Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization:...

43
Wireless Backhaul Optimization: A Market Waiting to Happen Don’t forget to join the telephone audio portion of today’s event 1-888-425-4170 Inside the U.S. or Canada 1-706-634-6387 International Conf. Code: 9889562 We’ll be starting at 9:00 AM EST, 2:00 PM GMT Technical Support: 888-865-7469 U.S. or Canada +1-706-643-3559 International *0 on the teleconference Reminder: Please give the telephone operator the same name that youve used to log into the computer portion of todays event

Transcript of Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization:...

Page 1: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Wireless Backhaul Optimization: A Market Waiting to Happen

Don’t forget to join the telephone audio portion of today’s event

1-888-425-4170 Inside the U.S. or Canada1-706-634-6387 InternationalConf. Code: 9889562

We’ll be starting at 9:00 AM EST, 2:00 PM GMT

Technical Support:888-865-7469 U.S. or Canada+1-706-643-3559 International*0 on the teleconference

Reminder:Please give the telephone operator thesame name that you’ve used to log intothe computer portion of today’s event

Page 2: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

How to Participate…To submit a text question, please type a message in to the window in your toolbar. If this window is not open, press the “Message” button.

Please be sure to select “Leaders” from the “Send To” pull down menu. When complete, click “Send.”

Page 3: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Wireless Backhaul Optimization:

A Market Waiting to Happen

Keith MallinsonEVP Research

The Yankee [email protected]

Page 4: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

4

Agenda

Wireless market overviewEvolving backhaul requirementsService provider business model evolutionImpact of wireless backhaul on service provider OPEXTechnology solutions for improving wireless backhaul efficienciesConclusions and recommendations

Page 5: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

5

2.5G/3G Migration: Technology Driven Acronym Chowder

CDMAOne

iDEN

20042001/02 CDMA2000 1X

CDMA2000 1x EV DO

“CDMAOne migration path”18% global market by 2007

“CDMAOne migration path”18% global market by 2007

GSM 20042001WCDMA or UMTSEDGEGPRS

“GSM migration path ”80% global market by 2007

“GSM migration path ”80% global market by 2007

Average Practical Data Rates (per user) 20-40kbps 40 - 180kbps 300-600kbps

?2004 WiDEN

IS-136 TDMA2001/02

2001/02

Throughput estimates based on February 2004 commercial service offerings by U.S. carriers and confirmed by the Yankee Group as follows:

•Sprint PCS claims 50-70 kbps average with peak speeds up to 144 kbps for CDMA2000 1X;

•Verizon Wireless claims 40-60 kbps with bursts up to 144 kbps for CDMA2000 1X;

•AT&T Wireless claims 25-40 kbps average for GPRS and 100-130 kbps for EDGE (bursts up to 200).

CDMA2000 1x EV DV

Page 6: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

6

Implications of Technology Evolution on Wireless Backhaul Requirements

Wireless networks are becoming increasingly complex

GSM/EDGE overlaid with WCDMA TDMA overlaid with GSM/EDGETDMA overlaid with CDMA2000GSM overlaid with CDMA2000 (e.g. China Unicom)

Wireless network capacity requirements are increasingNetworks are becoming increasingly extensive to include macro, micro and pico-cells

Page 7: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

7

Service Provider Business Evolution — Mature Markets

Service providers have focused on rapid deployment and CAPEX minimization, with insufficient regard for OPEX

Transmission network design and optimization has been neglectedMinimization of CAPEX has resulted inefficient designs from an OPEX perspective

Service providers in mature markets are becoming increasingly focused on OPEXFor network overlays (e.g. WCDMA) OPEX management becomes more challenging

Service providers are paying a great deal of attention to the design and optimization of their transmission networks

Significant opportunities in mature markets for advanced transmission solutions

Page 8: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

8

Service Provider Operational Expenditures Create Opportunities for Backhaul

30%

7%

20%

43%

Technical OperationsCustomer CareCost of Goods SoldMarketing Sales and Admin

13%

29%

34%

15%

3%6%

Field Maintenance andProduct SupportTechnical Personnel

Site Rental

Transmission

Utilities

Other

Total OPEX

Page 9: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

9

Leased Line versus Microwave Transmission

Some operators use microwave transmission to reduce leased line expensesMicrowave typically used by pure-play mobile operators in EuropeMicrowave rarely used in North America

10-15 percent of all transmissionConsequence of tradition and focus towards lower CAPEXDifficult to transition because of existing lease obligations

Microwave used more extensively in emerging marketsLimited availability of robust landline infrastructureLeases are often particularly expensive

Page 10: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

10

Wireless Service Provider Business Analysis —Emerging Markets

Greater focus towards minimizing both CAPEX and OPEXBenefit of green field (or near green-field) implementationsSignificant subscriber growth and deployment occurringChallenged by lack of supporting infrastructure (e.g. terrestrial transmission)Less “tradition” and greater receptivity to alternative network architectures

Emerging Markets represent a significant opportunity for advanced transmission solutions

Page 11: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

11

Technology Solutions for Optimizing Transmission

GSM UMTS

GSM UMTS

Grooming

Consolidatedtransmission

GSM UMTS

Grooming

Independenttransmission

Packetization

Optimizedtransmission

Page 12: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

12

Business Case for Backhaul

Average monthly price per T1/E1 is $500 in US, EUR600 in EuropeAverage cell site has between 1 and 2 T1/E1sUpgrades such as EDGE and WCDMA create demand additional T1/E1sOperators planning a network overlay (EDGE or WCDMA) can expect more than 30 percent savings in back haul costs

Before Optimization

After Optimization

Number of sites 10,000 10,000Average T1/E1 per site (with overlay) 2.75 1.925Monthly lease cost per T1 500 500Annual Lease Costs ($ million) 165.00 115.50

Annual savings with Optimization ($ million) 49.50

Page 13: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

13

Conclusions and Recommendations

Wireless service providers business models are changingNetwork efficiency as opposed to speed of deployment becoming increasingly importantTransmission networks in need of optimization solutions to reduce operational costsService providers are retrofitting grooming and packetization solutions to optimize their transmission networksExpect more than 30 percent savings in transmission costs when optimization used for GSM/EDGE overlaid networks

Page 14: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Mobile Operator Considerations for Backhaul Deployment: Experience in Experience in

BackhaulBackhaul OpexOpex ReductionReduction

Basilio Sadindi, Director of Operations

& Keith Pitout, Technical DirectorCeltel, DRC

[email protected]@cd.celtel.com

Page 15: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

15

Celtel Network:Currently 4 MSC’s, 5 BSC’s and 168 BTS sitesCeltel are owner of fixed backhaul MW network.Completely Ericsson NSS and BSS network.Currently using 24 VSAT links for remote BTS installations over a vast geographic area.

Initial trial on one VSAT linkExpanded to two more. Experiencing up to 50% reduction on capacity required over VSAT.

Backhaul Opex ReductionDRC Experience with NMS AccessGate

application DRC Experience with NMS DRC Experience with NMS AccessGateAccessGate

application application

Page 16: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

16

Only in service for a few months. No degradation of speech quality experiencedGSM Fax and Data fully functional over the link.Easy to set up and Operate.Stable and reliable.Currently in process of expanding to another 7 links Expecting a total of $250 000 per month on VSAT costs.Considering application over Microwave links.

Backhaul Opex ReductionOperational ExperienceOperational ExperienceOperational Experience

Page 17: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

17

BSCCell side AccessGate

MSO side AccessGate

Butembo Nord RBS

E1 cable

Ethernet cable

OAM Workstation

with AccessView

IP LAN

Satellite modem

Satellite modem

1 E1 link (backhaul)

1 E1 link (backhaul)

3 E1 links(2 carry A.bis traffic)

3 E1 links(2 carry A.bis traffic)

Backhaul Opex ReductionApplication ExampleApplication ExampleApplication Example

Page 18: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Ericsson Expander solutions

Page 19: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

19

Transmission77.6%

What if the most cost-efficient alternative available comes at a price of 10.000 € per E1 per month?

What can be done?

Page 20: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

20

Standard BSS RAN Solution

Call routing of a PLMN-PSTN call:Via the BSC and MSC

16 kbps on the PCMCircuit-switched AbisTransmission TS allocated to every Basic Channel in TRUStd: 10 TRU per E1 or 8 TRU per T1LAPD-C: +20–30% capacity/AbisLAPD-M: +30–50% capacity/Abis

MSC&

Server

BSC&

Server

A+-interfaceSignaling

/E1

Circuit-Switched

RBS/

BTS

StandardA”

RBS/

BTS

RBS/

BTS

RBS/

BTS

StandardA”

StandardA”

A sub

B sub

A sub

B sub

Page 21: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

21

The Layered Network Architecture !!

ControlCentralized location of servers reduces O&M costIndependent of transport technology

ConnectivitySame transport for all servicesFree choice of transmission technology Distributed MGws enables transmission savingsEnables transport of coded voicePooled media stream resources

End-userapplications

Control

MSC HLR

GGSN

GMSC/TransitSG

Connectivity

GSM/ EDGEAccess

WCDMAAccess

MGW MGWInternetIntranet

PSTNISDN

SGSN

Each layer can grow independently

Page 22: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

22

Other Transmission-Saving Functionality1) Bandwidth optimization

Silent call suppression, 30–50% savings on CS Flexible Abis, up to 30% savings on packet switchedAMR subrate switching, 50% savings on CS

2) IP Abis 30–50% lower cost per Mb over Abis (xDSL, Ethernet vs. E1/T1)Bandwidth optimization possible on top of this

3) Local switching Additional 20–50% savings on top of bandwidth optimization

Page 23: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

23

The Silent Call Suppression Solutions

Saving:Discontinous transmissionSaving up to 50%

NW impact:HW: NMS AccessGateSW: BSS

MSC&

Server

BSC&

Server

A+-interfaceSignaling

/E1

Circuit-Switched

RBS/

BTS

StandardA”

RBS/

BTS

RBS/

BTS Silent Call Supression

Box

Silent Call Supression

BoxOne box handles 8 E1

RBS/

BTS

Page 24: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

24

AMR Subrate Switching

AMR subrate switching over Abis:Subs are ordered to AMR 7.15 kbps

⇒Two subs can be squeezed into every 16kb Abis TSSavings: +50% on AbisAMR mobiles needed

StandardA”

StandardA”

B subA sub

AMR 7.15AMR 7.15

AB

16k

TSA

B

16k

TS

MSC&

Server

BSC&

Server

A+-interfaceSignaling

/E1

Circuit-Switched

RBS/

BTS

StandardA”

RBS/

BTS

RBS/

BTS

RBS/

BTS

Page 25: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

25

The IP Solution

Packet-Switched AbisDimension transmission links based on peak traffic over linkHW: IP switch card addedSW: BSS

IP Support

IP Support

IP GSM Radio

Access

MSC&

Server

BSC&

Server

A+-interfaceSignaling

/E1

Circuit-Switched

RBS/

BTS

StandardA”

RBS/

BTS

RBS/

BTS

RBS/

BTS

IP Support

IP Support

Page 26: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Thank You!Thank You!

Page 27: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Wireless Backhaul Technologies

Page 28: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

28

Wireless Backhaul TodayGSM Network Characteristics

Large number of geographically-dispersed cell sitesOne or more E1/T1s per cell site — inefficiently utilizedNew technology deployments require additional, separate, E1/T1 facilities

GSM/GPRS/EDGE

E1/T1s x n A.bis

BSC MSC

E1/T1s x n

A interface2G/3G

Wireless Backhaul

TRAUE1/T1s x n

A.ter

CDMA

TDMA

UMTS

Page 29: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

29

Early Backhaul Optimization

TDM groomers save unused DS0sSimple approachNo statistical multiplexingNo help for Abis inefficiencies

BSC Groomer

Page 30: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

30

3G Backhaul — The Vision

2G & 3G traffic combined on ATM backhaulStatistical multiplexing gain; may avoid stranded DS0sNo help with Abis inefficiencies; Adds ATM cell taxWill be superceded by IP backhaul, eventually

ATMSW

ATMSW

ATMSW

RNC

BSC

Page 31: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

31

Typical GSM A.bis on E1

Multiple lightly loaded signaling channels

16 kbps TRAU channels, occupied even during silence

Unused DSOs

Page 32: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

32

GSM 2GBefore Optimization

5 T1/E1s Total

2 T1/E1sA.bis

3 T1/E1sA.bis

BSC

Central Office

BTS13 TRX

BTSMW/Fiber

BTS22 TRX

Page 33: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

33

Backhaul Optimizations

Eliminate traffic fromCall inactivityVoice silence periodsOther TRAU idle framesGPRS & EDGE idle PCU frames

Multiplex signaling channelsRecover stranded timeslots (TDM grooming)Handle other cell site traffic

Location measurement unitIP links for other remote third-party equipment

Page 34: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

34

…With Optimization

BSC

Central Office

2 T1/E1s Eliminated

3:2 Savings2:1 Savings

BTS13 TRX

BTSMW/Fiber

BTS22 TRXSPAN 1 SPAN 2

10/100 ETHERNET

PolicyPoint

SPAN 1 SPAN 210/100 ETHERNET

PolicyPoint

2 T1/E1sA.bis

3 T1/E1sA.bis

Access Gate CPCI Chassis(Incl Mgmnt, Eth Switches)

CONSOL E

T X

RX

T X

RX

PORT 26

PORT 25

CompactPCI

CPC440024+2 SWI TCH

11

9

7

5

3

1

13

15

17

19

21

23

25

2

4

6

8

10

12

14

16

18

20

22

24

26

MGMT PORT

SYST EM FAUL T

AC

T/LINK

SP

EE

D

AC

T/LINK

SP

EE

D

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

CONSOL E

TX

RX

TX

RX

PORT 26

PORT 25

CompactPCI

CPC440024+2 SWI TCH

11

9

7

5

3

1

13

15

17

19

21

23

25

2

4

6

8

1 0

1 2

1 4

1 6

1 8

2 0

2 2

2 4

2 6

MGMT PORT

SYST EM FAUL T

AC

T/LINK

SP

EE

D

AC

T/LINK

SP

EE

D

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

Cha

ssis

She

lf C

ontr

oler

Cha

ssis

She

lf C

ontr

oler

Page 35: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

35

Stringent Requirements

Radio vendor inter-op certificationVendor-specific interface issues are time consuming, but critical for successful deployment

Minimum added end-to-end latency10 ms or more added delay has unacceptable impact on voice quality

Automatic payload analysisCritical to avoid manual provisioning of timeslot assignments

Minimum footprintTypically must fit within existing BTS cabinet

Page 36: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

36

3 T1/E1s A.bis

1 T1/E1 EDGE

SPAN 1 SPAN 210/100 ETHERNET

PolicyPoint

EDGE & Expansion…

EDGE is introduced into the networkOverall GSM traffic increase

Note: The TRX numbers are calculated for T1s

5:3 Savings

BTS13 TRX

BTSMW/Fiber

BTS22 TRX

1 T1/E1 EDGE 4:2 Savings

3 T1/E1sA.bis

4 T1/E1sA.bis

SPAN 1 SPAN 210/100 ETHERNET

PolicyPoint

SPAN 1 SPAN 210/100 ETHERNET

PolicyPoint

4 T1/E1s Eliminated

Access Gate CPCI Chassis(Incl Mgmnt, Eth Switches)

CONSOL E

T X

RX

T X

RX

PORT 26

PORT 25

CompactPCI

CPC440024+2 SWI TCH

11

9

7

5

3

1

13

15

17

19

21

23

25

2

4

6

8

10

12

14

16

18

20

22

24

26

MGMT PORT

SYST EM FAUL T

AC

T/LINK

SP

EE

D

AC

T/LINK

SP

EE

D

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

CONSOL E

TX

RX

TX

RX

PORT 26

PORT 25

CompactPCI

CPC440024+2 SWI TCH

11

9

7

5

3

1

13

15

17

19

21

23

25

2

4

6

8

1 0

1 2

1 4

1 6

1 8

2 0

2 2

2 4

2 6

MGMT PORT

SYST EM FAUL T

AC

T/LINK

SP

EE

D

AC

T/LINK

SP

EE

D

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

NMS

RS

232

Access Gate

FaultStandbyOk

Activity100 M

b

1 3 5 7

2 4 6 8

Ethernet1 2

NMS

Cha

ssis

She

lf C

ontr

oler

Cha

ssis

She

lf C

ontr

oler

BSC

Central Office

Page 37: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

37

UMTS Support

Remove non-active cells from the ATMPool/multiplex UMTS traffic over the common backhaul

Avoid inefficient ATM circuit emulationMore efficient than any ATM over fractional E1

2 T1/E1sA.bis

2 T1/E1sA.bis

SPAN 1 SPAN 210/100 ETHERNET

PolicyPoint

2G BTS

3G Node B

CellSite

3G Node B

CellSite

2G BTS

T1/E1 Iub

SPAN 1 SPAN 210/100 ETHERNET

PolicyPoint

TDM

ATM

Central Office

A interface

RANAPGateway

RNC BSC

MSC

Page 38: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

38

Evolution to IP Backhaul

2G & 2.5G optimizationsare still required

ROP* over IP w/HC**over T1/E1

ATM

Mobile SwitchingFacilities

A interface

RNC BSC

* ROP – RAN Optimized Protocol** HC – IP Header Compression

RouterRouter

RouterRouter

ROP* over IP

IP Network

2 T1/E1sA.bis

SPAN 1 SPAN 210/100 ETHERNET

PolicyPoint

2G BTS

3G Node B

CellSite

Page 39: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Backhaul ManagementAn OpEx Reduction

Opportunity

39

Backhaul OptimizationSave Money — Support New Services

Reduce operating expensesBackhaul can be 30% of OpEx

Provide new services and/or new capacity with limited or existing backhaul capacity

Page 40: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...
Page 41: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

Wireless Backhaul Technologies

Q & A

Page 42: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

For more information….

Contact:Keith Mallinson, The Yankee Group,

[email protected] Sadindi, Celtel,

[email protected] Bäckström, Ericsson,

[email protected] Turner, NMS Communications,

[email protected]

Page 43: Wireless Backhaul Optimization: A Market Waiting to · PDF fileWireless Backhaul Optimization: A Market Waiting to Happen ... Wireless Backhaul Optimization: A Market Waiting to ...

THANK YOU!