Winter Leader Conference February 4, 2009 “ Building Strong “ 1
The FY 2011 CW Program
Mr. Pete LuisaMr. Pete Luisa1 March 2010 1 March 2010 PNWAPNWA
Winter Leader Conference February 4, 2009 “ Building Strong “ 2
• US Ports & Waterways convey > 2B Tons Commerce • Foreign Trade alone creates > $160 B Tax Revenues
Recreation areas 376 M Visitors/yrGenerate $15 B in economic activity,
500,000 jobs
11,000 miles of Commercial Inland
Waterways:½ the cost of rail1/10 the cost of
trucks
400 miles ofShore protection
8500 Miles of Levees
299 Deep Draft Harbors
EmergencyOperations
Stewardship of11.7 Million Acres
Public LandsEnvironmental
Restoration
627 Shallow Draft Harbors
Regulatory
¼ of Nation’s Hydropower: $500 M + in power sales
Civil Works Value to the NationCivil Works Value to the Nation
Winter Leader Conference February 4, 2009 “ Building Strong “ 3
PROGRAM STRUCTURE
Business LineNavigation Coastal harbors; Inland WaterwaysFlood Damage Reduction Riverine Floods; Coastal StormsEnvironment Aquatic Ecosystem Restoration Stewardship Formerly Utilized Site Remedial Action HydropowerRecreationWater SupplyEmergency Regulatory
AccountInvestigations Construction Operations & Maintenance Mississippi River & Tribs Regulatory Program Formerly Utilized Sites Remedial Action Program Expenses Flood Control & Coastal Emerg
Winter Leader Conference February 4, 2009 “ Building Strong “ 4
Budget Reviewed & Presented to SecArmy
(Jun - Aug )
OMB Passback( Nov )
Budget Submitted to OMB ( Sep )
President’s Budgetto Congress ( Feb )
All Offices DevelopProgram Requirements
( Feb - May )
Appropriations Bills( Jul - Sep )
Cong. Hearings ( Mar - Apr )
President Signs Approp. Bill ( Sep - Oct )
OMB-ASA GUIDANCE ( FEB-MAR )
Funding Alloc. To Field Offices
( Oct - Dec )
Winter Leader Conference February 4, 2009 “ Building Strong “ 5
FY 09 PROGRAM PROCESS
Use Performance Measures and Policy Direction Guidance memo to: · Rank competing investments in each business program · Demonstrate improved outcomes from added increments
Develop amounts based on their own internal performance metrics for: · GE; REG; FCCE; REC; ENV Stewardship; FUSRAP
Develop Performance Based program for project competing business lines: · Initial level (No new work, phases or contracts, previously budgeted projects only) · O&M at 75% of last 5 years budget; Investigations same as PY-1. · Categorize and Prioritize CG projects into Priority levels · Add Performance Base High Return items and increments for GI and O&M items
Add to the Highest Priority, ongoing projects & contracts to “Final Budget”
Winter Leader Conference February 4, 2009 “ Building Strong “ 6
Budgeting Measures
Construction
FRM & NAV & HYDRO - Benefit to Cost Ratio
FRM & NAV - Dam Safety & Seepage Stability
FRM – Construction Flood “Risk” Index
ENR - Loss prevention for significant natural resources
O&MNAV – Tonnage movements
FRM & NAV & HYDRO – “Risk” Assessments
ALLNew/Continuing/Completing/Years to Complete
Watershed Elements
ESA & compliance needs
Safety, Caretaker, Compliance, Subsistence
Winter Leader Conference February 4, 2009 “ Building Strong “ 7
PROGRAM COMPARISON($ millions)
FY08 App FY09 Bud FY09 App FY10 Bud FY10 App FY11 Bud Investigations 167 91 168 100 160 104Operation & Maintenance 2244 2475 2202 2504 2400 2361Construction 2294 1402 2142 1718 2031 1690Miss. River & Tribs. 387 240 384 248 340 240Regulatory Program 180 180 183 190 190 193Flood Control & Coastal Em. 0 40 0 41 0 30F.U.S.R.A.P. 140 130 140 134 134 130Expenses 175 177 179 184 185 185OASA(CW) 5 6 4.5 6 5 6
Total 5592 4741 5403 5125 5445 4939
Winter Leader Conference February 4, 2009 “ Building Strong “ 8
Budget Arithmetic
Civil Works Budget Math $4,800 mil
• Allocate GE, REG, FCCE, REC, FUSRAP… - 900• Allocate Base O&M (~75% of required) - 1,800• Essential Dam Safety - 500• High Performing Construction - 700• Life Projects - 200• Environmental Requirements - 200• Planning Studies - 100
• Minimum Essential Allocation = - $4,400
• Left for all other CW Projects & Programs ~ $ 400 mil*• Use the $400 mil to restore project O&M to prior year levels
Winter Leader Conference February 4, 2009 “ Building Strong “ 9
NEW ACTIVTIES & HIGHLIGHTS
Construction – Louisiana Coastal Area, LA., Onion Creek, TX.
Investigations – Water Priorities Study Water Resources P&G Support
O&M – Coastal Data Information Program Global Change Sustainability Program
$82.3 M from the IWWTF$764.4 M from the HMTF$58 M to be cancelled from the MR&T
Winter Leader Conference February 4, 2009 “ Building Strong “ 10
CW Funding Through FY11 Budget
$3,000
$3,500
$4,000
$4,500
$5,000
$5,500
$6,000
97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
Thousa
nds
Budget Request Final Approp.
Winter Leader Conference February 4, 2009 “ Building Strong “ 11
And for the Out Years …
• Expect a major debate on Federal funding priorities to commence with the FY 11 budget and continue beyond
• We will continue to place a high priority on execution of all that is appropriated
• We will seek to improve our budget ‘defense’ of the value to the nation of the water resources infrastructure for which we are responsible
Winter Leader Conference February 4, 2009 “ Building Strong “ 12
ARRA Breakdown by Account
SUMMARY OF APPROPRIATIONS
($Billions)• Investigations $0.025
Construction $2.000• O&M $2.075• MR&T $0.375• Regulatory $0.025• FUSRAP $0.100• TOTAL $4.600
Winter Leader Conference February 4, 2009 “ Building Strong “ 13
American Recovery and Reinvestment ActSelection Criteria - I
Purposes of the Law:
To preserve and create jobs and promote recoveryTo assist those impacted by the recessionTo provide investment needed to increase economic efficiency by spurring
technological advance in science and healthTo invest in transportation, environmental protection, and other
infrastructure that will provide long term economic benefits To stabilize State and local government budgets
Criteria in Conference Report refer to project, programs or activities that will:
(1) be obligated/executed quickly; (2) result in high, immediate employment; (3) have little schedule risk; (4) be executed by contract or direct hire of temporary labor; and (5) complete either a project phase, a project, or will provide a useful service
that does not require additional funding.
Winter Leader Conference February 4, 2009 “ Building Strong “ 14
Stimulus-Project Selection Criteria *
Criteria Implementation
Obligate/execute quickly;
High, immediate employment
Sort and select by awards and/or completions dates
Little schedule risk Districts filter out all projects with schedule risk
Complete phase, project, element, or will provide a useful service with no additional funding
Districts prepare work packages accordingly
Execute by contract or direct hire of temporary labor
No in-house labor except for OH/E&D/S&A
No reimbursements
No land purchase
* No cost sharing with Inland Waterways Trust Fund Significant “transparency” requirements for tracking, monitoring and reporting of specific metrics All unobligated funds (except for E&D, S&A and claims) expire 30 Sep 2010.
Winter Leader Conference February 4, 2009 “ Building Strong “ 15
Civil Works Recovery Act Status
Programs Planned
($M)
Obligated
($M)
Outlays
($M)
Projects
Planned/Started
(#)
Operation & Maintenance
$2,075 74%
$1532
23%
$486
533/521
Construction $2,000 53%
$1049
11%
$221
175/147
Mississippi River & Tributaries
$375 58%
$218
31%
$117
45/37
Formerly Utilized Sites Remedial Action Program (FUSRAP)
$100 90%
$90
13%
$13
10/10
Investigations $25 64%
$16
24%
$6
66/54
Regulatory Program $25 46%
$12
33%
$8
1/1
Program Status:• Congress appropriated and U.S. Army Corps
of Engineers (USACE) Civil Works Program planned to spend $4.6 billion in the Recovery Act funds.
• U.S. Army Corps of Engineers (USACE) obligated $75 million during the week ending, January 29 bringing the cumulative obligation total of Recovery Act funds to $2,917 million, 63% of the appropriation.
• USACE cumulative total outlays as of January 29 was $851 million, 19% of the appropriation.
• End of March obligation target = 76%
830/770
Winter Leader Conference February 4, 2009 “ Building Strong “ 16
# o
f C
on
trac
ts
FY10 Civil Works ARRA Execution All Programs
Data a/o 29 January 2010
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
$ M
illi
on
s
0
100
200
300
400
500
600
700
800
900
Basic Sched 64 127 328 333 613 77 89 230 289 180 272 57 26 39 18 24 26
Current Sched 110 223 381 454 771 84 103 208 292 192 345 58 22 32 14 20 18 16
Actual Aw ds 124 267 434 453 738 103 134 209 175
Basic Sched (cum) 228 535 899 1,308 2,214 2,404 2,562 2,733 3,050 3,286 3,667 3,743 3,881 3,955 4,072 4,144 4,266
Current Sched (cum) 228 535 899 1,308 2,214 2,404 2,568 2,801 3,065 3,294 3,680 3,771 3,903 3,985 4,099 4,188 4,331 4,431
Actual Oblig (cum) 228 535 899 1,308 2,214 2,405 2,569 2,803 2,948
May-09
Jun-09 Jul-09Aug-09
Sep-09
Oct-09Nov-09
Dec-09
Jan-10Feb-10
Mar-10
Apr-10
May-10
Jun-10 Jul-10Aug-10
Sep-10
FY 2011
Winter Leader Conference February 4, 2009 “ Building Strong “ 17
ARRA PLANNED ACCOMPLISHMENTS
Hydropower
35 projects repaired or improved
Environmental Infrastructure
148 Local water supply & wastewater project constructed
Recreation 460 recreation areas maintained or upgraded
Navigation 48 Locks repaired or improved
Flood Risk Management• 122 Dam safety
• 76 Local Protection
• 96 Dams repaired or improved
• 10 Emergency bank protection
• 820 Levee inspections
Winter Leader Conference February 4, 2009 “ Building Strong “ 18
How We All Contribute
• USACE: – Develop the vision, goals, objectives in an open, collaborative way– Implement the Strategic Plan
• Administration: – “Walk the performance-based budget talk.”
• Stakeholders:– Contribute to vision, Goals, Objectives, Metrics
• ALL: Keep Communicating! - A Vision to be the desired future state of water resources and the desire to have a water resources infrastructure that will serve this Nation’s economic, quality of life needs, today and into the future.