Why does the current code require...

11
1 CTBUH 2014 Shangai Conference ADVANCES IN SEISMIC DESIGN AND CONSTRUCTION IN INDONESIA Davy Sukamta Davy Sukamta Davy Sukamta Davy Sukamta Principal, Davy Sukamta & Partners – Structural Engineers President,Indonesian Society of Civil&Structural Engineers CTBUH 2014 Shangai Conference ISEMS, 7-8 November 2013 Why does the current code require improvements ? Why does the current code require improvements ? Why does the current code require improvements ? Why does the current code require improvements ? 1. To considers recent great earthquakes in Indonesia USGS Aceh Earthquake Mw=9.1 (December, 2004) Yogya Earthquake Mw=6.3 (May, 2006) Tasik Earthquake Mw=7.4 (Sept, 2009) Padang Earthquake Mw=7.6 (Sept, 2009) Jambi EarthquakeMw=6.6 (Oct, 2009) Nias Earthquake Mw=8.6 (March, 2005) Courtesy Masyhur Irsyam Recent major earthquakes, Western Indonesia CTBUH 2014 Shangai Conference Damage to engineered structure

Transcript of Why does the current code require...

1

CTBUH 2014 Shangai Conference

ADVANCES IN SEISMIC DESIGN

AND CONSTRUCTION IN INDONESIA

Davy SukamtaDavy SukamtaDavy SukamtaDavy SukamtaPrincipal, Davy Sukamta & Partners – Structural EngineersPresident,Indonesian Society of Civil&Structural Engineers

CTBUH 2014 Shangai Conference

ISEMS, 7-8 November 2013

Why does the current code require improvements ?Why does the current code require improvements ?Why does the current code require improvements ?Why does the current code require improvements ?

1. To considers recent great earthquakes in Indonesia

USGS

Aceh Earthquake Mw=9.1 (December, 2004)

Yogya Earthquake Mw=6.3 (May, 2006)

Tasik Earthquake Mw=7.4 (Sept, 2009)

Padang Earthquake Mw=7.6 (Sept, 2009)

Jambi EarthquakeMw=6.6 (Oct, 2009)

Nias Earthquake Mw=8.6(March, 2005)

Courtesy Masyhur IrsyamRecent major earthquakes, Western Indonesia

CTBUH 2014 Shangai Conference

Damage to engineered structure

2

CTBUH 2014 Shangai Conference CTBUH 2014 Shangai Conference

Advances inSeismic Design And Construction

for High-Rise BuildingsIn Indonesia

1. Issuance of New Seismic Resistant Design Code (2012)

2. Use of Nonlinear Pushover Analysis andPerformance-Based Seismic Design for High-Rise Buildings In Design Office

3. Application of Base Isolation System for High-Rise Buildings

CTBUH 2014 Shangai Conference

IBC 2011

ASCE 7-05ASCE 7-10

UPDATING THE CODERef.Prof.Masyhur Irsyam

SNI-2002

3 maps for 500-yr EQ and 3 for 2500-yr EQa.PGAb.Spectra at 0.2 secc.Spectra at 1.0 sec

SNI-2012

What are the changes?

3

CTBUH 2014 Shangai Conference

( Irsyam et al,2010)

Mw for Seismic hazard map 2010

CTBUH 2014 Shangai Conference

( Irsyam et al,2010)

CTBUH 2014 Shangai Conference

Many provisions of ASCE 7-10 have been included in the SNI:1726-2012

CTBUH 2014 Shangai Conference

New Provisions

Vertical Irregularities

Horizontal Irregularities

Seismic Design Categories

Redundancy Factors

Generating Design Response Spectrum

4

CTBUH 2014 Shangai Conference

The Pakubuwono Signature

- 50-story 250-M high- RC core wall & outrigger

- First building analyzed withPBSD method in Indonesia

- Structural Engineer: Davy Sukamta & Partners- Completed in 2014

The use of PERFORMANCE-BASED SEISMIC DESIGN

CTBUH 2014 Shangai Conference

PAKUBUWONO SIGNATURE

Floor-to-floor 3.85mRC Core wall and Outriggers as lateral resisting systemWall thickness 650 mmOutrigger Beam 3-story deepExpected inelastic action at coupling beams, base of core wall, both ends of outrigger columns

Designed in accordance with PEER-TBI Guidelines

CTBUH 2014 Shangai Conference

3-D Nonlinear Model

core wall

hinge zones

Basement structure is includedModel is fixed at the mat foundation level

SSI is not included

CTBUH 2014 Shangai Conference

CHICHI RECORD

3-D VIEW Y-AXIS X-AXIS

5

CTBUH 2014 Shangai Conference CTBUH 2014 Shangai Conference

CTBUH 2014 Shangai Conference CTBUH 2014 Shangai Conference

6

CTBUH 2014 Shangai Conference CTBUH 2014 Shangai Conference

� Loma Prieta 1989 – $7 Billion

� $450 Million per Second

� Northridge 1994 - $30 Billion

� $2 billion per second!

� Kobe 1995 - $150 - $200 Billion

� $7.5 billion per second!!

Earthquakes Can Be Catastrophic And Very Expensive

CTBUH 2014 Shangai Conference

Fundamental principle of base isolation: modify the response of the building so that the ground can move below the buildings without transmitting these motion into the building.

CTBUH 2014 Shangai Conference

7

CTBUH 2014 Shangai Conference

Plan of Base Isolators

16 nos HDRB HH130 -6R24 nos HDRB HH150-6R

HDRB

CTBUH 2014 Shangai Conference

Courtesy: Bridgestone,Japan

CTBUH 2014 Shangai Conference

Lateral Resistant System: RC Corewall+Outriggerand Seismic Steel Moment Frame, with HDRB

CTBUH 2014 Shangai Conference

Structural Scheme – Outrigger Floor

Shear Link

Outrigger Beam

8

CTBUH 2014 Shangai Conference

Outrigger

RC core wall

NomorPeriodeGetar Nomor

Periode Getar Faktor Partisipasi Mass (%)

Ragam (detik) Ragam (detik) X-trans Y-trans Rz-rotn1 1.657 1 1.657 0.00 58.08 0.012 1.453 2 1.453 54.97 0.00 0.033 1.012 3 1.012 0.01 0.00 65.31

Fixed-base Structure

Nomor Periode Getar Faktor Partisipasi Mass (%)Ragam (detik) X-trans Y-trans Rz-rotn

1 4.233 0.00 99.05 0.002 4.160 99.20 0.00 0.183 3.454 0.18 0.00 99.81

Base-isolated Structure

Dynamic Characteristic ofBased-Isolated vs Fixed-Base Structure

OutriggerColumn

1.657 sec → 4.233 sec

CTBUH 2014 Shangai Conference

R=2.0 CD=2.0

R=6.0 CD=5.0

Performance of Seismically Isolated Structure vs Conventional Structure

CTBUH 2014 Shangai Conference

Seismic design detailings are put in place with strict supervision to the works, starting from foundation:- Confinement of pile- Diameter of bend- Length of hook

CTBUH 2014 Shangai Conference

9

CTBUH 2014 Shangai Conference CTBUH 2014 Shangai Conference

PURI MATAHARI TOWER

JAKARTA

27-storyBase-isolated structure

Typical Floor Plan

CTBUH 2014 Shangai Conference

Base Isolation Plan

7 nos.HT090x6R9 nos.HT120x6R10nos.HT130x6R12nos.HT160x6R

CTBUH 2014 Shangai Conference

Area Mode

Periode

Modal Participating Mass Ratios (%Mass)

(detik) Ux-Trans Uy-Trans Rt-trans

Tower

1 1.899 57.90 0.07 0.00

2 1.755 0.06 59.96 1.11

3 1.308 0.01 0.50 65.13

Base-isolated Structure

Fixed-based Structure

1.899sec 3.755sec

10

CTBUH 2014 Shangai Conference

ETABS Model BM Diagram of Core Wall

CTBUH 2014 Shangai Conference

Fixed-Base Isolated Base

V=77436 kN

V=12906 kN

V=39946 kN

V=19973 kN

Non-linear Push-over Analysis

Direction

CTBUH 2014 Shangai Conference

Fixed-Base Isolated Base

V=12906 kN

V=77436 kN

V=39946 kN

V=19973 kN

Non-linear Push-over Analysis

Direction

CTBUH 2014 Shangai Conference

0

5

10

15

20

25

30

35

40

45

0 0.2 0.4 0.6 0.8 1 1.2

Ba

se S

he

ar

(x1

00

0K

N)

Displacement (m)

Base Shear vs Displacement (PUSH-1)

ISOLATOR

DISPLACEMENT

ROOF DISPLACEMENT

0

1000

2000

3000

4000

5000

6000

0 0.02 0.04 0.06 0.08 0.1

Ba

se S

he

ar

(x1

00

0K

N)

Displacement (m)

Base Shear vs Displacement (PUSH-2)

ISOLATOR

DISPLACEMENT

ROOF DISPLACEMENT

11

CTBUH 2014 Shangai Conference

R=2.0 CD=2.0

R=6.0 CD=5.0

Fully Operational

Fema 356 CP

Fema 356 LS

Fema 356 IO

Performance of Seismically Isolated Structure vs Conventional Structure

CTBUH 2014 Shangai Conference

The Puri Matahari Tower under construction

CTBUH 2014 Shangai Conference

http://www.davysukamta.com

TTTTHANK YOUHANK YOUHANK YOUHANK YOU

News / Articles / CTBUH2014