WIPP - Photo Gallery Page 1 of3 · 2012. 7. 20. · WIPP - Photo Gallery Page 2 of3 A shipment of...

3
WIPP - Photo Gallery Page 1 of3 Gallery Shortcuts WIPP Site Transportation Contact-Handled TRU Waste Remote-Handled TRU Waste Home News & Information Documents Opportunities Contact Us Search ------ I .' . News Information Photo Gallery Click on a thumbnail image to see a larger version of the photographs. WIPP Site Back to top The entrance to the Waste Isolation Pilot Plant near Carlsbad, N.M. The Waste Isolation Pilot Plant at sunrise. A view of the Waste Isolation Pilot Plant from a distance. Transportation Back to top .. - -.. -- A Tri State Motor Transit truck transporting three TRUPACT-II shipping containers on the highway. A CAST Transportation truck transporting three TRUPACT-II shipping containers on the highway. A WIPP truck approaches the r•••••.•. "";::::;": ••• Waste Isolation Pilot Plant. http://www.wipp.energy.govlPhoto_Gallery.htm 6/512012

Transcript of WIPP - Photo Gallery Page 1 of3 · 2012. 7. 20. · WIPP - Photo Gallery Page 2 of3 A shipment of...

Page 1: WIPP - Photo Gallery Page 1 of3 · 2012. 7. 20. · WIPP - Photo Gallery Page 2 of3 A shipment of contact-handled transuranic waste arrives at the Waste Isolation Pilot Plant. Contact-handled

WIPP - Photo Gallery Page 1 of3

GalleryShortcuts

WIPP Site

Transportation

Contact-HandledTRU Waste

Remote-HandledTRU Waste

Home News & Information Documents Opportunities Contact Us Search

------

I .'

. NewsInformation

Photo GalleryClick on a thumbnail image to see a larger versionof the photographs.

WIPP Site Back to top

The entrance to the WasteIsolation Pilot Plant nearCarlsbad, N.M.

The Waste Isolation Pilot Plant atsunrise.

A view of the Waste Isolation PilotPlant from a distance.

Transportation Back to top

..- -..--A Tri State Motor Transit trucktransporting three TRUPACT-IIshipping containers on thehighway.

A CAST Transportation trucktransporting three TRUPACT-IIshipping containers on thehighway.

A WIPP truck approaches ther•••••.•."";::::;":•••Waste Isolation Pilot Plant.

http://www.wipp.energy.govlPhoto_Gallery.htm 6/512012

Page 2: WIPP - Photo Gallery Page 1 of3 · 2012. 7. 20. · WIPP - Photo Gallery Page 2 of3 A shipment of contact-handled transuranic waste arrives at the Waste Isolation Pilot Plant. Contact-handled

WIPP - Photo Gallery Page 2 of3

A shipment of contact-handledtransuranic waste arrives at theWaste Isolation Pilot Plant.

Contact-handledTRU waste disposal

Back to top

An empty TRUPACT-II is loadedonto a trailer. TRUPACT-lis aresent to the generator sites emptyand return with transuranic waste

'-- ...-:.---' for disposal.

The outer-shell lid of a TRUPACT-II is lifted off inside of the WasteHandling Building.

Transuranic waste arrives in theWIPP underground on the wastehoist. The white vehicle is called atransporter, which will move thewaste to the disposal area.

A radiation control techniciankeeps a watchful eye as contact-handled transuranic waste isdisposed in the WIPP

L-.......:.......:..... ---"" underground.

-•• • •

I~' rr'UP I

.Ii~II>a .'

. .

Remote-handledTRU waste disposal

Back to top

An RH-72B shipping container is•••••------ a lead-lined cask that is certified

by the U.S. Nuclear RegulatoryCommission. The RH-72B is usedfor shipping remote-handledtransuranic waste to the Waste

"-----' Isolation Pilot Plant.

~•.• ----Qt

The CNS 10-160B is an alternateshipping container for sendingremote-handled transuranic wasteto the Waste Isolation Pilot Plant.

The Horizontal Emplacement andRetreival Equipment (HERE) isused to push remote-handledtransuranic waste into horizontalboreholes in the disposal room

1IU.....e:::.. walls.

http://www.wipp.energy.govlPhoto_Gallery.htm 6/5/2012

Page 3: WIPP - Photo Gallery Page 1 of3 · 2012. 7. 20. · WIPP - Photo Gallery Page 2 of3 A shipment of contact-handled transuranic waste arrives at the Waste Isolation Pilot Plant. Contact-handled

WIPP - Photo Gallery

Mining Back to top

The Waste Isolation Pilot Plantuses a continuous miner to carvedisposal rooms out of thePermian Salt Formation, nearly ahalf mile below the surface.

An underground dump truckempties its load at the SaltHandling Shaft for the 2,150-foottrip to the surface.

Notice To Users: Use of this system constitutes consent to security monitoring and testing. All activity is loggedwith your host name and IP address. For more information, please refer to the DOE Privacy Policy

Please report problems to: [email protected]

I x Hit r.rllontAr

http://www.wipp.energy.govlPhoto_Gallery.htm

Page 3 of3

6/512012