Did you know?
Indoor traffic will grow in 2020 by** 600%
Source: 2016 Amdocs State of the RAN report*Source: ABI Research**
25%There are
more connectivity issues indoor than than outdoor*
Did you know?
Which means...
Source: 2016 Amdocs State of the RAN report*Source: ABI Research**
Connectivity will explode if you don’t address it now!
Imperative to get it right the first time
Dependable enterprise networks now more business-critical than ever.
A poorly planned network will cost a lotof time and money.
HOSPITALITY SECTOR:of customers will pay more for a better experiencewill switch carriers due to bad experience
86%
62%
Carrier-grade quality for enterprise networksiBwave is the software standard adopted and mandated by carriers worldwide for planning indoor networks.
CARRIER GRADE QUALITY
ACCURATE PREDICTABILITY
CONSISTENCY OFCONNECTIVITY
AIRPORTHetNet
PUBLICSAFETY
Wi-Fi
SUBWAY
ENTERPRISE
Any technology, any venue, any vendor
STADIUM
SMALLCELLS
DAS
Steps for proper carrier-grade design for an enterprise
Define end-user experience1
Design all aspects of the network2
Iterate to optimize design while meeting KPIs3
Generate reports/documentation (with full BoM)4
• Building structure & layout• Equipment room,
facilities & logistics• Backhaul
• RF based on right KPIs• Cabling runs• Active and passive
elements
Capacity Planning: One size doesn’t fit all
How many users in any given region?
What is their behaviour?
Case Study: Hotel
5-star business hotel complex in Asia
600,000 sq. ft. / 14 floors / 437 rooms
1,500 to 4,000 Users
3 hours access per day
Hotel Case Study: Requirements
TECHNOLOGIES
KPIs
LTE2.3 GHz
Wi-Fi2.4GHz / 5GHz
3 Mb/s per userRSRP -98 dBm > 95% areaWi-Fi -65/70 dBm > 95% area
Hotel Case Study: Methodology
BUS. CASE SURVEY DESIGN BUILD MAINTAIN
Project Info from Internal tool
Survey & Prelim. Design
Design validation & optimization
Installation &as-built changes
Workflow mgmt &Future upgrades
Hotel Case Study: Results
390SMALL CELLS
7REPORTS
17kmOF TOTAL CABLING
§ Equipment list§ Output map§ Cable routing§ Cost details§ Annotation§ Compliancy§ Capacity
Hotel Case Study: Results
COMPLETED IN
3 days1Visit
TRADITIONALLY
10 days3-4 Visit
70% TIME / MONEYSAVED
Summary
PLANNINGEND-USERTECHNOLOGIESCOMPLIANCEDOCUMENT
Proper planning now imperative
Clear understanding of end-user experience requirements
Consider all technologies and aspects of venue
Design for KPI compliance by floor and high density hotspots
Document (and store centrally) all deployment phases