William Calder Asset Maintenance Manager, Kelvin Power ... · PDF fileAudit of Maintenance...
Transcript of William Calder Asset Maintenance Manager, Kelvin Power ... · PDF fileAudit of Maintenance...
HISTORY OF KELVIN POWERHISTORY OF KELVIN POWERHISTORY OF KELVIN POWERHISTORY OF KELVIN POWER
1950’S: City of Johannesburg
A STATION (11 Boilers & 6 Turbines)
1960’S: City of Johannesburg
B STATION (7 Boilers & 7 Turbines)
AUG 2001: AES - Privatisation
MAR 2003: GLOBELEQ purchased from AES
MAR 2006: GLOBELEQ retirement
AUG 2007: KELVIN POWER CONSORTIUM PURCHASE
BACKGROUND
• KELVIN POWER STATION – Two Separate power stations
• “A” STATION - x6 off 30MW Turbo Generatorsx11off 85 Ton/hr Boilers
• “B” STATION - x7 off 60MW Turbo Generatorsx7 off 250 Ton/hr Boilers
• FUEL – Coal from separate coal stockpiles
• COMMON – High voltage Yard & Control room
• ASH PLANT – Circulate ash waterto ash dams
• Cooling Water – Diepsloot 54 Kmpiped
CORE BUSINESSCORE BUSINESSCORE BUSINESSCORE BUSINESS
• Supplying electricity to City Power, which is City of Johannesburg’s electricity utility.
• DEMAND – Maximum Availability during Winter months.
• Lower dispatch and load during summer months.
82% Availability
12% Planned
6% Forced Outages
0% Tolerance
The 3 P’s :
People
Passion
Plant Performance
Introduction
Moving beyond Maintenance
– Asset Management
Although Maintenance Management has been practiced for many years at Kelvin Power Station it is clear that the traditional approach to maintenance is not only outdated, caused major degradation, but also outright dangerous in many cases. The complexity of not only the physical assets themselves, but also the environment surrounding the assets, demands a much more formal and structured approach.
Introduction (continued)
A new innovative, formal and structured process is being put in place as from 2009 and continually enhanced because “Continuous Improvement” is a cardinal slogan in the vocabulary of Asset Management. These processes, policies and procedures provide clear direction as how the Asset Management Department is managed, controlled, coordinated and directed. To ensure synergy between the various Departments, policies and procedures have been adopted from Kelvin Power documents (programs, budgets etc) whilst others have been produced solely for the use of the Asset Management Department
Vision
• Kelvin Asset Management
Department will be the most
professional and admired
Department at Kelvin Power Station
Mission Statement
• Asset Management Department will ensure that all assets are maintained in accordance with the safety and environmental legislation in the most cost effective way and highest acceptable quality standards to ensure operational plant availability and meeting customer expectations
Mission
Asset Maintenance Asset Maintenance ManagementManagement
Safe and Safe and EnvironmentalEnvironmentalFriendly PlantsFriendly Plantsand Operationsand Operations
CostCostEffective Effective
MaintenanceMaintenance
OperationalOperationalCapability Capability ––
Plant Availability,Plant Availability,ReliabilityReliability
Product andProduct andService QualityService Quality
Customer andCustomer andClient ServiceClient Service
Key Objectives To Be Achieved
• A more structured and professional approach to the management of assets at Kelvin Power Station
• Laying the foundation and building on the process of Planned Preventative Maintenance.
• Instilling the concept of Quality of workmanship and technical excellence.
• Setting standards
• Measuring utilisation of Asset Management workforce
Key Objectives To Be Achieved
• Substantially improve the utilisation of the
available manpower
• Improve Team Leaders skills – Technical
Excellence
• Improve technical skills of artisans and
assistances
• Most of all ensuring a dynamic, motivated
and successful Asset Management
Department
Asset Management Strategy
Loop
1. Set Mission2. Set
Objectives3. Develop
Strategy4. PlanTactics
5. Execute Tactics
6. MeasureResults
7. FeedbackResults
Understand the Problem
Audit of Maintenance Maturity Level
48Formal CMMS in place10101010
27Breakdown overtime monitored and frowned upon 9999
25Appointment/training of specialists (Pumps, hydraulics etc)8888
47Maintenance Team Leaders Trained7777
37Supervision Rolls and Responsibilities6666
37Management indices are regularly reported & acted upon5555
38Continuous improvement is formal & participative4444
48Disciplined works order system. Recorded, & maintained3333
38Planned preventative maintenance is an essential part of
strategy2222
48Maintenance Business Process Established1111
Audit
‘09
Achieved
2010MATURITY LEVEL OBJECTIVE
Audit in 2009 compared to Audit 2010
8
8
88
7
8
5
77
83
3
4
3
44
2
2
1
4
0
1
2
3
4
5
6
7
8
9
10
B usiness pro cess
P lanned M tce
W/ Orders
Impro vement
Superv is io n
M aint . T eam T ra ined
A pp/ T ra in Spec
A cco untabilit y
Overt ime
C M M S
Asset Management Processes – Process
& Administration Manual
• The key tool for the Department’s manager
• The key tool for all of the employees in the Department
• The foundation and benchmark to be used for making substantial improvements in the Asset Management Department
• Ability to audit the processes
• Ability to quantify performance
• Ability to identify specific areas for improvement
Asset Management – Process &
Administration Manual
• All key processes identified
• All key sub processes identified
• All processes defined
• Ensures integration of processes within the department
• Provides key links to processes that are necessary in other departments
Process Manual - Contents
A - Policy & process document
B - Kelvin Success Triangle, Vision, 3 P’s
C - AOP Programme
D - Kelvin Annual Budget
E - Kelvin Authorities Matrix
F - Department Annual Strategic Objectives
G - Organisation Structure
H - Policy Document
I - Dept. Performance Targets
J - Manager – performance contract
K - Asset Management Dept. Code of Conduct
L - Job Descriptions
Process Manual - Contents
M - Key Roles & Responsibilities
N - Dept. Administration Process
O - Dept. Numbering Breakdown Structure
P - Dept. Audit Review
Q - Asset Management Dept. Control –Daily
Reports
R - Monthly Report to General Manager
S - Asset Management Department Process
T - Procedures
Planned Preventative
Maintenance
• If maintenance is considered to ensure that equipment within a power station or any other physical asset continues to perform its intended function then preventative maintenance is a series of planned preventative tasks performed to counteract known causes of potential failures of those functions.
The Basic Underlying Strategy
Planned Maintenance
Corrective Maintenance
Emergency Safety Corrective MaintenancePreventative Maintenance
Unplanned Maintenance
Asset ManagementStrategy
95% 5%
10% Manning
90% Manning
Reinforcing the Basics of Routine
Work Management
Work Identification
Process
Planning Process Scheduling
Process
Work Assignment
Process
Work Execution
PerformanceAnalysisProcess
Sustained Maintenance
ProcessContinuous Improvement
Loop
Work OrderPackages
Work Plans,Procedures &Quality docs
HistoricalData
Up-Grades and AdditionsTo Maintenance Plans Additional Tasks &
PlanningImprovements
Emergency
Required Work
Response
The Work Management FlowEngineering
�Safety Inspections, �Change Modifications�Insurance Risk Items
Work Identification
Work Planning
Work Scheduling
Work Assignment
Work Execution
Work Analysis
EMERGENCY
PM & ConditionMonitoring
programupdates
Work order Planningupgrades
Work Scheduling
Improved workProcedures
Work AssignmentImprovements,
Trainingrequirements
FEEDBACK FORCONTINUOUS IMPROVEMENT
Maintenance
� Preventative maintenance� Condition Monitoring� Corrective Maintenance� Maintenance Modifications
Net Capacity
Materials Requirements,Resource Coordination
Progress Information Problems Encountered
Completion
EquipmentAvailability for
Maintenance
Operations
� Equipment Condition� Operating Priorities� Corrective Maintenance
60%32%
8%
OPSRAISE OWN W/O WITH
CORRECTDETAIL
CRAFT,GL, ETCPUT W/O (“WAPPR”)
MAINT.APPLY FOR PERMIT.REPAIR
DEFECTS.TAG REMOVED BY MAINT.
(PROPER FEEDBACKAND DONE NEATLY.)
IF OUTAGE IS NEEDED,MAINT.
PUT IN REQUIRED STATUSHERE IT GOES FROM ’WAPPR’
TO APPROPRIATE STATUS
STATUS KEEPS W/O OPEN. PLANNER
FILTER UNDERSTATUS .TRANSFER
DATA OVER TO M.S PROJECTS
TO USE IN OUTAGE/ PROJECT
PLANNINGCOMPLETE/CLOSE
W/O(FINAL STAGE)
W/O AND PERMITGIVEN IN BY MAINT..
PLANNING TO CLOSEW/O
MAXIMOON COMPLETION OF
W/O & PERMIT CLEARED IN BY MAINT.
MAINTPlANNER USES MAXIMO
. HAS 2 DAILY MEETINGS WITH TEAM LEADER/CHARGE HAND
TO SCHEDULEAND ALLOCATE W/O PLANNER TO PRINT W/O
AND ISSUE TO MAINT. (APPLY FOR PERMIT.
REPAIRDEFECTS.
TAG REMOVED BY MAINT.)
OPS WILL ONLY GIVE PERMIT WHEN HE/SHE
GETS A W/O
ONLY “APPR” IF WORK CAN BE DONE IMMEDIATELYWITHOUTNEED FOR OUTAGE.
MICRO SCHEDULINGTO TAKE PLACE
DAILY WITH MAINT.BY PLANNING
(3 DAYS AHEAD.)
PERMIT SENTBACK TO OPS
C.M (Generated CMMS)
WGO-WAITING G.OWPROJ-PROJECT TYPE DEFECT
WSRO-WAITINGSTEAM RANGE OUTAGE
OPS TAGSDEFECTIVE ITEM
TO STOPDUPLICATION.TAG MUST
HAVE W/O ON IT.
Corrective Maintenance – flow diagram process
SCHEDULEDBY
PLANNINGTO MAINT.
COMPLETE /capture defects repaired info /
CLOSE /PM W/O
BY PLANNING
REPAIRDEFECTS.IF NEEDED
USE W/O FOR PERMIT.PAPER WORK TO
HAND BACK TO PLANNER
MAINTPLANNER USES
MAXIMO. HAS 2 DAILY
MEETINGS WITH TEAM LEADER/CHARGE HAND
TO SCHEDULEAND ALLOCATE W/O
PLANNING TO CLOSEW/O
MAXIMOON COMPLETION OF
W/O
PLANNER PRINTS ,ISSUESMANUALLY.
MAINT APPLY FOR PERMIT.REPAIR DEFECTS.
TAG REMOVED BY MAINT.
WGO-WAITING G.OWPROJ-PROJECT TYPE DEFECT
WSRO-WAITINGSTEAM RANGE OUTAGEINPRG-IN PROGRESS
THE PLANNERWILL GIVE THE
P.M W/O MANUALLY.THIS WILL BE DONEWEEKLY PLANNER/
TEAM LEADER/CHARGEHANDS
CAN SLOT TIMES AND APPOINT PERSONSTO DO THE WORK.
CANNOTREPAIRDEFECT
IMMEDIATELY,MAINT TAG
DEFECT(Maint. gives
feedback on w/o)
PLANNERCREATE FOLLOW-UP W/O
(ORIGINAL PM W/OIS THEN CLOSED)
P.M (Generated CMMS)
OPS WILL ONLY GIVE PERMIT WHEN HE /SHE
GETS A W/O
DO INSPECTION/PM
MORNINGMEETING
,DO MICRO SCHEDULING
PERMIT BACK TO OPS.
Preventative Maintenance flow diagram process
Breakdown flow diagram process
Breakdowns
OPS CREATE W/O ON MAXIMOREADY FOR STANDBY PERSON .
.
ON ARRIVAL OF STANDBY,OPS MAKES A PRINT.
PERMIT IS APPLIED FOR BY MAINT .
PERMIT CAN BEISSUED WITH W/O NUMBER
REPAIR DEFECTS
NEXT DAY,TEAM LEADER SIGNS OFF
DEFECT SHEET AND PERMITSENT TO PLANNER
PLANNER CAPTURESFOR DATA ONLY
PERMIT SENTBACK TO OPS
FOR SAFE KEEPING .
Technical Support
InformationFacility Support
Man Supervision
Asset Management - Roles & Responsibility Structure
Role of Mechanical/Electrical Leader
� Emphasis must be on “Technical Excellence & Coaching”
• Supportive of the Maintenance Manager and rest of Team
• Technical Investigations. (Bloodhound, analytical skills)
• High level problem solving
• Coaching
• Manage Major Maintenance Projects
• Research and recommend new equipment
• Investigate and report on plant tripping events
• Identify areas were Occupational, Health and Safety standards are not complied too
• Develop work procedures and quality control documentation
• Pre-empt possible failures, non conformance
Role of Maintenance Supervisor – Who
best to do the job
� Emphasis on “Supervision & Coaching”
• Quality of workmanship
• Reliability
• Budget: preparation & control
• Compliance with RM schedule
• Compliance/Weekly master schedule
• Contractors on site
• Manpower planning
• Overtime
• Labour performance
• Labour utilization
• Utilization of skills
• On the job training (coaching)
• Training needs assessment
• Maintenance of tools, equipment
• Enforce safety standards
• Identification of stock items
• Definition of stock levels
• Materials issue & return control
• Spares forecast/prediction
Role of Maintenance Planner – What
and when to do the job�Emphasis must be on “Information”
• Development/update of maintenance plan
• Preparation of weekly master schedule
• Maintenance logistics planning
• Upkeep of equipment register
• Finance. Control of costs
• Backlog control
• Warranty control
• Quality & integrity of data. Record keeping Maximo
• Preparation & distribution of management reports
• Regular analysis of data
• Documented maintenance best practice (procedures & standards)
• Documentation control
Asset Management - Dashboard
Safety Environment Team:
CM's PM's
Outstanding CM'sTBMBTMEDMIDMMills
Asset Management Bashboard
Incident Action Closure
Maintenance Costs
Hydrogen Seal
Safety, Environmental & Incidents Reliability, PM-Schedules, CM's, PM's & Absentiseem Root Cause Analysis
Reliability
Safety and Man-hours
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
Jan March May July Sept Nov
LTA
's
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
Man
-hou
rs
Environmental incidents
0
1
2
3
4
5
6
7
8
9
10
Jan Feb March April May June July August Sept Oct Nov Dec
157
95
62 60.5
95
45 50 47.37
020406080
100120140160180
MONTH TOTALACTION ITEMS
ACTIONCLOSURES
ACTIONS INPROGRESS
SEPT '09 OCT '09 NOV '09 DEC '09
5000
7000
6000
8000
0
5000
10000
15000
20000
25000
30000
Rands
Rand contribution
Maintenance Cost
Variable cost
Fixed cost
Overheads
Materials
Reliability
0
10
20
30
40
50
60
70
80
90
100
Jan Feb M arch April M ay June July August Sept Oct Nov Dec
Corrective Maintenance
0
2
4
6
8
10
12
Jan
FebM
arch
April
May
June Ju
lyAug
ust
Sept
Oct
Nov Dec
activ
ities
Preventative Maintenance
0
1
2
3
4
5
6
7
8
9
10
Absentiseem
0
1
2
3
4
5
6
7
8
9
10
Jan
FebM
arch
April
May
June July
Augus
tSep
t
Oct
Nov Dec
no. o
f peo
ple