WiFi LAN WITH TV AND RADIO RECEPTION
![Page 2: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/2.jpg)
Project Stages
Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report
![Page 3: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/3.jpg)
Project Charter
![Page 4: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/4.jpg)
Project Charter
Existing Hardware:
LOHHLLJY POUKKGKFFF FGARFGROKGLGHLJHJ GIYJFFF TUGT DEHDHHJJCXCDD
LOHHLLJY POUKKGKFFF FGARFGROKGLGHLJHJ GIYJFFF TUGT DEHDHHJJCXCDD
![Page 5: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/5.jpg)
Project Charter
Sketch
WiFi Connection
TV and Radio Receiver
LAPTOP LAPTOP
WiFi Adapter
WiFi Adapter
TV Program
Transmitting TV program Over the WiFi LAN Connection
![Page 6: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/6.jpg)
Project Charter
![Page 7: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/7.jpg)
Project Charter
Proposed Hardware: Linksys WUSBF54G Wireless-G USB Network Adapter with Wi-Fi Finder STANDARDS: IEEE 802.11b, 802.11g, USB 1.1, USB 2.0 PORT: USB Port CHANNELS: 802.11b/802.11g RECEIVE SENSITIVITY: 54Mbps @ -65dBm, 11Mbps @ -80dBm SECURITY FEATURES: WEP Encryption Compatible with 802.11g and 802.11b (2.4GHz) Standards Support USB 2.0 with up to 54Mbps, High-Speed Data Transfer Rate with Automatic Fallback Compatible with Microsoft Windows 2000 and XP
User Comments Very good range even at 1km Easy to read display with the all require information Rechargeable battery Good Speed
![Page 8: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/8.jpg)
Project Charter
USB 2.0 AVerMedia TV Hybrid + FM Volar Pen Drive
USB 2.0 Pen Drive Watch Analog TV OR High Quality Digital Terrestrial TV FM Radio broadcasts on your PC/Notebook Microsoft MCE 2005 Compliant on Digital TV PVR Features Time-Shift, TV Scheduler Record Video to MPEG1/2 formats 4:3 and 16:9 wide-screen format 16 Channel Preview Windows XP and XP MCE 2005
![Page 9: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/9.jpg)
Project Feasibility
Approach Overview:
Implement the LAN connection between two laptops via WiFi adapter.
Install one TV and Radio Receiver in one of the laptops and transfer the signal through Wifi LAN
Description of the solution:
Firstly we need to install two WiFi adapters in two laptops
LAPTOP
WiFi Adapter
LAPTOP
WiFi Adapter
![Page 10: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/10.jpg)
Project Feasibility
Install one TV and Radio receiver
LAPTOP
WiFi Adapter
![Page 11: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/11.jpg)
Project Feasibility
Capture some radio or TV signal
LAPTOP
WiFi Adapter
![Page 12: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/12.jpg)
Project FeasibilityTransfer the signal from one laptop to another using WiFi
connection
WiFi Connection
TV and Radio Receiver
LAPTOP LAPTOP
WiFi Adapter
WiFi Adapter
Transmitting TV program Over the WiFi LAN Connection
![Page 13: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/13.jpg)
Project Feasibility
Benefit/Cost of solution:
2 x USB WiFI adapters - $126.80 USB TV and Radio Receiver - $108.90 Installation and testing fees - $1000
![Page 14: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/14.jpg)
Project Feasibility
Recommended solution:
WiFi Connection
TV and Radio Receiver
LAPTOP LAPTOP
WiFi Adapter
WiFi Adapter
TV Program
Transmitting TV program Over the WiFi LAN Connection
![Page 15: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/15.jpg)
Work Breakdown Structure
![Page 16: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/16.jpg)
CHANGE CONTROL
Change Request Overview:
Bluetooth dongle has the following features:
Maximum range if the wireless connection is 100 metre Encrypted data Security Easy maintenance
![Page 17: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/17.jpg)
CLOSE-OUT REPORT
Project Deliverables
DELIVERABLE DATE ACCEPTED
Project Charter 17/10/2007
Project Diagram 17/10/2007
Work Breakdown Structure 24/10/2007
Feasibility Study 24/10/2007
Change Control 31/10/2007
Close-Out Report 07/11/2007
![Page 18: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/18.jpg)
CLOSE-OUT REPORT
Budget Baseline:
CATEGORY PLANNED ACTUAL VARIANCE
Hardware $500 $235.70 -$264.30
Software $0 $0 $0
Labour $2,000 $1,000 -$1,000
Total $2500 $1235.70 -$1265.30
![Page 19: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/19.jpg)
CLOSE-OUT REPORT
Schedule Baseline
![Page 20: WiFi LAN WITH TV AND RADIO RECEPTION. Project Stages Project Charter Project Feasibility Work Breakdown Structure Change Control Close Out Report.](https://reader035.fdocuments.us/reader035/viewer/2022062511/55140f25550346e2488b4f97/html5/thumbnails/20.jpg)
And that’s all Gentlemen