Windsor Woods Tide Gate
Stop the Tide, Save the Storage
July 31, 2020
Hampton Roads Adaptation Forum
2
Presenters
Michael Bumbaco III, PE City of Virginia Beach Stormwater
Nicole Dane, PE Michael Baker International
Curtis HickmanWetland Studies and Solutions Inc.
PROJECT AREA
3
AtlanticOcean
Chesapeake Bay
Oceana Naval Base
City ofVirginia
Beach Limits
Lynnhaven River
MountTrashmore
Park
PROJECTAREA
N
TownCenter
4
Total Project Area – 2,600 Acres (8,500 Parcels)Windsor Woods – 1,300 Acres (3,700 Parcels)
Princess Anne Plaza – 1,100 Acres (3,800 Parcels)The Lakes – 185 Acres (1,000 Parcels)
Total Assessed Value – $2B
Windsor WoodsPrincess Anne
Plaza
TheLakes
▪ Flooded Homes and Property Damage
▪ Flooded Roads
▪Access Limited for:
o Emergency First Responders
oCity Maintenance Crews
oResidents
▪Areas Isolated until Flooding recedes
5
The Problem = Flooding
▪ Infrastructure is ± 50 years old (Built in 1960’s)
▪Area is Fully-Developed
▪ Existing storm drains are inadequate or non-existent
▪ Lack of storage
▪ Elevations in the area are low and flat
▪ Frequency & severity of storms is increasing
▪Area is tidally influenced
6
Why the Problem?
PROJECT AREA
Tidal Influence & Natural Drainage
Patterns7
PROJECTAREA
AtlanticOcean
Chesapeake Bay
N
City ofVirginia Beach
Limits
8
Risk Assessment Map
Sewells Point Tide Gauge Data
24-Hour Precipitation Return PeriodNorfolk Airport Rain Gauge (NOAA/NWS)
Hurricane Matthew
▪ Rainfall from Hurricane Matthew (Oct 2016) resulted in extreme flooding
▪ 800 Residences Reported Damage (Modeling approximates over 1,400)
▪ Many streets were impassable
▪ Flood Insurance Rates have significantly increased
11
Flooding from Hurricane Matthew (2016)
4412
Work Leading to the Tide Gate?
▪ Public Outreach and Involvement
▪ Windsor Woods Stormwater Management System Flood Mitigation Plan -CDM Smith - April 2018
▪ Final Windsor Woods Drainage Improvements PER –Michael Baker – September 2019
13
Overall Solutions
▪Gates to Block Incoming Tide
▪ Stormwater Pump Stations
▪Additional Storage
▪ Flood Barriers
▪ Storm Drains
14
15
Overall Preliminary Concept Plan(Recommended Infrastructure)
Lynnhaven P
kw
y
Lake
Windsor
Lake
Trashmore
Northgate Plaza
Ball Fields
POTENTIAL STORMWATER
STORAGE
NEW STORM DRAINS WILL BE
INSTALLED THROUGHOUTTHE PROJECT
AREA
POTENTIAL NORTH PUMP STATION,
TIDE GATE & BARRIER
LOCATION
WINDSOR WOODS PUMP STATION, TIDE GATE &
BARRIER LOCATION
POTENTIAL SOUTH TIDE GATE,
CHANNELS & BARRIER
LOCATION
Windsor Woods Tide Gate Project
16
▪ Windsor Woods Tide Gate Selected by City to Move Forward
o Tide Gate (60 feet wide; 4 bays)o Pump Station (750 cfs)o Barriers (100-year)
Gate Blocks Incoming Tide Stormwater Storage
Windsor Woods
17
Lake Trashmore
Natural Drainage Patterns
Windsor Woods
18
Tidal Impacts
Lake Trashmore
Windsor Woods19
Proposed Pump
Station
Proposed Tide Gate
Lake Trashmore
20
Proposed Barrier
Windsor Woods
Lake Trashmore
21
Windsor Woods Tide Gate & Pump Station Site
Lake Windsor
22
Windsor Woods Tide Gate & Pump Station Rendering
Lake Windsor
Windsor Woods Tide Gate Rendering
23
24
Windsor Woods Tide Gate & Pump Station Rendering
25
Windsor Woods Tide Gate & Pump Station Site
Lake Windsor
Lake Windsor
Lake Windsor
Mount TrashmoreSkatepark
Mount TrashmoreSkatepark
26
Lake Windsor – Ex. Conditions (Low Tide)
Water Level at Low Tide
Thalia Creek
Lake Windsor
High Tide –
Low Tide –
UPSTREAMDOWNSTREAM
Available Storage Capacity at Low Tide
Natural Flow of Drainage
27
Lake Windsor – Ex. Conditions (High Tide)
Water Level at Low Tide
Thalia Creek
Lake Windsor
Water Level at High TideHigh Tide –
Low Tide –
Tide Fills Available Storage
Incoming Tide
UPSTREAMDOWNSTREAM
28
Lake Windsor – Ex. Conditions During Storm
Lake WindsorThalia
Creek
UPSTREAMDOWNSTREAM
Storage Capacity Exceeded Quickly and Flooding Occurs
Low Tide –
High Tide –
Water Level at Low Tide
Water Level at High Tide
29
Lake Windsor – After Tide Gate Installation(Post-Improvements)
Water Level at Low Tide Lake
Windsor
Water Level at High Tide
Tide Gate in the Open Position
Normal Water LevelHigh Tide –
Low Tide –
UPSTREAMDOWNSTREAM
Thalia Creek
30
Lake Windsor – After Tide Gate Installation(Post-Improvements)
Water Level at Low Tide
Lake Windsor
Tide Gate in the Closed Position
High Tide –
Thalia Creek
UPSTREAMDOWNSTREAM
Low Tide –
Storage Now Available Since Tidal Influence Eliminated
31
Lake Windsor – After Gate & Pump Installed
Lake Windsor
Tide Gate and Pump Station In
Operation
High Tide –
UPSTREAMDOWNSTREAM
Pumps Used to Maintain Water
Levels Behind Gate
Additional Storage Created
by Pump Drawdown
Low Tide –
Thalia Creek
Regulatory
Pump Station
Storage(Water Quality)
Gates & Barriers
Storm Drain Network
Key Program Components
Regulatory Permitting
33
▪ Permitting o Corps and DEQ Individual Permits
o Early Regulatory Coordination and Agency Involvemento Public Outreach and Buy Ino Alternatives Evaluation – Couldn’t Have Found a Better Site
▪ Aquatic Life o Frequency and Duration of Closureo Maintenance of Low Flow o Intake Structures – Entrainment
This is a Great Site for LEDPA!!!
34LEDPA – Least Environmentally Damaging Practicable Alternative
Fish Passage - Frequency and Duration of Closure
▪ Typically open during “Sunny Day” conditions
▪ Closed ~5-8 times a year
▪ ~24 to 48-hour pre-storm pump down
35
Maintenance of Low Flow - Aquatic Life
36
Intake Structures - Entrainment
37
Intake Structures
38
39
All Permits Received
▪ USACE and DEQ Individual Permits Issued
▪ No VMRC Permit Required
▪ A separate permit will be necessary for the larger pump.
▪ And the process starts again!
Future Permits
40
Summary/Take-Aways
▪ Tide gate is the first project in this multi-faceted Long-term Program
▪ Permitting is Critical for Large Water Dependent Projects
▪ Regulatory Coordination needs to be Integral in Planning Process
▪ Public Involvement/Buy-In Important
▪ Pre-Storm Planning & Preparation is Critical
▪ Long-Term Operation & Maintenance Required
▪ Construction Anticipated Spring 2021