Why SAP customers are migrating to DB2 - IBM Polic_Why SAP... · 7/16/2012 · Oracle 10g: January...
Transcript of Why SAP customers are migrating to DB2 - IBM Polic_Why SAP... · 7/16/2012 · Oracle 10g: January...
© 2012 IBM CorporationOctober 23, 2012
Why SAP customers are migrating to DB2
Nikola PolicInformation Management Sales Professional SMMA & [email protected]
© 2012 IBM Corporation2
Agenda
IBM DB2 for SAP– Who has done it, and why?
IBM & SAP Partnership
DB2 Optimized for SAP– Key features that make DB2 unique
Next Steps– Validate your unique TCO story with a Business Value Assessment
© 2012 IBM Corporation3
Over 10.000 SAP Db2 Installations WW
© 2012 IBM Corporation4
SAP Runs DB2SAP IT adopted DB2 in early 2000
Use of DB2 for SAP‘s R&D and business systemsSAP runs more than 1000 SAP systems on DB2
Research and DevelopmentAlmost every major SAP product is either developed or undergoes its QA on DB2DB2 is a major R&D platform at SAP
Business systemsSAP has migrated its major business systems to DB2 SAP’s HR, ERP, CRM and BW run on DB2
More information:Read the SAP IT reference story:ftp://ftp.software.ibm.com/software/emea/de/info/SAP-IT-GK12-4205-00.pdfWatch the SAP IT reference video:http://www.ibm.com/software/info/television/html/Q995397J91419F15.html
© 2012 IBM Corporation5
Why Are SAP Customers Selecting DB2 ? IBM solutions top SAP Certified BenchmarksDB2 compression reduces network traffic, memory utilizationData Partitioning Improves SAP BW PerformanceImprovements in Interactive and Batch Performance
DBACockpit improves DBA productivity up to 30%Automated Memory and Storage Integrated Backup / Recovery / RestoreOne Stop Support Via SAPDB2 Follows SAP 7+2 Maint – No Forced UpgradesCo-Development Provides Rapid SAP Certification
Minimize storage footprint by 55%-68%Lower infrastructure costs via compression, improved performanceAvoid unnecessary upgradesComplete out-of-the-box solutionSupport Across Hardware / OS PlatformsSAP OEM Pricing / Packaging
Tota
l val
ue to
you
r org
aniz
atio
n
Optimize Performance
Operational Excellence
Reduce Costs1000+ customers have chosen IBM DB2 in the past 18 months, all 100% successful
5
© 2012 IBM Corporation6
DB2 for SAP – Faster, Better, Cheaper
Reduces total SAP Database Infrastructure Cost ~ 20%
Reduces SAP storage needs compared to Oracle 55 %- 68%
Reduces license and maintenance cost via SAP OEM 38% - 74%
Reduces Administrative Tasks 25%
#1 in performance to SAP customers:
– Faster than Oracle for R/3 20+%
– Faster than Oracle for BW 40+%
– Unlimited scale out for SAP BW above 100 TB
The Strategic Database for SAP: – Faster access to leverage new database advances for SAP 2+ Years– Integrated, joint development, service and support– Aligned maintenance schedules
IBM provides enablement services for migrating to DB2 as well as Valuepost migration services to train and mentor the DBA/BASIS teams
Note: Numbers are calculate based on our actual customers during Proof of Concepts and actual migrations. They are validated in our customer testimonials included in this information set.
Joint IBM and SAP initiatives have dramatically improved the performance and functionality of DB2 for SAP since 2005 beyond the reach of other database vendors.
© 2012 IBM Corporation7
Two Companies, One Product
IBM and SAP partner through everystage of the software life cycle
Long term, joint product roadmaps
Jointly staffed development,testing, and support teams
SAP certifies every DB2 version and fixpack– Risk free early adoption of new technology
IBM and SAP align release, maintenance and support cycles
IBM and SAP share a partnership unparalleled in the industry
© 2012 IBM Corporation8
DB2-SAP: Strategic Technology Alignment and Support Database version
Database GA SAP DB GA Delay between database and SAP
GA (in months)
SAP DB support until
DB2 8.2 29th April 2005 3rd June 2005 1 31.12.2015*DB2 9.1 28th July 2006 31st August
20061 31.12.2017*
DB2 9.5 31st October 2008
20th Dec 2008 2 31.12.2017*
DB2 9.7 26th June 2009 28th August 2009
2 31.12.2022*
DB2 10 4th April 2012 June 2012** 2 31.12.2022*Oracle 9i June 2001 Q1/2003 21 31.07.2008Oracle 10g January 2004 Q3/2006 31 31.07.2011Oracle 11g July 2007 Q2/2010 33 January 2015
Joint DB2 & SAP development: Early tests during the implementation in Toronto + Walldorf DB2 between 1-2 months delay supported by SAPDB2 supports existing database version for a long time (DB2 8.2 support ends after Oracle 11.2g de-support)
Relaxed long-term project planning combined with usage of most current DB2 technology
© 2012 IBM Corporation9
SAP Certification for DB2 10.1
Certification date: July 16, 2012
DB2 10 support for applications based on SAP NetWeaver 7.00 SR3 and higher only– Certification for older SAP releases not planned
Planned SAP code adaptations/enhancements:– DB6CONV and R3load (for ITC and Adaptive Compression)– DBA Cockpit– db6_update_db, ABAP Dictionary
SAP Notes for DB2 10Note 1700631 - DB6: Using DB2 V10.1 with SAP SoftwareNote 1645684 - DB6: Upgrade to Version 10.1 of DB2 LUWNote 1692571 - DB6: DB2 10 Standard Parameter Settings
© 2012 IBM Corporation10
DB2 OEM Licensing from SAPDB2 OEM Bundles for SAP are procured through SAP
DB2 OEM Licenses are priced based on the SAP Application Value (SAV)
DB2 OEM Bundle for SAP license includes– DB2 Enterprise Server Edition (ESE) – DB2 Database Partitioning Feature (DPF)
• only available on DB2– DB2 Deep Compression– DB2 Multi-Dimensional Clustering (MDC)
• only available on DB2– DB2 High Availability Disaster Recovery (HADR)– DB2 Workload Management control of SAP
transactions and users• only available on DB2
Maintenance billed as part of SAP maintenance – 22% of OEM Bundle cost
Not AvailableNLS Archiving for SAP BW
Active Data Guard:
Additional
High Availabiliity / Failover for DR
Not AvailableMulti-Dimensional Clustering
(Less optimal)
Database Compression
RAC: Additional
Database Partitioning
Enterprise Database
OracleDB2 OEM for SAP
Function
SAP OEM Cost (% of SAV) 8% 15%
Not AvailableWLM Control of SAP users and transactions
© 2012 IBM Corporation11
Result from a recent compression PoC – Insurance Co.
Size (GB)
Other old Release Non-Compressed 545,91
Other new Release Compressed 297,04
DB2 9.7 Compressed 188,80
© 2012 IBM Corporation12
Compression – History since 2006DB2 compression including temporary and log file space– DB2 9.1: Average database storage factor ~2 (45%)– DB2 9.7: Average database storage factor ~3 (70%)*– DB2 10 : Average database storage factor ~5 (80%)*
Until now every three years enhancements with higher compression than before
80%
2006 2009 2012
* Savings without compression of temporary data and compression of log files about 5% lower
© 2012 IBM Corporation13
DB2 Superior Performance
DB2 outperforms Oracle in both benchmarks and customer POCs
© 2012 IBM Corporation14
Next steps
© 2012 IBM Corporation15
BVA: Engagement Process Overview
Identify Key Challenges
Determine As-Is Costs
Determine To-Be Costs
Financial Value
Integrated Business
Case
Define & Identify Problem/ Challenge
Identify Future Costs with DB2 (To-Be)
Financial Summary Business Case
Identify Costs Today without DB2 (As-Is)
Measure the Difference Between As-Is & To-Be
Typical BVA Engagement Duration: 2 days*
* This depends on how the BVA consultant is able to gather information from the client.
© 2012 IBM Corporation16
Example BVA Cost Comparison Output
© 2012 IBM Corporation17
Example BVA Investment Benefit Flow
© 2010 IBM Corporation18
Cost Savings with IBM DB2 (Actual examples)…
Client Data / CPU size 3 year Savings 5 Year Savings
Large North American Airline 64 Cores; 12.25 TB
$1.17M $2.62M
Large Consumer (Food/Beverage) - 1
90 Cores;219 TB
$5.29M $8.45M
Large Consumer (Food/Beverage) – 2
90 Cores;22TB
$1.92M $3.69M
Large North American Pharma 37 TB10.85 TB
$5.12M $5.98M
Large North American Consumer (FMCG)
90 Cores;219 TB
$5.99M $6.59M
Many customers achieve a positive ROI within the first 12-18 months.
© 2010 IBM Corporation19
IBM Migration Offering for SAP
IBM delivers FIX PRICE SAP DB2 migrations worldwide – long track record of successful migration projects
Safe and reliable procedures to mitigate risk are in place
SAP migration process and tools owned by SAP
SAP OS/DB migrations are business as usual
Different migration methods available for any customer business downtime requirement
© 2012 IBM Corporation20
Coca Cola Bottling Company Consolidated
Challenges:Improve performance, scalability, and efficiency for their SAP environment
Benefits:Predicted savings in the next five years of US $750,000
55%+ reduction in database size – DB2 9.7
Better performance – up to 65% faster
Reduced IT staff workload
Solution:Tightly integrated IBM Power Systems and DB2 solution. Implemented “Easy button” configuration for SAP
“
“
By choosing to implement DB2 compression right away, we have reduced the database size by around 40%. This gives us faster backup and reduced storage costs, and makes the SAP technical upgrades easier and quicker.
-- Andrew Juarez, SAP Lead Basis, Coca Cola Bottling Company Consolidated
20
© 2012 IBM Corporation21
SAP System AP6 - AHM Logistic and Production
Database size– 3.6 TB before migration (Oracle)– 1.5 TB after migration ( DB2)– Database size reduction between 53% and 73%– Backup time reduced from 10 hours to 2 hours
Dialog Response times– Key trans. response time improvement of 40%– Average response time improvment of 27%
Batch processing– Runtime in average reduced by 50%
Memory consumption of SAP Database– 45% less DB-RAM , 91% less RAM-SWAP
AUDI
© 2012 IBM Corporation22
Key performance criterionRecovery of a day’s work: Recover database and roll forward 500GB of logs
Disaster recovery of a day’s work: Database recovery from tape plus roll forward 2TBs of logs
Daily backup to tape: Full day’s backup to tape
Daily backup to disk: Complete processing of incremental FlashCopy of production day
Nestlé case study: Worlds largest SAP BW at 60 TB
Software• SAP NetWeaver 7.0• IBM DB2 V9• Tivoli Storage Manager
Hardware• IBM p595 with AIX 5.3• IBM DS8300 Turbo• IBM 3584 Table Library
8 hrs2hr 40min
24 hrs10 hrs
12 hrs6hr 10min
8 hrs30 min
Requirement Attained with DB2
Solution Stack
© 2012 IBM Corporation23
Next StepsBuild DB2/SAP business case specific for each client– Completed migration questionnaire needed
Attend a technical briefing of DB2/SAP technology benefits– Can be done in 1-2 hours at the customer site– Can also be held at the IBM Development sites in Toronto or San Jose
Run technical DB2/SAP workshop on site at your location– Free of charge provided by IBM and SAP for SAP infrastructures– Free of charge provided by IBM and GlassHouse for other infrastructures
Perfom DB2 Proof of Concept based on your environment– Free of charge migration performed by IBM for Proof of Concept
Perform reference customer calls/visit– See what our customers are saying first hand
Risk Free FIXED Price Migration offering from IBM forSAP infrastructures
© 2012 IBM Corporation24
© 2012 IBM Corporation25
© 2012 IBM Corporation26
Q&A?
© 2012 IBM Corporation27
Thank you!