WI Checklist
-
Upload
dragan2507 -
Category
Documents
-
view
213 -
download
1
description
Transcript of WI Checklist
-
ChecklistWell Integrity Test
Field
Well Number
Rig
Workover Number
Task to be performed
Well Type
Single or dual completion
Gaslift tree or side outlet
Well Services Handover ReportNo. Component Designed Pressure & Duration Actual Pressure & Duration Conclusion
1 Plug set test Pressure & Duration Pressure & Duration Pass / Fail / N/A
2 Downhole safety device test(SSSV, storm choke, etc.) Pressure & Duration Pressure & Duration Pass / Fail / N/A
3 Sliding side door test Pressure & Duration Pressure & Duration Pass / Fail / N/A
4 Sidepocket mandrels test Pressure & Duration Pressure & Duration Pass / Fail / N/A
5 Water shut off device test Pressure & Duration Pressure & Duration Pass / Fail / N/A
6 Tubing test Pressure & Duration Pressure & Duration Pass / Fail / N/A
7 Tubing hanger test Pressure & Duration Pressure & Duration Pass / Fail / N/A
8 Xmas tree interface test Pressure & Duration Pressure & Duration Pass / Fail / N/A
9 Production casing tested Pressure & Duration Pressure & Duration Pass / Fail / N/A
10 Liner lap tested Pressure & Duration Pressure & Duration Pass / Fail / N/A
11 B annulus tested Pressure & Duration Pressure & Duration Pass / Fail / N/A
12 C annulus tested Pressure & Duration Pressure & Duration Pass / Fail / N/A
13 A annular outlet valves tested Pressure & Duration Pressure & Duration Pass / Fail / N/A
14 B annular outlet valves tested Pressure & Duration Pressure & Duration Pass / Fail / N/A
15 C annular outlet valves tested Pressure & Duration Pressure & Duration Pass / Fail / N/A
16 LMGV Pressure & Duration Pressure & Duration Pass / Fail / N/A
17 UMGV Pressure & Duration Pressure & Duration Pass / Fail / N/A
18 FWV Pressure & Duration Pressure & Duration Pass / Fail / N/A
19 KWV Pressure & Duration Pressure & Duration Pass / Fail / N/A
-
20 SWAB Pressure & Duration Pressure & Duration Pass / Fail / N/A
21 Tubing material loss verified(calliper) %age wall thickness lost %age wall thickness lost Pass / Fail / N/A
22 Casing material loss verified(calliper) %age wall thickness lost %age wall thickness lost Pass / Fail / N/A
23 Annular safety device tested Pressure & Duration Pressure & Duration Pass / Fail / N/A
Well Services ConclusionNo. Investigation Conclusion
1 Is original integrity issue(s) still evident? Yes / No
2 Have any other integrity issues been identified? Yes / No
Comments
Sign offWork Completed by
Date Completed
Supervisor Name
ApprovalConclusions reviewed and approved by
Date
Approved