Windsor Utilities Commission Capital Plan 2015. Spencer Johnston Enwin, Water Engineering 2.

14
Windsor Utilities Commission Capital Plan 2015

Transcript of Windsor Utilities Commission Capital Plan 2015. Spencer Johnston Enwin, Water Engineering 2.

Windsor Utilities Commission Capital Plan 2015

Spencer JohnstonEnwin, Water Engineering

2

3

CAPITAL BREAKOUT 2015

2015 Capital Breakout

New Reservoir Project $10,550,000

Watermain Projects $14,308,000

Metering Projects $1,264,000

Water Treatment Facilities $1,534,000

Transmission and Distribution Projects $540,000

Engineering Projects $28,000

Water Capital Subtotal $28,224,000

District Energy Projects $70,000

Total WUC Capital $28,294,000

37.30%

50.60%

4.50% 5.40%1.90%

0.05% 0.25%

WUC Capital Breakdown - 2015 Spending

New ReservoirWatermain ProjectsMetering ProjectsWater Treatment FacilitiesTransmission and Distribu-tion ProjectsEngineering ProjectsDistrict Energy Projects

4

20052006

20072008

20092010

20112012

20132014

2015*2016

20172018

20192020

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

Capital Spending (2005-2020)

Capital Spending

(000

's)

WUC CAPITAL SPEND

5

PROPOSED 2015 WATERMAIN SYSTEM RENEWAL PROGRAM

GRAND TOTAL $14.3 Million2015 WATERMAIN RENEWAL PROGRAM

TOTAL SEWER / ROAD PROJECTS $ 2.8 Million

TOTAL ROAD OPERATIONS PROJECTS $ 8.5 Million

TOTAL WUC PRIORITY PROJECTS $ 3.0 Million

6

PROPOSED WUC PRIORITY PROJECTS

Street Location 2015 Capital Budget

Victoria Ellis to JacksonCurry Riverside to WyandotteJosephine Wyandotte to Cul-de-sacBenjamin Shepherd to Tecumseh

TOTAL WATERMAIN $3.0 MillionWUC PRIORITY PROJECTS

7

WINDSOR UTILITIES COMMISSION PROPOSED - OPERATIONS PROGRAM

Street Location 2015 Capital Budget

Church Wyandotte to CarolineNewbury Dougall to BruceCaroline Dougall to JanetteWyandotte E George to RaymoHenkel George to WyandotteWyandotte W Caron to OuelletteWellington Wyandotte to CollegeWindsor Wyandotte to Erie

Mercer Giles to Erie

8

WINDSOR UTILITIES COMMISSION PROPOSED - OPERATIONS PROGRAM

Street Location 2015 Capital Budget

Hall Wyandotte to GilesMoy Wyandotte to GilesMoy Shepherd to TecumsehWoodward Seymour to FosterPelletier Campbell to Partington

TOTAL WATERMAIN $8.5 MillionROAD OPERATIONS PROJECTS

9

WINDSOR UTILITIES COMMISSION PROPOSED – SEWER/ROAD PROGRAM

Street Location 2015 Capital Budget

Edward Wyandotte to EdgarElm/Erie Giles to TecumsehFairview St. Rose to EdgarVillaire Raymond to EdgarRossini Seminole to CNRKing Prince to SouthJos St. Louis Rose to Cul-de-sacMcDougall Logan to CPRTOTAL WATERMAIN $2.8 MillionSEWER/ROAD PROJECTS

10

WINDSOR UTILITIES COMMISSION ADDITIONAL/ENHANCED PROJECTS

Street Location 2015 Capital Budget

GRAND TOTAL $14.3 Million2015 WATERMAIN RENEWAL PROGRAM

11

WINDSOR UTILITIES COMMISSION NEW RESERVOIR

New Reservoir Total Project Cost = $30M

Rehabilitation of Existing Reservoir = $3.0M

TOTAL = $33M

12

WINDSOR UTILITIES COMMISSIONPRELIMINARY SCHEDULE - NEW RESERVOIR

Spring/Summer 2014 • Completed Municipal Class EA

Winter/Spring 2015 • Design & Approvals

Summer 2015 • Tendering & Contract Award

Fall 2015 • Construction

Winter 2016/17 • Commissioning of New Reservoir

Summer 2017 • Rehabilitation of Existing Reservoir

Questions??