Windsor Woods Tide Gate Stop the Tide, Save the Storage July 31, 2020 Hampton Roads Adaptation Forum

Transcript of Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields...

Page 1: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Windsor Woods Tide Gate

Stop the Tide, Save the Storage

July 31, 2020

Hampton Roads Adaptation Forum

Page 2: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

2

Presenters

Michael Bumbaco III, PE City of Virginia Beach Stormwater

Nicole Dane, PE Michael Baker International

Curtis HickmanWetland Studies and Solutions Inc.

Page 3: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

PROJECT AREA

3

AtlanticOcean

Chesapeake Bay

Oceana Naval Base

City ofVirginia

Beach Limits

Lynnhaven River

MountTrashmore

Park

PROJECTAREA

N

TownCenter

Page 4: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

4

Total Project Area – 2,600 Acres (8,500 Parcels)Windsor Woods – 1,300 Acres (3,700 Parcels)

Princess Anne Plaza – 1,100 Acres (3,800 Parcels)The Lakes – 185 Acres (1,000 Parcels)

Total Assessed Value – $2B

Windsor WoodsPrincess Anne

Plaza

TheLakes

Page 5: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

▪ Flooded Homes and Property Damage

▪ Flooded Roads

▪Access Limited for:

o Emergency First Responders

oCity Maintenance Crews

oResidents

▪Areas Isolated until Flooding recedes

5

The Problem = Flooding

Page 6: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

▪ Infrastructure is ± 50 years old (Built in 1960’s)

▪Area is Fully-Developed

▪ Existing storm drains are inadequate or non-existent

▪ Lack of storage

▪ Elevations in the area are low and flat

▪ Frequency & severity of storms is increasing

▪Area is tidally influenced

6

Why the Problem?

Page 7: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

PROJECT AREA

Tidal Influence & Natural Drainage

Patterns7

PROJECTAREA

AtlanticOcean

Chesapeake Bay

N

City ofVirginia Beach

Limits

Page 8: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

8

Risk Assessment Map

Page 9: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Sewells Point Tide Gauge Data

Page 10: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

24-Hour Precipitation Return PeriodNorfolk Airport Rain Gauge (NOAA/NWS)

Page 11: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Hurricane Matthew

▪ Rainfall from Hurricane Matthew (Oct 2016) resulted in extreme flooding

▪ 800 Residences Reported Damage (Modeling approximates over 1,400)

▪ Many streets were impassable

▪ Flood Insurance Rates have significantly increased

11

Page 12: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Flooding from Hurricane Matthew (2016)

4412

Page 13: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Work Leading to the Tide Gate?

▪ Public Outreach and Involvement

▪ Windsor Woods Stormwater Management System Flood Mitigation Plan -CDM Smith - April 2018

▪ Final Windsor Woods Drainage Improvements PER –Michael Baker – September 2019

13

Page 14: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Overall Solutions

▪Gates to Block Incoming Tide

▪ Stormwater Pump Stations

▪Additional Storage

▪ Flood Barriers

▪ Storm Drains

14

Page 15: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

15

Overall Preliminary Concept Plan(Recommended Infrastructure)

Lynnhaven P

kw

y

Lake

Windsor

Lake

Trashmore

Northgate Plaza

Ball Fields

POTENTIAL STORMWATER

STORAGE

NEW STORM DRAINS WILL BE

INSTALLED THROUGHOUTTHE PROJECT

AREA

POTENTIAL NORTH PUMP STATION,

TIDE GATE & BARRIER

LOCATION

WINDSOR WOODS PUMP STATION, TIDE GATE &

BARRIER LOCATION

POTENTIAL SOUTH TIDE GATE,

CHANNELS & BARRIER

LOCATION

Page 16: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Windsor Woods Tide Gate Project

16

▪ Windsor Woods Tide Gate Selected by City to Move Forward

o Tide Gate (60 feet wide; 4 bays)o Pump Station (750 cfs)o Barriers (100-year)

Gate Blocks Incoming Tide Stormwater Storage

Page 17: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Windsor Woods

17

Lake Trashmore

Natural Drainage Patterns

Page 18: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Windsor Woods

18

Tidal Impacts

Lake Trashmore

Page 19: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Windsor Woods19

Proposed Pump

Station

Proposed Tide Gate

Lake Trashmore

Page 20: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

20

Proposed Barrier

Windsor Woods

Lake Trashmore

Page 21: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

21

Windsor Woods Tide Gate & Pump Station Site

Lake Windsor

Page 22: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

22

Windsor Woods Tide Gate & Pump Station Rendering

Lake Windsor

Page 23: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Windsor Woods Tide Gate Rendering

23

Page 24: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

24

Windsor Woods Tide Gate & Pump Station Rendering

Page 25: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

25

Windsor Woods Tide Gate & Pump Station Site

Lake Windsor

Lake Windsor

Lake Windsor

Mount TrashmoreSkatepark

Mount TrashmoreSkatepark

Page 26: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

26

Lake Windsor – Ex. Conditions (Low Tide)

Water Level at Low Tide

Thalia Creek

Lake Windsor

High Tide –

Low Tide –

UPSTREAMDOWNSTREAM

Available Storage Capacity at Low Tide

Natural Flow of Drainage

Page 27: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

27

Lake Windsor – Ex. Conditions (High Tide)

Water Level at Low Tide

Thalia Creek

Lake Windsor

Water Level at High TideHigh Tide –

Low Tide –

Tide Fills Available Storage

Incoming Tide

UPSTREAMDOWNSTREAM

Page 28: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

28

Lake Windsor – Ex. Conditions During Storm

Lake WindsorThalia

Creek

UPSTREAMDOWNSTREAM

Storage Capacity Exceeded Quickly and Flooding Occurs

Low Tide –

High Tide –

Water Level at Low Tide

Water Level at High Tide

Page 29: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

29

Lake Windsor – After Tide Gate Installation(Post-Improvements)

Water Level at Low Tide Lake

Windsor

Water Level at High Tide

Tide Gate in the Open Position

Normal Water LevelHigh Tide –

Low Tide –

UPSTREAMDOWNSTREAM

Thalia Creek

Page 30: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

30

Lake Windsor – After Tide Gate Installation(Post-Improvements)

Water Level at Low Tide

Lake Windsor

Tide Gate in the Closed Position

High Tide –

Thalia Creek

UPSTREAMDOWNSTREAM

Low Tide –

Storage Now Available Since Tidal Influence Eliminated

Page 31: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

31

Lake Windsor – After Gate & Pump Installed

Lake Windsor

Tide Gate and Pump Station In

Operation

High Tide –

UPSTREAMDOWNSTREAM

Pumps Used to Maintain Water

Levels Behind Gate

Additional Storage Created

by Pump Drawdown

Low Tide –

Thalia Creek

Page 32: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Regulatory

Pump Station

Storage(Water Quality)

Gates & Barriers

Storm Drain Network

Key Program Components

Page 33: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Regulatory Permitting

33

▪ Permitting o Corps and DEQ Individual Permits

o Early Regulatory Coordination and Agency Involvemento Public Outreach and Buy Ino Alternatives Evaluation – Couldn’t Have Found a Better Site

▪ Aquatic Life o Frequency and Duration of Closureo Maintenance of Low Flow o Intake Structures – Entrainment

Page 34: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

This is a Great Site for LEDPA!!!

34LEDPA – Least Environmentally Damaging Practicable Alternative

Page 35: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Fish Passage - Frequency and Duration of Closure

▪ Typically open during “Sunny Day” conditions

▪ Closed ~5-8 times a year

▪ ~24 to 48-hour pre-storm pump down

35

Page 36: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Maintenance of Low Flow - Aquatic Life

36

Page 37: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Intake Structures - Entrainment

37

Page 38: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

Intake Structures

38

Page 39: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

39

All Permits Received

▪ USACE and DEQ Individual Permits Issued

▪ No VMRC Permit Required

▪ A separate permit will be necessary for the larger pump.

▪ And the process starts again!

Future Permits

Page 40: Windsor Woods Tide Gate - sites.wp.odu.edu · windsor lake trashmore northgate plaza ball fields potential stormwater storage new storm drains will be installed throughout the project

40

Summary/Take-Aways

▪ Tide gate is the first project in this multi-faceted Long-term Program

▪ Permitting is Critical for Large Water Dependent Projects

▪ Regulatory Coordination needs to be Integral in Planning Process

▪ Public Involvement/Buy-In Important

▪ Pre-Storm Planning & Preparation is Critical

▪ Long-Term Operation & Maintenance Required

▪ Construction Anticipated Spring 2021