to efficient water management

• Developing and dissemination of an informative document about project results

• Presentation of project results

IWA, 14/06/2011, Granada

With the contribution of the LIFE financial instrument of the European Community

Page 7: With the contribution of the LIFE financial instrument of the European Community IWA, 14/06/2011, Granada PROJECT LIFE+ ES-AG_UAS LIE09 ENVS/ ES / 0456.

Budget: Total 2.384.688 € - 50% UE Co-funding

Duration: Start 01/10/2010 – End 30/09/2013

Beneficiary:

– Coordinating beneficiary: ASOCIACIÓN DE LA INDUSTRIA NAVARRA

– Associated beneficiary: GOBIERNO DE NAVARRA, RIEGOS DE NAVARRA, CENTRO DE RECURSOS AMBIENALES DE NAVARRA, NAVARRA DE MEDIO AMBIENTE INDUSTRIAL

IWA, 14/06/2011, Granada