Will Virtualization Pay Off for Your Enterprise?

41
© 2008 Jupitermedia Corporation Implementing a Green Data Center July 21, 2008 2:00pm EDT, 11:00am PDT George Spafford, Principal Consultant Pepperweed Consulting, LLC “Optimizing The Business Value of IT” http://www.pepperweed.com

Transcript of Will Virtualization Pay Off for Your Enterprise?

Page 1: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Implementing a Green Data Center

July 21, 20082:00pm EDT, 11:00am PDT

George Spafford, Principal ConsultantPepperweed Consulting, LLC“Optimizing The Business Value of IT”http://www.pepperweed.com

Page 2: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Housekeeping

• Submitting questions to speaker– Type question into small box in the Chat (Q&A) window on

the left and click the arrow button.– Questions will be answered during 10 minute Q&A session at

end of webcast.

• Technical difficulties?– Click on “Help” from top menu – select “Troubleshooting” to

test system, get FAQ– Or get tech support via Q&A tool

Page 3: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Main Presentation

Page 4: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Agenda

• Background• Need Objectives• Meeting Demand• Location• Cooling• Inside the Equipment• Power• Next Steps• Continuous Improvement• …and a lot of other things along the way

Slides available by emailing:

[email protected]

[email protected]

Page 5: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Painting a Picture with Statistics• Data centers consume 1.5% of all electricity in 2006 and growing

at 12% annually – Department of Energy– If IT were an industry, it would be approaching the top five energy

consumers• Data centers forecasted to surpass airlines in terms of CO2

emissions by 2020 due to energy consumed – McKinsey & Co. 2008– Can you say “Threat of regulation”?

• Data center power demands have doubled in last five years and 76% growth is predicted between 2005 and 2010 – IDC

• Three year cost of powering and cooling a typical server is now 1.5x the purchase cost of the hardware – Uptime Institute 2007

• Energy costs are 15-20% of IT’s operating expenses – Dave Ohara, Microsoft 2007

• 50% of data centers will have insufficient power and cooling capacity by 2008 – Gartner 2006

• 70% of Global 1000 will need to significantly change their data centers in the next five years to meet current and future energy needs – Gartner 2007

Page 6: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

What Are Your Objectives?• Need to start by developing a plan

– Understand the organization’s overall direction with Green• Need to understand current state

– Energy (our emphasis in this webcast)– Cooling– Other – eWaste, etc.

• Need to understand the future state• Need to assemble a roadmap• The roadmap must evolve over time• Need monitoring to understand

– Progress against objectives– Potential trends and opportunities for improvement

Page 7: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Power Consumption• Chiller 33%• IT Equipment30%• UPS 18%• Computer Room Air

Conditioning (CRAC) 9%• Power Distribution

Units (PDUs) 5%• Humidifiers 3%• Switch / generator 1%• Lighting 1%

http://www.thegreengrid.org/gg_content/Green_Grid_Guidelines_WP.pdf

Notice how only 30% of each watt actually goes to the IT Equipment.

Out of every 10 watts sent to the data center, only 3 wind up being used by IT equipment.

42% goes to cooling

24% goes to power

90% goes to the top four!

Page 8: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Meeting Power and Cooling Demands• Difficult to get 7+ year old data centers to support current and future

power and cooling needs• Designed for 2,500 KW/Rack• Now seeing 20-30,000 KW/Rack w/high-density blades• Designed for 35-70 watts per sq ft. Now 300+ watts. – Gartner

– (Provides a comparison, but don’t use square foot costs moving forward)• That means that cooling requirements went up by 10-15x!• Cooling based on watts per foot vs. localized zoning and other modern

considerations• Building has older and smaller wiring and power distribution• Older inefficient CRACs, UPSes, PDUs, Chillers, Pumps, etc.• Bottom line – it can be cost prohibitive to upgrade an existing data

center• Cheaper to build a new facility meeting requirements from the start

– Colocation in the short- or even long-term?

Page 9: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

The Arrhenius Equation

• For every 10 degrees C, the rate of the reaction doubles

• For IT, for every 10C the rate of component failure doubles

• We know heat is bad so we cool the data center• Results in hotspots – bad – see above• Results in cold spots – bad – wasted energy• Need the right level of cooling in the right place at the

right time

Page 10: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Location• Environment - Hot or cool?• Cost of energy?

– Hawaii and Alaska are very expensive per kw hour– Connecticut was 15.43 cents per kw hour (commercial rate)– Idaho was 5.12 cents per kw hour for (commercial rate)1

• Sufficiency of Power– Avoiding roving black outs

• Google has a data center by the Dalles Dam in Oregon to avail of cheap reliable hydroelectric power

– Estimated in 2006 that Google had over 450,000 servers in 25 locations2

• Opportunities for distributed / co-generation of power?– Solar, geothermal, wind, etc.

• Virtualization the Data Center – what if the data center’s peak usage coincides with the locale’s lowest off-peak demand?

• Colocate in a third party data center1. Analysis of electrical costs per state:

http://www.spaffordconsulting.com/Cents%20per%20Kilowatt%20variation%20analysis_062208_v1d.xls

2. http://www.nytimes.com/2006/06/14/technology/14search.html?hp&ex=1150344000&en=25cfc1be85c1d603&ei=5094&partner=homepage

Page 11: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Cooling - Basics• 1 watt of IT equipment requires 1 watt of cooling

– Studies report factors from 0.6 to 1.6• Color of roof and outside walls – want to reflect light not absorb• Insulation – walls, ceiling, doors, windows and use door

thresholds• Limit access to the data center• Temperature – Increase for 68 to 72 degrees F / 20 to 22 C• Watt per square foot doesn’t work

– Averages ignore hot spots and cold spots– May have been balanced when opened, doubtfully balanced after

year one– Cooling a 700 watt server is one thing a 30,000 watt blade system

is another

Page 12: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Cooling – Moving Local• Avoid loss of cooling capacity due to warming

over a distance• Think in terms of

– Rack level power and cooling [ Your primary building block ]

– Zones that are logical groupings of racks / equipment– Need to maximize the cooling where it is needed, not overall

• Need to formally define standards for each zone– Implement solutions– Collect data– Define events / alerts– Review reports– Take action!

Page 13: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Water and Liquids

• Back after a brief hiatus • More efficient than air

– Can literally be 3,500 times more efficient

• Uses one or more chillers• Pumps move liquid into data center• Direct to devices (cooling in the chassis)• To Computer Room Air Conditioners (CRACs)• On or above racks• Localized in zones

Page 14: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Cooling – Hot and Cold Aisles• Don’t want exhaust from

one rack going into the input of another

• Arrange racks so heat dumps into a hot aisle and cold air comes in from cold aisles

• Position CRACs close to the demand

– Picture could be one zone• Raised floors – IBM

recommends 24 inches• Clean out under the raised

floor– Abandoned cables– Dust and debris– Use structured cabling

• Need cooling / perforated tiles in the right places

• Seal open rack slots, cable ways, etc. to protect air flow

• Keep hot and cold air from mixing with partitions

Raised Floor / Cold Air

CRAC CRACRack Rack Rack Rack

Col

d A

ir

Hot Air Return Plenum

Col

d A

ir

Hot

Air

Hot

Air

Hot

Air

Hot

Air

Hot

Air

Cold AirCold Air

Partitions / Barriers

Page 15: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Cooling – Additional Thoughts (1)• Use partitions or otherwise segment zones• Prevent coolers from fighting one another• Be aware of where hot air is dumped (not out of one cooler

and into another's cold air intake)• Leverage economizers

– Groups have them but aren’t using them– Batelle study showed 13% lower costs– Air side economizers - leverage outside air based on

environmental factors including temperature and humidity• PG&E reports 60% when airside economizer and air

management are combined– Fluid side economizers – use a second coolant loop that can be

activated to use outside temperatures to augment/replace the primary chiller. Can avoid dust, humidity, etc.

Page 16: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Cooling – Additional Thoughts (2)

• Underutilization (< 75%) negatively impacts efficiency

• Make duct runs as short as possible– Means locating the air conditioning close to the equipment

needing cooling

• Continuously Monitor and Re-evaluate Cooling– Demand side– Supply Side

• New chillers can reduce energy consumption by 50%

Page 17: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Inside the IT Equipment (1)• Lower voltage processors

– Only 30% of power consumed is the processor• Fewer voltages in the cabinet

– Why 5, 3.3 (new) and 12 volt? – Every conversion represents a loss– Google spec’d out boards that just used 12 volt

• More efficient power supplies– Inefficient power supplies can waste half their power (which

also means they are creating more heat)– New power supplies are 80% efficient or higher– Cost more to purchase but lower operating costs– http://www.80plus.org

Efficient Power Supplies For Data Centers and Enterprise Servershttp://www.80plus.org/documents/ServerResearchReportFinal.pdf

Page 18: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Inside the IT Equipment (2)

• Centralized power supplies vs. per device– Use fewer transformers and run the power to the racks and

devices vs. having a power supply in each rack or even device

– Reduces the number of “hair dryers” on the floor

• Hardware compression to reduce storage demands– Hard drives are hot! (So is the demand for storage)– Look at using compression to reduce the amount of storage

needed

Page 19: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Power Demand• Did you know that “off” does not equal zero

demand?• It pays to understand what modes a device

supports and leverage them– Dell E772 17” Monitor – Maximum Draw 75 Watts, 70 watts

typical– Suspend less than 5 watts (93% savings)– Switched off less than 1 watt (98.7% savings)

• Develop power profiles of devices– If you are on a budget – buy a Kill-A-Watt unit

• Do you size to turn everything on at once or phase power-ups to reduce peak demand?

Page 20: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Leverage Power Management Features• Demand for the IT service varies, but power demand

doesn’t vary the way it should– Power management is disabled or wrongly configured

• EPA estimates savings of $25-75/year on just a personal computer– See the Energy Star calculator

http://www.energystar.gov/ia/products/power_mgt/LowCarbonITSavingsCalc.xls

• For servers and other systems– Understand impacts of power management

• Response time• Stability (not all systems behave well with power mgt)• May be some options can be used but not all

– Newer systems have more power saving features in the BIOS, etc.

Page 21: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Uninterruptible Power Supplies• Newer UPSes are 70% more efficient than older ones• Sized based on demand, length of average outage and/or

how long it will take the generator(s) to stabilize• Types:

– Standby – relay trips over to the battery– Line interactive – inverter is always connected providing filtering– Double conversion – power is always supplied by the UPS that is

simultaneously charging its batteries as well• Problems

– Can generate massive heat– Batteries need to be replaced (introducing lead and acid into the

environment)• Flywheels can replace / augment UPSes

– Need to still supply power while generators stabilize– Could be UPS + flywheel just in case

Flywheel’s Power: http://broadcastengineering.com/RF/broadcasting_flywheels_power/ Pentadyne’s FAQ’s, Technology, etc. on Flywheels: http://www.pentadyne.com/site/our-products/technology.html

Page 22: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Power Co-Generation (1)• Generate power locally / on-site• Cover variations in supply• Augment supply during peak demand periods• Potential to sell power back to the utility• Diesel Generators

– The old standby– Getting expensive to run

• Solar– Efficiency is improving– Needs direct light, not so great in winter climates– Battery bank?– See what AISO is doing

• http://www.aiso.net/solar-powered-network.asp

Page 23: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Power Co-Generation (2)• Wind

– Efficiency is improving– Subject to the whims of nature– Battery bank– See plans by Green House Data

• http://www.datacenterknowledge.com/archives/2007/Nov/29/wind-powered_data_center_in_wyoming.html

• Geothermal– Great if you have access to geothermal areas– Chena hot springs is a great example of possibilities running

at only a “warm” temperature• http://www.yourownpower.com/

Page 24: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Consolidation and Virtualization• #1 - Remove abandoned servers!• Server utilization ranges from 6-30% depending on study• Look for complementary loads and consolidate

– Reports range from 3-20 originals integrated into one• Assess virtualization to consolidate

– Servers– Assess ability to power-up or down on-demand– Desktops even – go to thin client

• Fault tolerance– Re-assess needs for hot N+1– The spare is consuming power and generating heat– May not be cost justifiable 100% of the time

Page 25: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Lighting

• 1% of energy, but very visible – sends a message– Plus, 1% of a multimillion dollar energy budget isn’t trivial

• Why light the data center 24x7?• Motion sensor• Timers• Zones – some lit 24x7 and some not• Use high efficiency lighting

Page 26: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Monitoring• How many of you know exactly how much power

your data center is using?• How many can trend it over time?• Many environmental systems aren’t on the network

and hinder data collection and reporting• Many existing data centers do not have granular

power tracking and reporting– The problem with average cost per port is that it is an

average!– Odds are that 20% of the systems will consume 80% of the

power (or some other ration in line with Pareto’s Law of Inequality)

Page 27: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Formalize and Communicate Standards

• Develop a team to review and set standards• Work with management to formalize the team• Engage with facilities to involve them as well on

decisions about power and cooling• Work with vendors – trust but verify

– “Greenwashing”

• Work with management to set the proper “tone” about going green and what it means

• Communicate wins to the organization

Page 28: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Next Steps• Understand power and cooling today• Develop a plan of where you want to go• Improve cooling efficiency where possible – insulate, close up

racks, put perforated floor or ceiling tiles in the right place, control access to the data center, put up partitions, coordinate where hot and cold air are going, etc.

• Decommission abandoned equipment• Stop buying over capacity without understanding operating

costs• Implement and standardize power management

applications/configuration• Identify hardware where replacement would generate a true

accounting ROI• Once configured the right way, use Change Management• Assign a team the responsibility to develop standards

Page 29: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Continuous Improvement• The first step is only the beginning

of a journey• Needs will change as technologies

and the world changes• Leverage metrics where possible

to track status• Conduct quarterly reviews of

progress• Formally schedule reviews to

assess the current state and look for new opportunities

• Always look for new opportunities and threats

Where do we want to be?

Where are we now?

How do we get to where we want to be?

How do we monitorProgress?

Vision and Objectives

Audits / Assessments

Process Improvement(Leverage Best Practices)

Metrics and Critical Success Factors

Page 30: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Thank you for the privilege of facilitating this webcast

George [email protected]

http://www.pepperweed.com

The News - Archive, RSS and Email Subscription Instructionshttp://www.spaffordconsulting.com/dailynews.html

(Covers IT management, business, energy, security and a host of other topics)

Page 31: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Page 32: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Page 33: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Page 34: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Page 35: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Page 36: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Page 37: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Resources (1)• Mike Ebbers, Alvin Galea, Marc Tu Duy Khiem, and Michael Schaefer. “The Green Data Center

– Steps for the Journey” RedPaper Draft (June 2, 2008 Draft)http://www.redbooks.ibm.com/abstracts/redp4413.html[Excellent!]

• US Department of Energy – Energy Efficiency and Renewable Energyhttp://www1.eere.energy.gov/industry/saveenergynow/partnering_data_centers.html

• DOE – Creating Energy Efficient Data Centershttp://www1.eere.energy.gov/industry/saveenergynow/pdfs/doe_data_centers_presentation.pdf

• American Society of Heating, Refrigeration and Air-Conditioning Engineers – Technical Committee 9.9http://tc99.ashraetcs.org/

• Creating the Green Data Center http://www.adc.com

• The Data Center Journalhttp://datacenterjournal.com/

• The Green Gridhttp://www.thegreengrid.org

Page 38: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Resources (2)• Simon Mingay. “10 Key Elements of a ‘Green IT’ Strategy”. Gartner. December 2007.

• Energy Information Administration. Electric Power Monthlyhttp://www.eia.doe.gov/cneaf/electricity/epm/epm_sum.html

• National Data Center Energy Efficiency Information Programhttp://www1.eere.energy.gov/industry/saveenergynow/pdfs/national_data_center_fact_sheet.pdf

• Lawrence Berkeley National Labs – Data Center Best Practiceshttp://hightech.lbl.gov/datacenters.html

• Kenneth G Brill. “Data Center Energy Efficiency and Productivity”. The Uptime Institute. 2007.http://www.cio.co.uk/whitepapers/index.cfm?whitepaperid=4241

• Cogeneration & On-site Power Productionhttp://www.cospp.com

• US Department of Energy – Distributed Energy Programhttp://www.eere.energy.gov/de/

• Chena Hot Springs Geothermal Projecthttp://www.yourownpower.com/

• State of California – Distributed Energy Resource Guidehttp://www.energy.ca.gov/distgen/index.html

Page 39: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Resources (3)• Cisco Energy Efficient Data Center Solutions and Best Practices

http://www.cisco.com/en/US/solutions/ns708/networking_solutions_products_genericcontent0900aecd806fd32e.pdf

• High Performance Data Centers: A Design Guidelines Source Bookhttp://hightech.lbl.gov/documents/DATA_CENTERS/06_DataCenters-PGE.pdf [Excellent! Well researched and includes references. ]

• Energy Fit @ Los Alamos National Labshttp://www.lanl.gov/orgs/tt/pdf/techs/energyfit_tech.pdf

• Giving Data Center Cooling Systems a Boosthttp://www.weigelmep.com/White%20Paper%20-%20Giving%20Data%20Center%20Cooling%20Systems%20a%20Boost.pdf

• Thinking inside the box: Boosting the effectiveness of air coolinghttp://www.mil-embedded.com/articles/id/?3281

• Uptime Institutehttp://www.uptimeinstitute.org/

Page 40: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Questions?

Page 41: Will Virtualization Pay Off for Your Enterprise?

© 2008 Jupitermedia Corporation

Thank you for attending

If you have any further questions, e-mail [email protected]

For future internet.com Webcasts, visit www.internet.com/webcasts