Turbine N100 2.5MW
DESCON WIND FARM PROJECT It is a 150 MW project (METRO, YUNUS, GUL AHMED) with 60 turbines. Each turbine has a capacity of 2.5 MW .
Equipment detail
Stationary equipment N100 R80 MT 5.1
Tower bottom section Height :-16.51 m / Weight :- 63.8 Ton
Tower Mid 0ne section Height :-20.86 m / Weight :- 58.2 Ton
Tower Mid Two section Height :-17.88 m / Weight :- 36.9 Ton
Tower Top section Height :-21.66 m / Weight :- 31.3 Ton
Rotary Equipment
Nacelle (N 100) Weight :- 53 Ton
Drive train Weight :- 41.5 Ton
Hub Weight :- 27.5 Ton
Blades Weight :- 9.8 x 3 = 29.4 Ton
STARTED FROM HERE
02
COMPLETED FOUNDATION WORK
NOW ITS TIME TO MOVE ON TO THE NEXT LEVELTRANSPORTATION OF THE EQUIPMENT
AT PORT QASIM
RECEIVED AT SITE
ERECTION OF PAKISTAN'S FIRST 2.5 MW WIND TURBINEN 100
ERECTION OF TOWER SECTION MID 0NE
ERECTION OF MID 2
ERECTION TOP SECTION
ERECTION OF NACELLE
ERECTION OF DRIVE TRAIN
ASSEMBLING OF STAR
STAR ERECTION
STAR ERECTION
STAR ERECTION
COMPLETED THE ERECTION FIRST TURBINE AT WTG # 17