Whitney Museum Capital Campaign
ALEXANDRA WHEELER
Whitney Museum of American Art Expansion History
New Building Facts
o Nine-story, over 200,000 square foot building
o More than 50,000 square feet of gallery space, half for showcasing the permanent
collection and half for special exhibitions and artist
o Approximately 13,000 square feet of outdoor space for artist projects, exhibitions, and
performances
o Dedicated Education Center including classroom and studio spaces
o Theatre complex with 170 retractable seats and dramatic double-height views of the
Hudson River
o Black box theatre with adjacent outdoor gallery for simultaneous indoor/outdoor
programming
o Conservation lab, Works on Paper Study Center, and Library Reading Room
o Ground floor restaurant and eighth floor café
o Retail shop
o Approximately 8,500 square foot outdoor plaza or ”largo”
o Pursuing LEED Gold rating
ORIGINAL GOAL (2007)
REVISED GOAL (May 2010)
REVISED GOAL (Jan 2011)
FINAL GOAL (Mar 2013)
575,000 590,000 625,000 665,000
Campaign Goal History
• Since 2007 total campaign goal increase of $90M or 16%
• Benchmarking analysis for 11 recent museum campaigns: • all increased goal• 8 of 11 increased 2-3 times• range from 16% (WMAA) to 138%
Campaign Purpose and Progress to Date
• Campaign sources include Trustees, Individuals, Government, Foundations, Corporations and an Art Auction.
• Trustee giving anticipated to be 61% of total funds raised
SOURCES(in thousands)
Goal Raised to Date
Fundraising 665,000 469,696
Real Estate Assets 95,000 95,000
Total Project Goal 760,000 564,696
71%
74%
USES (in thousands)
Construction Costs (inclusive of land purchase) With over 200,000 square feet, the Museum will increase its gallery space by 60% and triple its total space
422,000
Endowment Increasing the endowment is critical to securing the financial foundation of the Whitney’s future home.
225,000
Capacity Building Providing essential ramp up support associated with transitioning to the new building and to ensure dynamic programming during this period.
113,000
TOTAL 760,000
Key Learnings over past 6 years
Northwestern view of Whitney site
December 2012
Southwestern view of Whitney site
March 2013