With Market Reform Office Market Reform Forum April 2009 Christopher Croft, MRO Roger Oldham, HSBC...

9
With Market Reform Office Market Reform Forum April 2009 Christopher Croft, MRO Roger Oldham, HSBC John Muir, Willis

Transcript of With Market Reform Office Market Reform Forum April 2009 Christopher Croft, MRO Roger Oldham, HSBC...

Page 1: With Market Reform Office Market Reform Forum April 2009 Christopher Croft, MRO Roger Oldham, HSBC John Muir, Willis.

With

Market Reform Office

Market Reform ForumApril 2009

Christopher Croft, MRORoger Oldham, HSBCJohn Muir, Willis

Page 2: With Market Reform Office Market Reform Forum April 2009 Christopher Croft, MRO Roger Oldham, HSBC John Muir, Willis.

Mark

et

Refo

rm 2

00

9Market Reform

OfficeAgenda

• Market reform update

• London market - setting the pace

• Endorsements update

Page 3: With Market Reform Office Market Reform Forum April 2009 Christopher Croft, MRO Roger Oldham, HSBC John Muir, Willis.

Mark

et

Refo

rm 2

00

9Market Reform

OfficeFWWS

• MRG agreed the following assumptions for the finish what we have started work

– That the current systems will be in place for at least the next four years.

– That any work to these systems that delivers benefit within that timescale can be considered as part of the finish what we have started work.

– That the aim of the finish what we have started work is to get to as near as practicable 100% usage, of ECF in particular.

– That if further funding is required to deliver this work, it will be sought.

Page 4: With Market Reform Office Market Reform Forum April 2009 Christopher Croft, MRO Roger Oldham, HSBC John Muir, Willis.

Mark

et

Refo

rm 2

00

9Market Reform

OfficeFWWS next steps

• Approvals

– IMR Security model

– Design study for co-lead binders

• Forward approval agenda

– April: ECF2 (claims workflow triggers/service; document viewer; claims database)

– May: eAccounting and outcome of co-lead binders study

Page 5: With Market Reform Office Market Reform Forum April 2009 Christopher Croft, MRO Roger Oldham, HSBC John Muir, Willis.

Mark

et

Refo

rm 2

00

9Market Reform

OfficeeMRCE

• MRG target – 3,000 in April

• Bi-lateral arrangements – protocol and sample on marketreform.co.uk

• John Muir to provide more detail on this approach

Page 6: With Market Reform Office Market Reform Forum April 2009 Christopher Croft, MRO Roger Oldham, HSBC John Muir, Willis.

Mark

et

Refo

rm 2

00

9Market Reform

OfficeMRC – version 1.3?

• Cross market group progressing

• Tax guidance central

• If there is a new version, timescales will be similar to previous years

Page 7: With Market Reform Office Market Reform Forum April 2009 Christopher Croft, MRO Roger Oldham, HSBC John Muir, Willis.

Mark

et

Refo

rm 2

00

9Market Reform

OfficeE-Policies

Electronic policy submissions

0

100

200

300

400

500

02/03/2009 09/03/2009 16/03/2009 23/03/2009 30/03/2009 06/04/2009

60%

70%

80%

90%

100%

Total policies signed Electronic submissions

Electronic submission proportion

Page 8: With Market Reform Office Market Reform Forum April 2009 Christopher Croft, MRO Roger Oldham, HSBC John Muir, Willis.

Mark

et

Refo

rm 2

00

9Market Reform

OfficeLloyd’s Exchange

• Technical connectivity testing with pilot participants to begin on 1st May with business testing from 1st June.

• So far 35 Managing Agents; 6 company market insurers; and 14 brokers have expressed interest in participating in the first three phases of the pilot

• A number of suppliers/service providers have completed some preliminary technical testing these include Perspective Technologies, Ri3K, Room, The Insurance Workplace (TIW), Trace, Trisystems, Web Connectivity.

• Initial use of the Lloyd's Exchange to cover placing; endorsements and signed lines.

Page 9: With Market Reform Office Market Reform Forum April 2009 Christopher Croft, MRO Roger Oldham, HSBC John Muir, Willis.

Mark

et

Refo

rm 2

00

9Market Reform

Office

Questions?