WIGOS Regulatory Material Proposal – May 12
-
Upload
rose-ramsey -
Category
Documents
-
view
33 -
download
0
description
Transcript of WIGOS Regulatory Material Proposal – May 12
WIGOS Regulatory MaterialProposal – May 12
WMO TECHNICAL REGULATIONS
GO
S M
anua
l
WIGOS Manual
xx M
anua
l
yy M
anua
l
zz M
anua
l
aa M
anua
l
bb M
anua
l
Guides, References, Instructions etc
WIGOS MANUAL (Annexes)
WIGOS Regulatory MaterialProposal – Oct 12
WMO TECHNICAL REGULATIONS
Vo
l 1 –
I.1
WIG
OS
Guides, References, Instructions etc
Vo
l 1 –
I.2
GO
S o
f W
WW
Vo
l 1 –
I.3
GA
W
Vo
l 1 –
I.4
WH
YC
OS
Vo
l 1 –
I.5
GC
OS
Vo
l 1 –
I.6
GC
W
Vo
l 1 –
I.7
IM
O
Vo
l 4–
Qu
alit
y M
an
ag
em
en
t
Annexes
WIGOS Regulatory Material: Proposal – Nov 12
WMO TECHNICAL REGULATIONS
Vol 1 – I.1 Introduction
Vol 1 – I.2 Common Attributes of Component Systems
Vol 1 – I.1.1 Purpose of WIGOS
Vol 1 – Part I WMO Global Integrated Observing System
Vol 1 – I.1.2 WIGOS component observing systems
Vol 1 – I.1.3 Collaboration with co-sponsored & non-WMO OS
Vol 1 – I.1.4 Government and management
Vol 1 – I.2.1 Requirements
Vol 1 – I.2.2 Design, planning and evolution
Vol 1 – I.2.3 Operations and Maintenance
Vol 1 – I.2.4 Data and Information Management
Vol 1 – I.2.5 Standardisation of Instruments & Methods of Obs.
Vol 1 – I.2.6 Quality Management
Vol 1 – I.2.7 Capacity Development
WIGOS Regulatory Material: Proposal – Oct 12
WMO TECHNICAL REGULATIONS
Vol 1 – I.1 Introduction
Vol 1 – I.2 Common Attributes of Component Systems
Vol 1 – I.3 Surface-Based Sub-System
Vol 1 – I.4 Space-Based Sub-System
Vol 1 – I.5 Global Atmospheric Watch (GAW)
Vol 1 – I.6 Global Cryosphere Watch (GCW)
Vol 1 – I.7 Global Observing System (GOS)
Vol 4– Quality Management
Vol 1 – Part I WMO Global Integrated Observing System
Vol 1 – I.8 World Hydrological Cycle OS (WHYCOS)