What to Expect for FY 2017
Implementation Overview of the
Grant Pre-Award Phase
![Page 2: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/2.jpg)
FY 2017
Not Your Traditional Fiscal Year
The “no budget” challenge
Implementation of new state-wide grants
management policies, procedures and templates
Enforcement of Uniform Guidance governing
Administrative Requirements, Cost Principles, and
Audit Requirements
Enforcement of GATA legislation
2
![Page 3: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/3.jpg)
Highlights of What to Expect in FY 2017
Restatement of the GATA Implementation
Structure
GATA Agency Advisory Workgroup
Overview of the grant pre-award phase
GATA roles and responsibilities: GATU, agencies,
grantees
GATA training
3
![Page 4: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/4.jpg)
GATA Implementation Structure
Rulemaking Phase
GATA workgroups reviewed regulations and made rule recommendations, where applicable
State rules cannot be less stringent than federal rules
Only 9 modification recommendations were made to 2 CFR 200
Implementation Phase
GATA workgroups established frameworks for state-wide implementation of the rules
Frameworks must allow flexibility for unique requirements of agencies and grant programs
Frameworks include templates, policies and procedures for uniform, state-wide use
Monitoring Phase
GATA workgroups will propose enhancements to rules, templates, policies and procedures based on experience
4
![Page 5: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/5.jpg)
GATA Agency Advisory Workgroup
Refer to handout
5
![Page 6: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/6.jpg)
Overview of the Grant
Pre-Award Phase
6
![Page 7: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/7.jpg)
7
Grant Pre-Award Phase
grants.illinois.gov
(GATA Homepage)
Catalog of State
Financial
Assistance
(CSFA)
Grantee Portal
(External Site)
Pre-Register?
Grantee Pre-
Qualification
Questionnaire
Processing
Exit Site
YES NO
Qualifications
Verifications/
Valdiations
Qualified?
Not Qualified –
NO
REMEDIATION
AVAILABLE
Not Qualified –
REMEDIATION
AVAILABLE
QualifiedExit Site Tenure?
2 Years or Less as
Grantee – Hold on
Completion of ICQ
3 Years of more as
Grantee –
Continue to ICQ
Notice of Funding
Opportunity
(NOFO)
State Agency
Logon
(AD Account
Required)
Internal Controls
Questionnaire
(ICQ)
Portal
Grantee
Information
Database
Grant Application
(Agency Hosted)
Agency Application
Review Process
Application
Evaluation/Merit-
based Review
(Includes Fiscal,
Administrative and
Programmatic
Review, Risk
Rating and
Specific Conditions
Eligible to
Receive Grant?
Notification
of
Ineligibility
Execute Grant
(May include
Special
Conditions)
NO
YES
Notification of
Finalist
Completed
ICQ?
YES
NO
Catalog of State
Awards
![Page 8: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/8.jpg)
Front-end Grants Management through
grants.Illinois.gov
Illinois’ centralized grants management website
for state agencies, grantees, and the public
Provides access to:
Grantee portal for registration and pre-qualification
Financial and Administrative Risk Assessment
Catalog of State Financial Assistance (CSFA)
Notice of Funding Opportunity (NOFO)
List of executed grant agreements
8
![Page 9: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/9.jpg)
State User Functionality from
grants.Illinois.gov
State Debarred and Suspended List
Illinois Stop Pay List
Report Interface
Document Upload (to post NOFO, grant awards)
Grantee Portal Data (similar to the CRV)
9
![Page 10: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/10.jpg)
Catalog of State Financial Assistance
(CSFA)
Single, statewide, comprehensive source
document of all state financial assistance program
information
Complete list of all state and federal grants
available in Illinois – CSFA is static
State cognizant agencies will be determined
based on CSFA grant awards
Once automated, CSFA entries will populate fields
in the NOFO, grant application, grant agreement 10
![Page 11: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/11.jpg)
Pre-Qualification – Phase 1
30 ILCS 708/25(6)
Centralized, automated verification required before an
entity can receive a grant award
Current DUNS number
Current SAM Cage Code
Acceptable fiscal condition of the organization
Good standing with the Secretary of State
Not on the Illinois Debarred and Suspended or Stop Pay
List
Not on the Federal excluded Parties List
Not on the Sanctioned Party List (maintain by HFS)
11
![Page 12: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/12.jpg)
Phase 1 Notification
Entity will receive automated notification that
they are:
Not qualified – on Illinois Debarred and Suspended or the
Federal Excluded Parties List (no remedy available)
Non-qualified but can remediate – Stop Pay List, expired
DUNS number (notice will instruct on the remedy)
Qualified for a grant award
Once the entity is “qualified” they’re instructed
to complete Phase 2 of registration
Pre-qualification is required annually
12
![Page 13: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/13.jpg)
Pre-Qualification – Phase 2
Information Collection
Determine grant administration experience
2 years or less - fiscal and administrative risk assessment conducted after notification of a finalist for a grant award
3 or more years - fiscal and administrative risk conducted after pre-qualification
5 years or more - grantee is eligible for a multi-year award, if applicable under the terms of the award
Number of full time employees
Number of part time employees
13
![Page 14: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/14.jpg)
Pre-Qualification – Phase 2
List of Officers - Chief Executive Officer, Chief Financial Officer, Chief Operating Officer
Total revenue/expenditures in the most recent fiscal year from the following sources:
Direct Federal Grants
Federal Pass-through Grants
State Grants
Other
Entities with less than $20,000 in grant funds from all sources in the prior fiscal year take the fiscal and administrative risk assessment upon notification of grant award finalist
14
![Page 15: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/15.jpg)
Pre-award Risk Assessment
2 CFR 200.205(a) and (b) require a pre-award risk
assessment
Risk assessment framework will be automated for FY18
grant awards
Risk assessment parameters are specified in 2 CFR
200.205 with specific conditions in 2 CFR 200.207
Grantee must be notified of additional requirements due
to their risk profile
15
![Page 16: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/16.jpg)
Pre-award Risk Assessment Framework
Risk assessment framework is based on internal control
compliance requirements in 2 CFR 200.62 and
Compliance Supplement for reasonable assurance that:
Entity’s transactions will be properly recorded and accounted for
Entity’s transactions will be executed in compliance with
regulations, statutes, terms and conditions
Funds, property, and other assets will be safeguarded against
loss from unauthorized use or disposition
16
![Page 17: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/17.jpg)
Internal Control Questionnaire (ICQ)
Financial and Administrative Risk
GATA centralizes fiscal and administrative risk
assessment through the ICQ
Conducted once, annually for the entity
Centralized ICQ will be uniform for all agencies
GATU and the State Cognizant Agency will complete the
ICQ until the framework is automated
17
![Page 18: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/18.jpg)
Uniform Notice of Funding Opportunity
(NOFO)
Public notice is required for all competitive grants and cooperative agreements
NOFO is the public notice template for uniform, summary information required by 2 CFR 200, Appendix I
Agencies add grant-specific content
If FY17 notices have not been issued, use the NOFO; NOFO will be required in FY18 notices
Uniform Grant Agreement template is required for all FY17 grants
Agencies must perform a gap analysis to ensure all required information is collected to complete the new grant agreement
18
![Page 19: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/19.jpg)
Uniform Grant Application
Template based on federal application SF 424 including
All required data fields per 2 CFR 200, Appendix I
Agency-specific and applicant completed sections
Includes uniform budget template - required for FY17
Entities respond to NOFO requirements through their
application
If FY17 grant applications have not been issued, use the
uniform grant application; application required in FY18
Agencies must perform a gap analysis to ensure all required
information is collected to complete the new grant agreement
19
![Page 20: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/20.jpg)
Merit Based Review Policy
Required for all competitive (discretionary) grants
Includes uniform, required criteria for all agencies:
Need, Capacity, and Quality
Allows definitions and additional criteria based on grant
and agency requirements
Evaluation is based solely on criteria stated in grant
application in accordance with 2 CFR 200.204
Evaluation must be conducted by committee
Specifies the appeal process for grantees to agencies
Appeals limited to alleged process violations
20
![Page 21: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/21.jpg)
Programmatic Risk Assessment
2 CFR 200.205 (a) and (b) require pre-award programmatic
risk assessment of the applicant
Must include agency (grant) specific questions based on the
NOFO and unique requirements of the individual grant
Risk assessment parameters are specified in 2 CFR 200.205
with specific conditions in 2 CFR 200.207
Grantee must be notified of additional requirements due to their
risk profile
Applicant responses determine degree of programmatic risk
Programmatic monitoring will be based on the assessment
21
![Page 22: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/22.jpg)
Programmatic Risk Assessment (cont.)
GATA establishes a uniform framework and template to
evaluate programmatic risk of the applicant
Programmatic risk assessment framework will be
automated for FY18 grant awards; system-generated risk
profiles will be assigned
GATU and the State Cognizant Agency will complete the
programmatic risk assessment until the framework is
automated
22
![Page 23: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/23.jpg)
Uniform Grant Agreement
Uniform template with all required state and federal
clauses for grant agreements
Exhibits specify requirements and exceptions unique to
the agency and the grant
Prior to the agreement, the Notice of State Award
informs grantee of all requirements and special
conditions of the award
Includes the uniform budget and budget narrative
Uniform Grant Agreement and budget template are
required for FY17 grants
23
![Page 24: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/24.jpg)
Uniform Budget Template
and Budget Narrative
Budget templates includes standard summary line items
Specific reporting detail / requirements may be set by the
agency and are required to roll up to the summary budget
Budget must comply with 2 CFR 200.308 – Revision of
budget and program plans
Budget detail worksheet and narrative provide concise
support for each line item of expense
Budget template is required for FY17 grant awards
24
![Page 25: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/25.jpg)
Required Financial Reporting
Quarterly Financial Reporting (including Budget to Actual)
will use the budget template
Risk assessments may require more frequent reporting
Annual Financial Report will be required with the Audit
Must contain an “in relation to opinion” with the audited
financial statements
Performance Reporting will also be required quarterly and
must relate financial data to performance
accomplishments in accordance with 2 CFR 200.301
25
![Page 26: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/26.jpg)
Illinois Stop Payment List, State-wide
Debarred and Suspended List
GATU building State Debarred and Suspended List
Agencies should refer to the Stop Payment List prior to
entering or modifying any grant agreements
State-wide policy will establish uniform terms for invoking
stop payment status and uniform consequences for
grantees on stop payment status
Policies will be issued regarding enforcement of:
Illinois’ Stop Pay System
Illinois’ Debarred and Suspended List
26
![Page 27: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/27.jpg)
Indirect Cost Rate
States are required to accept federally negotiated
indirect cost rates
Research rates will be limited to research grants
Agencies must cite state or federal statute that
disallows indirect costs rates, places limitations on the
rates or caps salaries charged
Include statutes in the CSFA; send compiled list of statutes
to GATU for “exception” process review
Without statute, agencies must accept the negotiated
indirect cost rate
27
![Page 28: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/28.jpg)
If Statute Does Not Allow Indirect Costs
Agencies must use a matching requirement if the
grant does not allow indirect costs
Matching requirement must be increased if a
grant did not previously allow indirect cost rates
to be charged
28
![Page 29: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/29.jpg)
Indirect Cost Rate – Centralized Function
Leveraging the federal model, grantee indirect cost rates will be negotiated centrally
Approach authorized by Illinois’ Federal Cognizant Agency
Agencies will be required to accept the rate
Notice of Award in process
Selected Vendor will provide:
Web based system for grantee to enter required information or upload via Excel, Word documents
Training on preparing indirect cost rate proposal
Training on system to submit indirect cost rate proposal
Information on the negotiated indirect cost rates will be available to all agencies
29
![Page 30: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/30.jpg)
Negotiating the Indirect Cost Rate
State cognizant agency will approve rate with guidance from GATU
Appeals and disputes of rates will be handled by an Indirect Cost Rate Committee of:
Selected officials from the ICR Vendor staff
Volunteers from state agencies (termed)
GATU
Cognizant agency representatives
Grantees may submit an indirect cost rate proposal within 90 days of being granted an award. ICR Vendor will complete negotiated rate within 60 days.
During the negotiation process (up to 5 months) reimbursement of indirect payments must be decided (Federal examples: 10% de minimis rate, proposed rate, NO reimbursement until rate approved, 20% of Salaries and Wage)
30
![Page 31: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/31.jpg)
Implementing GATA - $$
GATU expenses will be charged through a revolving
fund
Agencies can use grant administration funds for
GATU expenses
31
![Page 32: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/32.jpg)
Agency Request for Exceptions and the
Illinois’ Office of the Auditor General
GATU has already been visited by the OAG
OAG will perform agency compliance testing for 2
CFR 200 and GATA
Federal and state audits will be evaluating agency
implementation of these requirements
Agency exception requests are being submitted to
Governor’s Compliance Officer for review
Agencies must comply with all GATA requirements
unless an exception is requested and granted 32
![Page 33: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/33.jpg)
GATA Roles and Responsibilities
Refer to handout
33
![Page 34: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/34.jpg)
GATA Training
34
![Page 35: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/35.jpg)
Training to Support the Pre-Award Phase
Full day of training 3/9 encompassed GATA and federal guidance overview, cost principles, pre-qualification and risk assessments, NOFO and grant application, merit based review, budget template, indirect cost rates, and grant agreement
Additional training coming in FY16:
Roles and responsibilities for GATA implementation
Completing the budget template and budget narrative; evaluating and approving the budget
Indirect cost rate negotiation
Grantee portal demonstration
Utilize a standing webinar schedule (periodic events) 35
![Page 36: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/36.jpg)
Agency Communication and Training Plans
What’s the status of implementing your agency’s
Communication and Training Plans for GATA?
Are all grant-related stakeholders engaged in GATA
implementation?
How are you informing your grantees of the changes?
What do you need from GATU and/or your Chief
Accountability Officer?
36
![Page 37: What to Expect for FY 2017 · 2016-07-20 · Highlights of What to Expect in FY 2017 Restatement of the GATA Implementation Structure GATA Agency Advisory Workgroup Overview of the](https://reader033.fdocuments.us/reader033/viewer/2022050304/5f6cbd82f90b4d2d574f576c/html5/thumbnails/37.jpg)
GATU will support your agency
implementation efforts
Utilize the Agency Advisory Workgroup!
QUESTIONS?
37
Carol Kraus
(217) 782-6464
Jennifer Butler
(217) 785-5516