Wisconsin Department of Transportation Metro District Tabletop Exercise

39
Wisconsin Department of Transportation Metro District Tabletop Exercise

description

Wisconsin Department of Transportation Metro District Tabletop Exercise. Restroom Locations Working Lunch Silence all Cell Phones Staff as Hosts. Before We Begin. Establish and Maintain an EOC Demobilization of Long Term Operation Detours. Exercise Objectives. - PowerPoint PPT Presentation

Transcript of Wisconsin Department of Transportation Metro District Tabletop Exercise

Page 1: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Wisconsin Department of Transportation Metro District

Tabletop Exercise

Page 2: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 2

Before We Begin

Restroom Locations

Working Lunch

Silence all Cell Phones

Staff as Hosts

Page 3: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 3

Exercise Objectives

Establish and Maintain an EOC

Demobilization of Long Term Operation

Detours

Page 4: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 4

Exercise Rules / Assumptions

Capabilities, Resources, & Equipment At the time of the response

Wi/DOT Response Only

Exercise Events = Real World Events

No “Gotchas”

Page 5: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 5

Roles and Responsibilities

Participant – “Player” in the exercise

Evaluator – Monitors achievement of objectives

Facilitator – Controls flow of play and moderates discussion

Page 6: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 6

Seating

Command Staff

(On Scene IC)

Planning

Section

Operations

Section

Logistics /Finance &

Administration

Page 7: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 7

Exercise Information

Brief

Break out / Players

Plenum

Situation Manual (SitMan)

Page 8: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 8

Situation ManualScenario

Timeline

ICS Forms

Detour Map

Page 9: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 9

AgendaWelcome and Introductions....8:30 am

Begin Exercise………………..8:45 am

Lunch…………………………11:30 pm

End Exercise………...………..2:00 pm

Closing Remarks…….……..…2:15 pm

Hot Wash………..…………….2:30 pm

Page 10: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 10

Module 1

Activation and First Operational Period

Aug. 1, 6:05 pm –

Aug. 2, 6:00 am

Page 11: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 11

Previous Bridge Collapses

1983 – Mianis River Bridge

Page 12: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 12

Previous Bridge Collapses

1980 – Sunshine Skyway Bridge

Page 13: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 13

Previous Bridge Collapses

1967 – Silver Bridge

Page 14: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 14

August 1, 2007 – I-35

Page 15: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 15

On-Scene

Milwaukee Fire Command –

State Patrol, Wi/DOT, ARC – Cenveo Lot

Land, water, and air

75 Fire units

75 Law enforcement

Dead and injured

Page 16: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 16

District Emergency Operations Center

6:08 – RTMC Notifies Metro

6:10 – DEOC Staff Notifications

6:50 – DEOC Fully Operational Wisconsin EOC Operational

State EOC Operational

Page 17: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 17

Significant Events

Massive media coverage

Cellular network system failure

Rescue hampered by dark

Brewers game begins as scheduled

Terrorism is Not suspected

Severe weather moves in

Fatalities are confirmed

Page 18: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 18

Wi/DOT Metro Operations

Incident Action Plan

Closing TBD

Establish detour

Establish and maintain closures

Public information and warnings

Page 19: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 19

Facilitated Discussion Period

Facilitator Introductions

Module Questions

Spokesperson – Brief Back

60:00

Page 20: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 20

Table Reports

Command Staff

(On Scene IC)

Planning

Section

Operations

Section

Logistics /Finance &

Administration

Page 21: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 21

Module 2

Operations

Aug. 2, 6:00 am -

Aug. 3, 7:00pm

Page 22: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 22

From Rescue to Recovery

Victim Recovery

Steel components moved down stream

Page 23: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 23

Bridge Inspections

Governor orders inspections of all WI bridges with designs similar to the TBD

Page 24: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 24

Recovery PlanningFederal

President “Respond robustly”

Transportation Secretary $5 million for rerouting traffic patterns

State

Governor declares peace-time emergency

Wi/DOT refines TBD detour

Local

Mayor Declaration of Emergency

Page 25: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 25

National Transportation Safety Board

Go Team arrives on scene

Hotline – photos and video 1-866-328-6347

Investigation and interviews

Page 26: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 26

Wi/DOT Operations

On-site efforts

Add lanes to I-94

Additional alternate routes

Page 27: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 27

Additional Duties

Network media

On site work space

Page 28: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 28

Press Conferences

LocalNationalWorld-wideTraffic radioWeb

Page 29: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 29

DEOC - End 24-Hour Operations

Friday, Aug. 3 - 7:00 PM

From emergency to demolition / building project

Transfer of Wi/DOT command to on-scene

Media inquiries forwarded to JIC

Page 30: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 30

Facilitated Discussion Period

Table Discussions

Module Questions

Spokesperson – Brief Back

45:00

Page 31: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 31

Table Reports

Command Staff

(On Scene IC)

Planning

Section

Operations

Section

Logistics /Finance &

Administration

Page 32: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 32

Module 3

Demobilization and Recovery

Aug. 4 - Present

Page 33: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 33

Change of Command

Meeting Aug. 4

Effective Aug. 6

No longer crime scene

Wi/DOT will have command

Page 34: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 34

Continuing OperationsDemolition & building project

Road closures

8’ security fence

Location for investigation-critical bridge materials

Page 35: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 35

August 6 – Adjusted Detour Route

Page 36: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 36

DEOC Standing Down

Wednesday, August 8

Stable Response to structure issues

Traffic control

Traffic management

TBD Bridge Replacement Project

Page 37: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 37

Facilitated Discussion Period

Table Discussions

Module Questions

Participant Feedback Forms

Spokesperson – Brief Back60:00

Page 38: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 38

Table Reports

Command Staff

(On Scene IC)

Planning

Section

Operations

Section

Logistics /Finance &

Administration

Page 39: Wisconsin Department of Transportation Metro District  Tabletop Exercise

Presenter’s Name June 17, 2003 39

Exercise Summary

After Action Report

After Action Conference

Improvement Plan

Hot Wash

Closing Remarks