Vapor Intrusion at a Former Dry Cleaner in Southeast Wisconsin
When bad things happen to good people….
Working with State and Local Health Departments
![Page 2: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/2.jpg)
• 2 story, stand-alone building• 1st level now vacant –
formerly occupied by dry cleaner
• 2 apartments occupy second level
• Concrete block• Slab on grade• Garage under north apartment
![Page 3: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/3.jpg)
August 2008
June 2009
Jan 2010
Notification – 08/27/08
Consultant Selection/Scope Approval – 08/28/08 to 06/18/09 – 10 months
Indoor Air Testing/Health Posting – 12/31/09 to 02/15/10 – 46 days
Timeline of Actions
Soil Data Received – 08/25/09
![Page 4: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/4.jpg)
18,000 ug/kg
1,900 ug/kg
64,000 ug/kg
32 ug/kg
Staining on floor
Boiler room – former drum storage
N
Shallow soil – PCE concentrations
Hole in floor
48 ug/kg
![Page 5: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/5.jpg)
August 2008
June 2009
Jan 2010
Notification – 08/27/08
Consultant Selection/Scope Approval – 08/28/08 to 06/18/09 – 10 months
Timeline of Actions
Soil Data Rec’d/Scoping for Air Sampling – 08/25/09 to 11/24/09 – 3 months
![Page 6: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/6.jpg)
First Level – former drycleaner space – now vacant
East wall – floor stained – GP3 in bottom left corner (1,900 ug/kg PCE)
South end – front of store
![Page 7: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/7.jpg)
Looking south towards store front area
Looking north into boiler room
Standing on the approximate location of GP-5(18,000 ug/kg PCE)
![Page 8: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/8.jpg)
Sewer Repair resulted in floor opening – direct pathway for vapor migration
Close-up of holeWest wall, beneath
the south apartment
![Page 9: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/9.jpg)
Indoor air sample locations - apartments
![Page 10: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/10.jpg)
Outdoor (Background) Sample
Near northeast Corner of Building
![Page 11: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/11.jpg)
Air Sample Results – Tetrachlorethylene (ppbv) DNR Target Level = .603 ppbv
Health Department Action Level = 6.03 ppbv
Date South Apartment
North Apartment
12/09/09 52 264
1/11/10 11.5 26.1
Date Main Level – Former DC space
12/09/09 40
01/11/10 1.5
Outside
ND
ND
![Page 12: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/12.jpg)
January 11 to 25th, 2010
Building owner personally undertakes intervention
measures
![Page 13: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/13.jpg)
Installed vent fan to vent the sub-slab airspace on the first floor
![Page 14: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/14.jpg)
Sealed concrete block spaces in back part of first level
![Page 15: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/15.jpg)
Boiler Room floor and wall sealing
![Page 16: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/16.jpg)
Removed carpet – Cleaned and sealed floor cracks on first level
![Page 17: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/17.jpg)
Sealed hole around sewer pipe on first level
![Page 18: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/18.jpg)
Sealed utility penetrations leading to the second floor apartments
![Page 19: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/19.jpg)
Air Sample Results – Tetrachlorethylene (ppbv) DNR Target Level = .603 ppbv
Health Department Action Level = 6.03 ppbv
Date South Apartment
North Apartment
12/09/09 52 264
1/11/10 11.5 26.11/26/10 6 22.9
Date Main Level – Former DC space
12/09/09 40
01/11/10 1.5
01/26/10 4.3
Outside
ND
ND
ND
![Page 20: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/20.jpg)
PCE concentrations in indoor air vs. Agency targets (Upstairs South Apartment)
6
11.5
52
0
10
20
30
40
50
60
12/10/09 12/18/09 12/26/09 01/03/10 01/11/10 01/19/10 01/27/10
Sample events
ppbv
DNR Target Concentration 1 in 100,000 excess cancer risk = 0.6 ppbvHealth Dept Limit - 1 in 10,000 excess cancer risk = 6 ppbvUpstairs South Apartment Levels
![Page 21: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/21.jpg)
PCE concentrations in indoor air vs. Agency targets (Upstairs North Apartment)
264
26.1 22.90
50
100
150
200
250
300
12/10/09 12/18/09 12/26/09 01/03/10 01/11/10 01/19/10 01/27/10
Sample events
ppbv
DNR Target Concentration 1 in 100,000 excess cancer risk = 0.6 ppbvHealth Dept Limit - 1 in 10,000 excess cancer risk = 6 ppbvUpstairs North Apartment Levels
![Page 22: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/22.jpg)
PCE concentrations in indoor air vs. Agency targets (First Floor Storefront)
4.3
40
1.505
1015202530354045
12/10/09 12/18/09 12/26/09 01/03/10 01/11/10 01/19/10 01/27/10
Sample events
ppbv
DNR Target Concentration 1 in 100,000 excess cancer risk = 0.6 ppbvHealth Dept Limit - 1 in 10,000 excess cancer risk = 6 ppbvFirst Floor Storefront Levels
![Page 23: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/23.jpg)
August 2008
June 2009
Jan 2010
Notification – 08/27/08
Consultant Selection/Scope Approval – 08/28/08 to 06/18/09 – 10 months
Soil Data Rec’d/Scoping for Air Sampling – 08/25/09 to 11/24/09 – 3 months
Indoor Air Testing/Health Posting – 12/31/09 to 02/15/10 – 46 days
Timeline of Actions
![Page 24: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/24.jpg)
2011 Update• Owner has received DERF reimbursement for
investigation and mitigation actions taken through February 2010
• Building remains unoccupied since February 2010• Mitigation fan has been running since installation• Owner has cleaned, sealed and painted floor in first
level• Added a small fan to vent sub-floor space below
boiler room• Cleaned interior walls of apartments (carpet cleaned
or replaced)
![Page 25: When bad things happen to good people….dnr.wi.gov/topic/Brownfields/documents/vapor/mylotta.pdf18,000 ug/kg. 1,900 ug/kg. 64,000 ug/kg. 32 ug/kg. Staining on floor. Boiler room –](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8c4425d1925272e46e4b73/html5/thumbnails/25.jpg)
Special Thanks to:
• Henry Nehls Lowe – for responsive, calm, thoughtful approach
• Terry Evanson – for providing a sounding board for technical and policy issues
• South Milwaukee Health Department – for willingness to learn, cooperative actions and taking the lead on health department response