WIP SETUP FOR A NEW
ORGANIZATION
NAVIGATION: Work in Process Setup Parameters Costing tab
Select Default Completion Cost Source System Calculated.
Select System option Use Actual Resources.
Check Auto compute Final Completion checkbox.
-
7/31/2019 wip setup
2/14
Navigate to Move Transactions tab.
Check Require Scrap Account checkbox.
Check Allow Creation of New Operations checkbox.
Check Allow Move Over No Move Shop Floor Statuses checkbox.
-
7/31/2019 wip setup
3/14
Navigate to Backflush Defaults tab.
Select WIPMS as Supply Subinventory.
Select Lot Selection Method Expiration Date.
Select All as Lot Verification.
Check Release Backflush Components checkbox.
Check Allow Quantity Changes During Backflush checkbox.
-
7/31/2019 wip setup
4/14
Navigate to Intraoperation tab.
Check Queue, To Move, Scrap, Reject Checkboxes.
-
7/31/2019 wip setup
5/14
Navigate to Outside Processing tab.
Select No Move as Shop Floor Status For PO Move Resources.
Select At Operation as Requisition Creation Time.
Select Propagate Job Change to Purchasing Automatic.
Enter NeedBy Date Tolerance Days Early 1000.
Days Late 1000.
-
7/31/2019 wip setup
6/14
Navigate to Scheduling tab.
Check Include Resource Efficiency checkbox.
Check Include Resource Utilization checkbox.
Check Use Constraint Based Scheduler and select Constraints Resource
and Material and Primary Objection Maximize Ontime Completion and
Horizon(days) 2000.Then uncheck the checkbox.
-
7/31/2019 wip setup
7/14
Navigate to Mobile tab.
Select Alias Scrap Accounts.
Select Number
Company - LAGAN ENGINEERING CO. LTD.
Location Lagan-2
Department Default
Account Cost of Good Sold
Sub Account Default
And click on OK.
-
7/31/2019 wip setup
8/14
Navigate to Serial tab.
Check Default Serialization Start Operation checkbox.
Check Auto Associate Serial Number on Job Creation From Interface checkbox.
-
7/31/2019 wip setup
9/14
Navigate to Other tab.
Enter Default Overcompletion Tolerance % 1000.
-
7/31/2019 wip setup
10/14
WIP ACCOUNTING CLASSES:
Enter Class.
Enter Accounts.
-
7/31/2019 wip setup
11/14
CASTING
-
7/31/2019 wip setup
12/14
SCRAP
-
7/31/2019 wip setup
13/14
-
7/31/2019 wip setup
14/14
STEEL