Wind Power Technician
Helge Larsen November 2011Head of Operation & Maintenance
What’s so special about that?
![Page 2: Wind power trade competency 2011](https://reader033.fdocuments.us/reader033/viewer/2022061121/546f2cbbb4af9f0e0c8b4604/html5/thumbnails/2.jpg)
European Wind Resources
Color Sheltered Open Terain At Coastal Open Sea Hills & ridges
![Page 3: Wind power trade competency 2011](https://reader033.fdocuments.us/reader033/viewer/2022061121/546f2cbbb4af9f0e0c8b4604/html5/thumbnails/3.jpg)
Wind Turbine Development 1980 - 2010
• Turbines >3MW will be common in the near
future
• Turbines have doubled in size every 5 years
• Limiting reasons are logictics and local
consequences around wind farms
• * The effect of learning is estimated to result
in a 9-17 % reduction in O&M costs each
time installed capacity in Europe is doubled
Note* Source: EWEA – European Wind Energy Association
Increase in MW per turbines period 1985-2005
![Page 4: Wind power trade competency 2011](https://reader033.fdocuments.us/reader033/viewer/2022061121/546f2cbbb4af9f0e0c8b4604/html5/thumbnails/4.jpg)
EU Climate Goals of 2009
• A reduction in EU greenhouse gas emissions of at least 20% below 1990 levels
• 20% of EU energy consumption to come from renewable resources
• A 20% reduction in primary energy use compared with projected levels, to be achieved by improving energy efficiency
innen2020
20%20%
20%
20% Improving energy efficiency
20% Consumption to come from renewable resources
20% reduction in CO2 emissions
20 20 20 - 2020
![Page 5: Wind power trade competency 2011](https://reader033.fdocuments.us/reader033/viewer/2022061121/546f2cbbb4af9f0e0c8b4604/html5/thumbnails/5.jpg)
High expectations of employment within rewnewable energy industry
• Approaching 2020 EU *1 estimates a doubling in workplaces within the renewable power section to a total of 2,8 millions
• EU in 2007, employed 108 600 *2 in the wind power industry alone - 150 000 if counting indirect jobs
• Denmark, Germany and Spain accounts for 77%
• The Wind Industry in EU will employ near 330 000 workers in 2020, according to EWEA *2
• 37 nye arbeidsplasser daglig
0
1 000
2 000
3 000
2007 2020
Fornybart
Vind
Note: 1) Source: European Commission, Directorate General for Energy and Transport2) Source: EWEA – European Wind Energy Association – ”Wind at work” – based on a scbeanrio with 180 GW wind installed in EU in 2020
Total jobs in EU renewable- and wind industry, if EU reaches the 20-20-20 goals Jobs, in thousands
Germany as an example38 000 directly employed in the wind industry in 2007 and 84300 directly and indirectly (suppliers, sub suppliers and service companies) and total of 250 000 in the renewable sector. According to a BMU study the total renewable sector will increase to 400 000 in Germany by 2020.
2,8 millioner
1,4 millioner( 2005)
Germany155 000330 000
![Page 6: Wind power trade competency 2011](https://reader033.fdocuments.us/reader033/viewer/2022061121/546f2cbbb4af9f0e0c8b4604/html5/thumbnails/6.jpg)
Personal Experiences
• Sea West Wind Power was the leading US company, both in project development and operation of wind farms
• With more sophisticated technology in wind turbines came the need for specialized competency in the technical staff
• From 2001 implemented an in-house training system based on 2 years of specialized cources
• Resulted in significant improvement in the wind farm operation efficiency
• Dramatically reduced the number of accidents
![Page 7: Wind power trade competency 2011](https://reader033.fdocuments.us/reader033/viewer/2022061121/546f2cbbb4af9f0e0c8b4604/html5/thumbnails/7.jpg)
What’s special about wind power?
• We work in teams of 2oComplement one anothero Safety - Communication
• Work environmentoClimate challengesoHigh stress leveloDangerous operations
A 150 MW Wind Farm consists of 50-70 Power Plants!
![Page 8: Wind power trade competency 2011](https://reader033.fdocuments.us/reader033/viewer/2022061121/546f2cbbb4af9f0e0c8b4604/html5/thumbnails/8.jpg)
Educational Challenges
Wind PowerTechnician
Electrical
Mechanical
Cont
rol/S
CADA
Too specialized
lesson plans
We need cross competency!
What about how-to-dos and Safety?
![Page 9: Wind power trade competency 2011](https://reader033.fdocuments.us/reader033/viewer/2022061121/546f2cbbb4af9f0e0c8b4604/html5/thumbnails/9.jpg)
The Wind Turbine TechnicianExperience makes perect….
• The first 2 years of the “Wind Power Technician” program could, with some specific adjustments, be one of the existing trades leading to a 3rd year specifically oriented towards wind turbines
• The third year needs to focus on the wind technician competency needs; electrical/mechanical – mechanical/SCADA – SCADA/electrical
How-to-dos• In a wind farm there is a clear O&M divide between turbines and
infrastructure where specialized high voltage competency is required• The work environment is subject to weather conditions requiring specific HSE
needs• Hydraulic systems and tools are both complex and can be dangerous and the
student needs to have a good understanding of this• Working in heights and under great stress is a common work situation for a
wind power technician
![Page 10: Wind power trade competency 2011](https://reader033.fdocuments.us/reader033/viewer/2022061121/546f2cbbb4af9f0e0c8b4604/html5/thumbnails/10.jpg)
TODAY’S WINNERS –YESTERDAY’S DREAMERS