148 STREET WATER MAIN PROJECT
FRASER RIVER
HIJORTHROADPARK
GUILDFORDHEIGHTS
PARK
GREEN TIMBERSPARK
HAWTHORNEPARK
ROBINPARK
GREEN TIMBERS GREENWAY
IQRA ISLAMIC SCHOOL
ELLENDALEELEMENTARY
ÉCOLERIVERDALE
ELEMENTARY
GUILDFORD PARKSECONDARY
MARY JANESHANNON
ELEMENTARY
HOLLYELEMENTARY
GUILDFORDRECREATION
CENTRE
HIJORTH ROADELEMENTARY
BONACCORDELEMENTARY
MOUNTAINVIEWMONTESSORI
JOHNSTON HEIGHTSSECONDARY
WILLIAM F. DAVIDSON
ELEMENTARY
GUILDFORDTOWN CENTRE
AE EEEE RRRS GREENWAYGRSS YY
SDD
TEI HTGHHHTOFO
SR
NNA
CN THORNTON YARD
108A Ave
111 Ave
111A Ave
Port Mann Bridge
South Fraser Perimeter Rd
116A Ave
King Rd
Grosvenor R
d
McBride Dr
148 St
Wallace Dr
Ellen
dale
Dr
108 Ave
106 Ave
105A Ave
107 Ave
106A Ave
Ferguson Div
Guildford Dr
152 St
150 St
105 Ave
149 St
146 St
144 St
104A Ave
143 St
104 Ave
148 St
100 Ave
Halstead Pl
103A Ave
103 Ave
101 Ave
102A Ave
144 St
98 Ave
96 AveFraser Hwy
152 St
95A Ave
94 Ave
109 Ave
148A St
141 St
Wellington Dr
St Andrews Dr147A
St110 Ave
146 St
112 Ave
115A Ave
116 Ave
Surrey Rd
140A St
141A
St
115 Ave
142 St
Blackbird Cr
97 Ave
150 St
148A St
151 St
95 Ave
99A Ave
154 St
Port Mann Bridge
Trans Canada Highway
South Fraser Perimeter Rd
116A Ave
King Rd
Grosvenor R
d
McBride Dr
148 St
Wallace Dr
Ellen
dale
Dr
108 Ave
108A Ave
106 Ave
105A Ave
107 Ave
106A Ave
Ferguson Div
Guildford Dr
152 St
150 St
105 Ave
149 St
146 St
144 St
104A Ave
143 St
104 Ave
148 St
100 Ave
Halstead Pl
103A Ave
103 Ave
101 Ave
102A Ave
144 St
98 Ave
96 AveFraser Hwy
152 St
95A Ave
94 Ave
109 Ave
148A St
141 St
Wellington Dr
St Andrews Dr147A
St110 Ave
146 St
112 Ave
115A Ave
116 Ave
Surrey Rd
140A St
141A
St
115 Ave
142 St
Blackbird Cr
97 Ave
150 St
148A St
151 St
95 Ave
99A Ave
154 St
111A Ave
111 Ave
148 Street Water Main:Whalley Section
Existing Whalley Reservoir
Future Connection to Whalley Reservoir
148 Street Water Main:Port Mann Section
Existing Water Main
Existing Water Main
CITY OFSURREY
Underground Valve Chambers
Underground Valve Chambers
WATER
148 STREET WATER MAIN PROJECT
Project Activities
Project Details
Typical construction activities include:
• Installing a new water main that runs parallel to an existing water main
• Installing new underground valve chambers
• Connecting the new water main to the existing water distribution system
HoursGenerally between 7 AM and 7 PM Monday to Saturday (May require some bylaw variances)
Port Mann Section (North)
Whalley Section (South)
Timeline: Winter 2018 to Spring 2021 Spring 2019 to Spring 2021
Length of Water Main: 3 km 2 km
Pipe Diameter: 1.5 m 1.5 m
Location: Between the Whalley Reservoir at 104A Avenue to Surrey Road
and 115 Avenue
Between 105 Avenue and Green Timbers Greenway
on 148 Street
Valve Chambers:
Two locations:
• 111 Avenue and Wallace Drive
• 105A Avenue and 148 Street
Two locations:
• South of 100 Avenue and 148 Street
• North of Green Timbers Greenway and 148 Street
HOW BIG IS THE WATER MAIN?There are all different sizes of water mains in our region’s distribution system, but the water main being installed for this project is approximately 1.5 metres in diameter.
New Water Main 1.5 m
(approximately 5')
Person Height 1.8 m
(approximately 6')
WATER
148 STREET WATER MAIN PROJECT
Minimizing Construction ImpactsTo minimize the impacts of this essential water main’s construction activities, Metro Vancouver contractors and crews must:
Use newer, low-emission vehicles and generators
Water or sweep the road to control dust
Monitor the discharge of groundwater from trench excavation
WATER
148 STREET WATER MAIN PROJECT
Keeping Traffic Moving Safely and EfficientlyMetro Vancouver is committed to minimizing the impacts to traffic and access during construction of this essential water infrastructure project.
Whenever possible, regular traffic patterns and parking will be restored at the end of each day. Detour routes and ongoing schedule and information updates will be communicated through:
• On-site signage
• Traffic control personnel
• Public notifications
• The Metro Vancouver website
Bike: The bike lane along 148 Street may be closed in sections of the water main route during active construction. In most areas, bikes will be accommodated on the street.
Pedestrian: Sidewalk access will generally be maintained during construction. Crosswalks, and occasionally one side of the sidewalk, may be closed intermittently during construction.
Bus: Bus stops along the construction route affected by road closures will be temporarily moved. Closer to construction, Coast Mountain Bus Company will provide locations of temporary bus stops and any needed route detours. Please see www.translink.ca/Schedules-and-Maps/Alerts for updates.
Motor Vehicle: As construction progresses, sections of 148 Street will be intermittently closed to all traffic. Pedestrian access to parking in the surrounding area will be maintained.
Driveway Access: There may be instances where access to a particular driveway or road is temporarily restricted. Advance notification will be provided to affected residents and businesses should a temporary access restriction occur.
Residents with mobility issues should speak to a Metro Vancouver team member to ensure any home or community access is not disrupted.