NERC DataGrid NERC DataGrid Vocabulary Server Use Cases Vocabulary Workshop, RAL, February 25, 2009.
Wide Area Workload Management Work Package DATAGRID project
Transcript of Wide Area Workload Management Work Package DATAGRID project
Wide Area Workload ManagementWork Package
DATAGRID project
Tasks List:Job description and resource specJob decomposition partitioningScheduling
Co-allocator+adv reservationResource management
Services and access control
Scheduling
Definition of scheduling policies in orderto find the best match between jobrequirements and available resources
NetworkStorageCpu
DeliverablesD1.1 (Report) Month 3: Report on current technologyD1.2 (Report) Month 6: Definition of architecture , technical plan and evaluation criteria for scheduling , resource management.security and job description.D1.3 (Prototype) Month 9: Components and documentation for the 1st release: Initial workload management system integrating existing technology and implementing computing resources brokerage.D1.4 (Report) Month 18: Definition of the architecture, technical plan and evaluation criteria for the resource co-allocation framework and mechanisms for parallel job partitioning.D1.5 (Prototype) Month 21: Components and documentation of the workload management system implementing code migration , user interface for task management., services for logging and bookkeepingD1.6 (Prototype) Month 33: Components and documentation for theworkload management system implementing data migration and remote access, co-allocation of resources, job description and users interface, services for bookkeeping and accounting and mechanism to specify job flowsD1.7 (Report) Month 36: Final evaluation report.
Milestones and expected resultM1.1 Month 9: Components and documentation for the 1 release: Initial workload management system based on existing technology integrationM1.2 Month 21:Components and documentation for the 2 release: Workload management scheduling implementing code migrationM1.3 Month 33:Components and documentation for the final releaseWorkload management scheduling implementing data migration and remote access
1 Release PM 9Job and resource required description:
using class-ads language.a possible high level interface based on XML will be investigated.first release of command line tool for job management (to submit, cancel, monitor jobs).
job policy and admission control.policies on resource usage based on user and usercommunity identity.
1 Release PM 9available resource selection using code migration paradigm. This selection will take into account:
available CPU in different farms spread in different sites.location of input data.cost of executable migration.available resources (disk space) for output data.
first release of accounting and bookkeeping services:monitoring of job status about processed data,output data produced, processing evaluation.
The globus GRAM protocol is the uniform interface to the localresources. The local resources are "cluster" of nodes, mainly PCs,managed by the PBS, LSF, Condor etc. software.The basicinformation system for this release is the Grid InformationService by the Globus project.
2 Release PM 21
Improvement of the first release also for high performance jobs takinginto account:
job monitoring dataresources (Computing, Storage, Network) monitoring dataperformance predictioncost of data migrationfault tolerance
The scheduling activity will also consider co-allocation of multipleresources, cost of data movement/replication,remote data access.Improvement of the high level job description interface and user services interface.Evaluation and adoption of a proper security framework for allocationand authentication of resources usage.
3 Release PM 33
Exploitation of data/task parallelismAdvance reservation of resourcesOptimal scheduling or rescheduling using performance monitoring tools