WHAT YOU SHOULD EXPECT FROM YOUR EVALUATOR: PROMISING PRACTICAL PRACTICES July 28, 2011 Hi-TEC...
-
Upload
cody-henry -
Category
Documents
-
view
215 -
download
1
Transcript of WHAT YOU SHOULD EXPECT FROM YOUR EVALUATOR: PROMISING PRACTICAL PRACTICES July 28, 2011 Hi-TEC...
WHAT YOU SHOULD EXPECT FROM YOUR
EVALUATOR: PROMISING PRACTICAL
PRACTICESJuly 28, 2011 Hi-TEC Conference, San Francisco
Three perspectives
Experienced ATE Program manager: Lara Smith
Experienced community college professional and researcher: Dr. Jerry Somerville
Experienced ATE evaluator and researcher: Dr. Norena Norton Badway
Who is in attendance?
Community College University High School Workforce Development
Advocate Trade Organization Industry Professional Technician ATE Personnel ATE Project or Center Director Program Evaluator Researcher
What is Evaluation?
It is a form of research
The results are to be used
Its purpose is to educate Assist in making informed decisions
Information Needs of ATE Programs Using a Delphi Process (an elaborate
survey) we asked ATE leaders about the most important information needs.
Purpose: to identify research topics that researchers could study that would produce meaningful results for practitioners.
We hoped to overcome the issue that results from research/ evaluation are not used in practice.
A Few of Our Findings
Program directors desire meaningful and usable results for program improvement
Practitioners feel that from their experience they know what works and what doesn't
They don’t have the time or expertise to conduct research
They want someone else to collect, analyze and synthesize the data and then disseminate the results in a meaningful form
Our Belief
Practitioners are the primary users of the information generated from evaluation/research.
If it is to be useful, practitioners need to
be actively involved in working with evaluators/researchers.
Dissemination:Suggestions by ATE Leaders
Offer sessions at ATE/HI-TEC types of conferences
Make more use of Webinars Publish a periodical that digests both
promising practices and unsuccessful methods and presents them in briefs.
Create a listserv for ATE project and center directors so they can communicate with each other.
Dissemination Beyond ATE: Community College Related
Community College Journal of Research and PracticeServes researchers and practitioners in higher education and the behavioral and social sciences.
Journal for Applied Research in Community Colleges Serves institutional research and planning professionals in 2-year, postsecondary educational institutions
The Community College Review Deals with all aspects of community college administration, education, and policy.
Dissemination Beyond ATE: STEM Related JournalsJournal of STEM EducationEmphasizes real-world case studies that focus on issues that are relevant and important to STEM practitioners
Research in Science & Technology EducationPublishes original research from throughout the world dealing with science education and/or technological education
Dissemination Beyond ATE: CTE Related JournalsJournal of Career and Technical EducationServes as a forum for discussion of philosophy, theory, practice, and issues in career and technical education.
Career and Technical Education ResearchPublishes articles that examine research in vocational/career and technical education, career development, human resource development, career issues in grades K-12, postsecondary education, adult and lifelong learning, and workforce education.
WHY do Evaluation?
ATE requires it Acts as a “mirror” so you can see what
you are doing Lends legitimacy/ evidence to your
claims of achievement or challenges Is a tool for professional development for
staff and stakeholders [measuring impact on student learning]
Offers collaboration for dissemination
Who Should You Select as Evaluator? Match personally and professionally Experienced with ATE and CCs Applies evidence-based/ research
theoretic framework Moves beyond “body counts” Analyzes, rather than audits Partners, rather than judges Provides sample report(s) Evalua|t|e website
Measuring IMPACT
Impact on student learning Impact on faculty learning
Impact on faculty technical knowledge Impact on pedagogy Impact on curriculum design
Impact on organizational learning Structure of program/ schedule of courses
Expanding access and success
Establish Scope of Work (SOW) Accompanies contract Defines activities;
deliverables Allows evaluator to invoice Allows project to pay
Cost Proposal
Start with Scope of Work Decide on hourly or fixed payment Establish number of site visits and/or
other travel Establish number and type of reports
Budget Example
Evaluation expenses
$50,000 fixed fee
+ $9,965 expenses$59,965
Where are the negotiation points?
6.7%7
Project Budget
$900,000 ÷ 3$300,000 per year
For more information
Norena Norton Badway [email protected]
Jerry Somerville [email protected]
Lara Smith [email protected]