Wind Power
![Page 2: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/2.jpg)
![Page 3: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/3.jpg)
Wind Installed in Ireland
Source: EirGrid
![Page 4: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/4.jpg)
Projected installed capacity of wind in Ireland by 2020
Source: www.cer.ie CER/08/260 16th Dec 2008
![Page 5: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/5.jpg)
Does Ireland have highest wind penetration in the world ?
US EU China India UK Nordic Ireland
Figures for end of 2007 in most casesSource: Global wind energy outlook 2008, www.eia.doe.gov , EirGrid, UK National Grid, NORDEL, Eurelectric
![Page 6: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/6.jpg)
Does Ireland have highest wind penetration in the world ?
Figures for end of 2007 in most casesSource: Global wind energy outlook 2008, EirGrid, UK National Grid, NORDEL, Eurelectric
UCTE Nordic UK Ireland
![Page 7: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/7.jpg)
Annual new wind capacity installed by region
Source: Global wind energy outlook 2008
![Page 8: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/8.jpg)
UK projections
Source: www.national grid.com, seven year
![Page 9: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/9.jpg)
Wind forecasting
Source: Bernhard Hasche
![Page 10: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/10.jpg)
Wind forecasting
Source: P. Pinson
![Page 11: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/11.jpg)
Extreme Sag?!
![Page 12: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/12.jpg)
Research in Wind IntegrationWhy could Ireland lead the world ?
![Page 13: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/13.jpg)
![Page 14: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/14.jpg)
![Page 15: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/15.jpg)
![Page 16: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/16.jpg)
![Page 17: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/17.jpg)
Research in Wind IntegrationWhy could Ireland lead the world ?
Europe
588,000MW
Nordic
85,000MWUK
78,000MWIreland
8,100MW
Didn’t update these - see newly added slides at start of presentation
![Page 18: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/18.jpg)
Does Ireland have highest wind penetration in the world ?
Wind Capacity as a % of Installed Generation Capacity
7.28% 5.28%
7.58%
19.70%
1.08%1.52%
0%
5%
10%
15%
20%
25%
30%
35%
40%
UK Nordic Ireland Europe
Operational Contracted Applications
Didn’t update these - see newly added slides at start of presentation
![Page 19: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/19.jpg)
Renewable Resources
![Page 20: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/20.jpg)
Renewable ResourcesCost
Volume
![Page 21: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/21.jpg)
The winner: Wind !
![Page 22: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/22.jpg)
Wind installed worldwide
![Page 23: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/23.jpg)
Wind Power
![Page 24: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/24.jpg)
Why Wind Power
• Hydro is mostly fully developed and can have negative environmental impact
• Most viable form of renewable energy - economics • Good resource
– On land– Off shore
• Alternatives– Wave, photovoltaic, tidal, geothermal – technically challenging
and/or uneconomic– Biomass – economically marginal – space requirements
![Page 25: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/25.jpg)
Extraction of Wind Energy
• Comes from sun - 174,423 TW
• How many hours is the energy equivalent to Ireland’s electrical energy consumption ?
• Less than 2% of radiated solar power converted into wind power
• Varies, difficult to predict
![Page 26: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/26.jpg)
• Assume all kinetic energy is converted, power of wind calculated by product of mass flow rate with
• Continuity equation states• Total available power becomes
• In wind turbine, total available energy cannot be recovered – would require wind to stop completely, no flow through turbine
• - performance coefficient
wm2
2wv
w wm v
31
2w wP Av
pC
Energy capture efficiency
![Page 27: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/27.jpg)
Energy capture efficiency
• For a wind turbine maximum• max = 0.59 • Generator and gearbox efficiency
• Ng = generator efficiency 80% or possibly more for a permanent magnet generator or grid-connected induction generator)
• Nb = gearbox/bearings efficiency (depends, could be as high as 95% if good)
pC
pC
31
2captured g b pP N N AC v
![Page 28: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/28.jpg)
![Page 29: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/29.jpg)
![Page 30: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/30.jpg)
3
3 3
6 1 44 4
18 3 27P MW
31
2captured g b pP N N AC v
Question
A 4MW wind turbine generator has a cut in speed of 4 M/s and reaches its maximum power output at 18 M/s.
What is its power output at (a) 2 M/s(b) 6 M/s(c) 20 M/sIf the blade diameter was increased by 10 % recalculate the power output at 6M/s.
Solution
(a) 0 MW(b) We know power output at 18 M/s is 4MW at 1/3 speed i.e. 6 M/s all
other things being equal then as the relationship is cubic wrt speed then.
(c) At 20 M/s it is maxed out at 4MW – and may actually have cut out
If we increase the blade diameter by 10% we increase the cross sectional area A by (1.1)2 = 1.21 i.e. 21 % -
41.21*
27P MW
![Page 31: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/31.jpg)
Harvesting: Supply demand balance
![Page 32: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/32.jpg)
Harvesting renewables in Ireland
![Page 33: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/33.jpg)
Consumer “demand” is a moving target
DAILY LOAD CURVES
2000
2500
3000
3500
4000
4500
5000
5500
00
:00
01
:00
02
:00
03
:00
04
:00
05
:00
06
:00
07
:00
08
:00
09
:00
10
:00
11
:00
12
:00
13
:00
14
:00
15
:00
16
:00
17
:00
18
:00
19
:00
20
:00
21
:00
22
:00
23
:00
TIME
MW
19-Dec-06
18-Jul-06
![Page 34: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/34.jpg)
Some Engineering: System Frequency Control
DAILY LOAD CURVES
2000
2500
3000
3500
4000
4500
5000
5500
00
:00
01
:00
02
:00
03
:00
04
:00
05
:00
06
:00
07
:00
08
:00
09
:00
10
:00
11
:00
12
:00
13
:00
14
:00
15
:00
16
:00
17
:00
18
:00
19
:00
20
:00
21
:00
22
:00
23
:00
TIME
MW
19-Dec-06
18-Jul-06
System Frequency Demand
Supply
Storage is €€€€€€
![Page 35: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/35.jpg)
Demand
Supply
System Frequency
Frequency control: Ireland
DAILY LOAD CURVES
2000
2500
3000
3500
4000
4500
5000
5500
00
:00
01
:00
02
:00
03
:00
04
:00
05
:00
06
:00
07
:00
08
:00
09
:00
10
:00
11
:00
12
:00
13
:00
14
:00
15
:00
16
:00
17
:00
18
:00
19
:00
20
:00
21
:00
22
:00
23
:00
TIME
MW
19-Dec-06
18-Jul-06
![Page 36: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/36.jpg)
Wind Variability
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00
Half-hour
Win
d O
utp
ut
Day 5Day 13Day 14Day 15Day 26
![Page 37: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/37.jpg)
Wind Power Forecasting
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
0 100 200 300 400Distance (km)
Corr
Coeff
0
0.05
0.1
0.15
0.2
0.25
0.3
0 6 12 18 24Forecast Horizon (hours)
Std
. D
ev.
of
For
ecas
t E
rror
![Page 38: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/38.jpg)
Frequency Variations due to Wind
Frequency
49.75
49.8
49.85
49.9
49.95
50
50.05
50.1
50.15
50.2
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 6600 7200 7800 8400 9000 9600
Time, sec
Hz
29-Sep-06 06-Oct-06
![Page 39: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/39.jpg)
Blackout: Italy (5 % decline in system frequency)
![Page 40: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/40.jpg)
3100
3200
3300
3400
3500
3600
3700
09:51:21 09:52:06 09:52:51 09:53:36 09:54:21 09:55:06 09:55:51
Time
MW
48.8
49
49.2
49.4
49.6
49.8
50
50.2
Hz
SYSTEM GENERATION RESERVE
FREQUENCY
Frequency control & reserve
![Page 41: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/41.jpg)
Research Question
With large wind penetrations how much additional reserve is required to operate
the power system ?
![Page 42: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/42.jpg)
Conceptual challenge
Wind Variation and Forecast Information
Load Variation and Forecast Information
Conventional GenerationInformation and OutageProbabilities
Required SystemReliability
Willingness toPay for Reliability
Probabilistic Calculations
, ,1 1 ,
,, , ,
1 1 1 ,
, ,1
1 1 1
1 1 1
1
G Gh
h i h i hi i total h
G GGh i h
i h j h j hi j j total h
j i j i
G
i h j hj
RPLSNO FOP POP
R PnafoFOP FOP POP
POP FOP
,,
1 1 ,
1 1GG
h i hj h
i j total hj i
R PnapoPOP
1,
2,
1, 2, ,
,
1,
2,
1, 2, ,
,
1:, ,.........
2:
1:, ,.........
2:
h h
h h
h h h h G h
G h h
h h
h h
h h G h
G h h
PLSFO PLSNO
PLSFO PLSNO
S PLSNO Hr FOP FOP FOP
PLSFO PLSNO
PLSPO PLSNO
PLSPO PLSNO
Hr POP POP POP
P
PL
LSPO PLSNO
System Reserve Requirements
Doherty, R. and O’Malley, M.J., “New approach to quantify reserve demand in systems with significant installed wind capacity”, IEEE Transactions on Power Systems”, Vol. 20, pp. 587 -595, 2005.
ILEX Energy, UCD, QUB and UMIST, “Operating reserve requirements as wind power penetration increases in the Irish electricity system”, Sustainable Energy Ireland, 2004.
![Page 43: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/43.jpg)
Forecast errors
0%
2%
4%
6%
8%
10%
12%
14%
16%
18%
20%
0 MW 200MW
400MW
600MW
800MW
1000MW
1200MW
1400MW
1600MW
1800MW
2000MW
Installed Wind Capacity
Sta
nd
ard
dev
iati
on
of
win
d e
rro
r
Fast (1.25 min)
Slow (30 min)
1 Hour
4 Hour
![Page 44: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/44.jpg)
Reserve targets
ILEX Energy, UCD, QUB and UMIST, “Operating reserve requirements as wind power penetration increases in the Irish electricity system”, Sustainable Energy Ireland, 2004.
250 MW
300 MW
350 MW
400 MW
450 MW
500 MW
550 MW
600 MW
650 MW
0 200 400 600 800 1000 1200 1400 1600 1800 2000
Re
ser
ve
Ta
rge
t
Installed Wind capacity (MW)
Fast (1.25 min)Slow (30 min)1 hour4 hour
![Page 45: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/45.jpg)
Wind Capacity Credit
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0 500 1000 1500 2000 2500 3000 3500Wind Capacity (MW)
Cap
acity
Cre
dit
![Page 46: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/46.jpg)
Gas Turbines NOx
Lean Premix
![Page 47: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/47.jpg)
Wind power and emissions
Denny, E., and O’Malley, M.J., “Wind Generation, Power System Operation and Emissions Reduction” IEEE Transactions on Power Systems”, Vol. 21, pp. 341 – 347, 2006.
![Page 48: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/48.jpg)
Portfolio Diversification: Plant mix
![Page 49: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/49.jpg)
Is large scale storage a solution for wind ?
Research Question
![Page 50: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/50.jpg)
Storage Economics Case # 1
850MW Wind, Capital cost storage, € 0 million/MWh
0
50
100
150
200
0 5000 10000 15000 20000 25000 30000 35000
MWh Storage
Pro
fit
€mill
ion
![Page 51: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/51.jpg)
Storage Economics Case # 2
850MW Wind Capital Cost storage €0.1Milion/MWh
-150
-100
-50
0
50
100
150
0 5000 10000 15000 20000 25000 30000 35000
MWh Storage
Pro
fit
€m
illi
on
![Page 52: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/52.jpg)
Storage Economics Case # 3
850MW Wind, Capital cost storage, € 0.5 million/MWh
-1400
-1200
-1000
-800
-600
-400
-200
0
200
0 5000 10000 15000 20000 25000 30000 35000
MWh Storage
Pro
fit
€m
illio
n
![Page 53: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/53.jpg)
Turbines & pumpsTurbines & pumps
Upper reservoirUpper reservoir
Lower reservoirLower reservoir
Electrical energy stored as water at a height
Used for limited energy storage Limited resource Very fast reaction time
Pumped Storage (Turlough hill)
![Page 54: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/54.jpg)
Research QuestionWill the slow inertial response
characteristics of wind turbine generators impact future power systems adversely?
![Page 55: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/55.jpg)
Fixed speed wind turbine generator
Doubly fed inductiongenerator wind turbine
Synchronous generator
Does not add to system inertia
Mullane, A. and O’Malley, M.J., “The inertial-response of induction-machine based wind-turbines”, IEEE Transactions on Power Systems, Vol. 20, pp. 1496 – 1503, 2005.
Frequency
![Page 56: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/56.jpg)
Frequency response
Lalor, G ., Ritchie, J., Flynn, D. and O’Malley, M.J., “The Impact of Combined Cycle Gas Turbine Short Term Dynamics on Frequency Control”, IEEE Transactions on Power Systems”, Vol. 20, pp. 1456 - 1464, 2005.
Lalor, G., Mullane, A., and O’Malley, M.J., “Frequency Control and Wind Turbine Technologies”, IEEE Transactions on Power Systems”, Vol. 20, pp. 1903 – 1913, 2005.
![Page 57: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/57.jpg)
Harvesting: Network Issues
![Page 58: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/58.jpg)
The Network Challenge
GeneratorsDemand
110kV
220kV
275kV
400kV
Interconnector
![Page 59: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/59.jpg)
Network protests
![Page 60: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/60.jpg)
A
B
C
Network Planning
![Page 61: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/61.jpg)
Research QuestionWith large quantities of distributed
generation how do we use the existing networks in an optimal manner ?
![Page 62: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/62.jpg)
Maximizing network as energy harvesting device
38kV 7 Bus Test System
1
max
[ (1 ) (1 )]
100 10%. ( )
.
.
N
DGi ji LDi jij
i i
Geni
i
Installed i DGi Avail i
Max P P
subject to
V V
P
SCL Cos
P P P
etc
i N
Constrained optimization problem
Keane, A and M.J. O’Malley, “Optimal Allocation of Embedded Generation on Distribution Networks”, IEEE Transactions on Power Systems”, Vol. 20, pp. 1640 - 1646, 2005.
![Page 63: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/63.jpg)
15.50
19.74
41.00
0
5
10
15
20
25
30
35
40
P (
MW
)
Optimal 0.5%
curtailment
Base case 0%
curtailment
Optimal 0%
curtailment
Keane, A and M.J. O’Malley, “Optimal Allocation of Embedded Generation on Distribution Networks”, IEEE Transactions on Power Systems”, Vol. 20, pp. 1640 - 1646, 2005.
Keane, A. and M. J. O’Malley, “Optimal utilisation of distribution networks as energy harvesting devices”, IEEE Transactions on Power Systems”, Vol. 22, pp. 467 – 475, 2007.
Maximizing network as energy harvesting device
![Page 64: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/64.jpg)
Supply demand balance: Why curtail wind ?
MW
Time
Night time Demand
“Must run level”
Wind generation + “must run level”
System Operator
Must curtail this wind to keep supply demand balance
![Page 65: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/65.jpg)
Economics of Grid Integration Studies
![Page 66: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/66.jpg)
What is the optimal amount of grid connected wind energy ?
Research Question
![Page 67: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/67.jpg)
Costs and Benefits of Wind Power
Costs• Capital costs – economies of scale• Operation and Maintenance• Network Upgrade Costs • Reserve Cost• Cycling Cost
Benefits• Capacity• Emissions• Fuel saving
![Page 68: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/68.jpg)
Net Benefits
5% of System Operating Costs
Denny, E. and O’Malley, M.J. “Quantifying the Total Net Benefits of Grid Integrated Wind”, IEEE Transactions on Power Systems, Vol. 22, no. 2, pp. 605 -615, 2007.
![Page 69: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/69.jpg)
All Island Renewable Grid Study
![Page 70: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/70.jpg)
Joint Steering Group• DETI, DCMNR, CER, NIAUR
Governance
Working Group•Dept. CENR•Dept. ETI•CER•Niaur•System Operator NI•EirGrid•Sustainable Energy Irl•Action Renewables•MO’M
Peer Review
Consultants•ESBI•Riso et al.•TNEI et al.•Ecofys
Appointment
![Page 71: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/71.jpg)
WS1: Resource
WS2B: Supply Demand Balance
WS3: Network
WS4: Economic
Portfolio scenarios
Costs
Emissions savings
Stakeholder impact
WS2A: Screening
Geo-spread scenarios Costs
All-Island Renewable Grid Study- Overview
Worksteam (WS)
![Page 72: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/72.jpg)
WS2A: Optimal renewable penetration
0
20
40
60
80
100
234567891011120
10
20
30
40
50
60
Carbon Price (€/Ton CO2)Gas Price (€/GJ)
Opt
iam
l Pen
etra
tion
of R
enew
able
Ene
rgy
(%)
Renewable Penetration
![Page 73: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/73.jpg)
Portfolio 4
Gas Price – High
Carbon Price – Mean
WACC – Mean
Wind Costs – Normal
RE Benefits – 5 €/MWh
.Doherty, R and M.J. O’Malley, “Establishing the role that wind generation may have in future generation portfolios”, IEEE Transactions on Power Systems”, Vol. 21, pp. 1415 – 1422, 2006.
![Page 74: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/74.jpg)
Concluding Remarks
![Page 75: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/75.jpg)
Research in Wind IntegrationWhy could Ireland lead the world ?
Europe
588,000MW
Nordic
85,000MWUK
78,000MWIreland
8,100MW
![Page 76: Wind Power. Wind Installed in Ireland Source: EirGrid.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e0e5503460f94af834b/html5/thumbnails/76.jpg)
Does Ireland have highest wind penetration in the world ?
Wind Capacity as a % of Installed Generation Capacity
7.28% 5.28%
7.58%
19.70%
1.08%1.52%
0%
5%
10%
15%
20%
25%
30%
35%
40%
UK Nordic Ireland Europe
Operational Contracted Applications