With over 50 years’
experience in the
nuclear industry.
Capula supports the full life cycle
of nuclear energy from new build
to waste management and
decommissioning.
Capula’s decommissioning and waste management systems safely control the processing and storage of nuclear waste. Our operational solutions are used for new fuel production and enable nuclear generation to continue as a viable option in the UK’s energy strategy.
We apply our nuclear and automation expertise to the defence sector through a wide range of mission critical programmes. Our systems and solutions help our clients optimise their research, design, manufac-turing and maintenance operations whilst enabling regulatory compliance with environmental and safety standards.
With over 50 years of excellence in nuclear technologies
![Page 2: With over 50 years of excellence in nuclear technologies€¦ · BAE SMITE Facility Control and Safety System upgrade, design of new control room and local control for pumps 2016](https://reader034.fdocuments.us/reader034/viewer/2022043023/5f3e8e0b1ac6682a2e5a597f/html5/thumbnails/2.jpg)
Test order received for a small IT Director based system designed for Dounreay power station
First BNFL order
1974
1978
Hardware for a range of industrial computer systems, designed for
simple and complex control and monitoring
applications
Instematic Series 200
Instematic plant controller elected preffered solution for Fuel Handling Plant (FHP) and SIXEP projects at Sellafield
Instematic Success
Early 80’s
Early 80’s
Awarded for development contract for monitoring centrifuge speed and power. Heralded the supply of considerable number of systems to Capenhurst
Capenhurst contract
Hardware for a range of industrial
computer systems, designed for simple
and complex control and monitoring
applications
Instematic Series 300
1984
A series of industrialised microcomputers based on the Digital Equiptment Corporation LSI-II family of processors
Industrial II
Delivered a PLC based system for the Effluent Transfer Facility (ETF)
at Sellafield. Marked our first venture into
systems integration with our Instematic becoming
obsolete
Systems Integration
1987
Microprocessor-based unit with dual role of data acquisition and intelligent control of plant
DS500 Series
1987Developed I-Range - a modular industrial data acquisition and control subsystem providing intelligent bulk I/O handling
I-Range
1988
More than 100 PLC systems delivered on
Springfields New Oxide Fuel Complex project
as part of an integrated MIS, SCADA and PLC
solution
Springfields NOFC
1992-97
Control systems delivered for the pond handler and several other plant areas within the Receipt and Storage Facility
Thorp contracts
1985-86
1985Late 80’s
First large-scale contract awarded by the BNFL at Risley for the control solution on Encapsulation Product Store 2
EPS2
1994
Replacement I/O suite to support the station’s Data Process System
Hinkley Point B
Capula provides continuous 24x7x365
support – long term support for the DPS
and DCS system
Hinkley Point B Power Station
1996
Bespoke C++ solution and fibre-optic network infrastructure for Centrifuge Monitoring system at Capenhurst
URENCO
1998
Contracted to develop a standard PLC/SCADA
approach. Became known as the ILW standards and
used as the basis for a suite of plants nearing
approval
Sellafield Drypac Plant
Centralised control system, new process valves and remote control network for Sellafield’s ITF plant
Inactive Tank Farm
2000
2000
Key role in the developing of code, design and implementation of a new control system at the Advanced Mixed Waste Treatment Project in Idaho, US
Advanced Mixed Waste Treatment
WTCControl solution for
Sellafield’s Waste Treatment Complex
2001
Bradwell DefuelingUpgrade of reactor
charge machine C&I and a defueling verification
system at Bradwell
2001
Turnkey control system for Sellafield’s Residue Export Facility (REF)
REF
2003
MASWEPControl system solution
for Sellafield’s Medium Active Solids Waste Plant
(MASWEP)
2004
2004
Control system replacement
at Sellafield’s Site Ion Exchange Effluent Plant
(SIXEP)
SIXEP Refurbishment
EDF Eggborough Power Station
FGD PLC Upgrade
2005Control solution for
Sellafield’s Evaporator D project
Evaporator D
2007
2006
SPRSControl solution for Sellafield Product and Residue Store (SPRS)
Oldbury DefuelingDefueling verification system at Oldbury power station
2006
Replacement of a Radiological Surveillance Systemat Sellafield
Kent 90 RSS Replacement
2006
Virtual IT Infrastructure solution for Sellafield’s Windscale reactor
IT Virtualisation
2008
First AWE project
2008
EDF Heysham Power Station 1Ongoing PI support.Support of the PI-SCOOP Interface together with the Kepware OPC server
2008
Control system for the Encapsulated Product Store 3 at Sellafield
EPS3
2008
2008
EDF Sizewell BPower StationPI Support
Fast Data CaptureHigh speed data system at Dungeness based on
high integrity PLC’s input to OSIsoft PI historian
2009 Sellafield SADSIT project for personnel dosimetry. A collection, management and reporting system
2009
2009
EDF Dungeness B Power StationPI Support
Control System Refurbishment
This major refurbishment project ran across both
sites and involved the upgrade of the AWE site
infrastructure services
2010
Tails Management Facility (TMF)
Design, build, integration, test, installation and
commissioning of a 25 PLC dual redundant SCADA and
the integration of associated systems on this new build
project at URENCO
2010
EDF Eggborough Power StationPI Support
2010
Sellafield IT Support
Contracted by ATOS to provide IT support at
Sellafield
2013
VIT Line ObsolescenceReplacement of obsolete PLCs with modern Schneider PLCs
2014
URENCOPlant survey works
2014
2014
EDS Assay SuiteNetworked survey and upgrade for Sellafield
2014
HLWPNetwork obsolescence survey and report for Sellafield
2014
Thorp R&SFront End design support for obsolete Instematic equipment
ITER NBRHSPart of the European Remote handling Alliance lead by AMEC Foster Wheeler
2015
BEPPS/DIFNew control system for Box Encapsulation Plant Product Store and Direct Import facility at Sellafield
2015
BEP CONCISECONCISE support for Box Encapsulation Plan (BEP) project
2015
2015
EDF Hartlepool Power StationBlowdown Route Automatic Control Systems (BRACS)
AWEDiagnostic and
Exploder C&I Integrator Work
package for EPURE project
2016
BAE SMITEFacility Control and
Safety System upgrade, design of new control
room and local control for pumps
2016
2016
Sellafield BEP DTDesign, Manufacture
and Testing of an integrated Plant Control System
comprising of multiple PLCs, SCADA and Material Tracking
System
URENCOCyber security for
TMF system
2017
Sellafield SPMSDevelopment, Manufacture, installation of Site Perimeter
Monitoring System
2017
SellafieldDesign, Build, and Test
of Cyber hardened secure storage
environment
2017
2017
Cavendish NuclearBerkeley R3 Plant
Control System
AWEDesign, build and test of a replacement Substation Telemetry System
2018
Sellafield BEP Main Grout PlantFront end design, manufacture and testing of Grout Plant control system comprising of CONCISE production, PLC and SCADA System
2018
EDF Heysham 2 and Torness Power StationAdditional ISI Interstitial Manipulator Control System Replacement
2018
EDF NGL FleetFleet-wide PI Historian Training OSIsoft PI Onsite Training at various EDF sites across the NGL fleet
2018
AWEPhase 2
Manufacture, Test and Commissioning of
Safety, Non Safety and Security systems (SIS)
2018
SellafieldUpgrade of existing
legacy security systems to enable
migration to a purpose built
data centre
2018
Cyber SecurityCapula gains independent
Cyber security Assessor Status
2018
EDF Dungeness B Power Station
On-site survey, design, procurement, manufacture,
testing and delivery of a Moisture in Reactor Gas
(MIRG) system
2018
EDF Hartlepool Power Station
Design, manufacture, supply, installation, testing and
commissioning of a refurbished ‘modern day’ De-Superheater
Control Station
2018
EDF Energy Services acquires Imtech
2017
EDF Heysham 2 and Torness
Power StationISI Interstitial
Manipulator Control System
Replacement
2017
EDF NGL FleetFleet-wide Alarm Panels Design of
hardware, manufacture, configure and test of 90 off panels to meet EDF
Specifications to be installed across the EDF Energy NGL Fleet
2017
EDF Heysham 2 Power StationControl System Modifications for Effluent Treatment, Make Up Water Treatment and
Condensate Polishing Plants
2017
HALESReplacement of
obsolete control system with modern
Rockwell solution
2011
AWEDesign, build and
supply of 8 Remote Control Stations
2011
Hinkley Point B Power Station
Supply, Installation and Commissioning of
Condensate Polishing and Regeneration plant of PLC
and HMI system
2011Building
Management SystemSafety Instrumented
Systems and Building Management System
on a new build project at AWE
2013
Sellafield SEP FOBIT project for an electronic
fault observation system to replace the original
paper-based system
2012
AWEDetailed design of the
Safety Instrumented Systems (SIS) on a large
scale construction
2012
AWE Saftey AwardRecognised by AWE for
outstanding health, safety and environmental performance for
onsite activities
2012
EDF HartlepoolPower Station
Hybrid Electronic/analogue Temperature sensing
System (HEATS) – Provision of a SIL 1 2003
Safety System
2012
EDF Heysham 1Power Station
Hybrid Electronic/analogue Temperature sensing
System (HEATS) – Provision of a SIL 1 2003
Safety System
20121995-Present
EDF Eggborough Power StationOngoing APMS support - reliable support of complex SCADA infrastructure
1995-2016
![Page 3: With over 50 years of excellence in nuclear technologies€¦ · BAE SMITE Facility Control and Safety System upgrade, design of new control room and local control for pumps 2016](https://reader034.fdocuments.us/reader034/viewer/2022043023/5f3e8e0b1ac6682a2e5a597f/html5/thumbnails/3.jpg)
Head Office Orion House (HQ) Stone Business Park Stone Staffordshire ST15 0LT
+44 (0)1785 827000 | www.capula.co.uk © 2019 Capula Limited | Registered in England No. 953504 Registered Office: Orion House Stone
Follow us on LinkedIn and Twitter
Orion House (HQ)Stone Business ParkStoneStaffordshire, ST15 OLTT: +44 (0) 1785 827000
1414 Charlton CourtGloucester Business ParkGloucesterGloucestershire, GL3 4AET: +44 (0) 1452 650000
Kinniside SuiteInnovation CentreWestlakes Science & Technology ParkWhitehavenCumbria, CA24 3TPT: +44 (0) 1946 517450
Beacon HouseStone Business ParkStoneStaffordshire, ST15 ONNT: +44 (0) 1785 827000
Vulcan HouseCalleva ParkAldermastonReading, RG7 8PAT: +44 (0) 118 981 0673
Systems HouseRosebankThe Alba CampusLivingstonWest Lothian Edinburgh, EH54 7EGT: +44 (0) 1785 827000
Our nuclear capabilities