What prompts a new system? The current system may no longer be suitable for its purpose...
-
Upload
basil-henry -
Category
Documents
-
view
212 -
download
0
Transcript of What prompts a new system? The current system may no longer be suitable for its purpose...
![Page 1: What prompts a new system? The current system may no longer be suitable for its purpose Technological developments may have made the current system redundant.](https://reader036.fdocuments.us/reader036/viewer/2022083010/5697bfbc1a28abf838ca1705/html5/thumbnails/1.jpg)
What prompts a new system? The current system may no longer be suitable for its
purpose Technological developments may have made the
current system redundant or outdated The current system may be too inflexible or
expensive to maintain
![Page 2: What prompts a new system? The current system may no longer be suitable for its purpose Technological developments may have made the current system redundant.](https://reader036.fdocuments.us/reader036/viewer/2022083010/5697bfbc1a28abf838ca1705/html5/thumbnails/2.jpg)
Feasibility study (TELOS)
Technical feasibility does the technology exist to implement the proposed
system, or is it a practical proposition? Economic feasibility
is proposed system cost-effective – if benefits do not outweigh costs, it’s not worth going ahead.
Legal feasibility Is there any conflict between the proposed system and
legal requirements – e.g. the Data Protection Act?
![Page 3: What prompts a new system? The current system may no longer be suitable for its purpose Technological developments may have made the current system redundant.](https://reader036.fdocuments.us/reader036/viewer/2022083010/5697bfbc1a28abf838ca1705/html5/thumbnails/3.jpg)
Feasibility study (TELOS) - cont
Operational feasibility are the current work practices and procedures adequate
to support the new system? Schedule feasibility
how long will the system take to develop, or can it be done in a desired time-frame?