The TermsThe Terms
Scientific Review Committee (SRC) – Approves projects dealing with human subjects,
vertebrate animals, pathogenic agents, controlled substances or recombinant DNA
Institutional Review Board (IRB) – a committee that, according to federal regulations
(45-CFR-46), must evaluate the potential physical and/or psychological risk of research involving human subjects.
![Page 3: What is an SRC/IRB](https://reader036.fdocuments.us/reader036/viewer/2022082819/56813b36550346895da4071e/html5/thumbnails/3.jpg)
www.mercersec.org
OverviewOverviewWhy do we need SRC/IRBsIs an SRC/IRB required for all projectsWhat is the sequence of affairsHow do I know what is requiredWhat forms are involvedWho has the final say
![Page 4: What is an SRC/IRB](https://reader036.fdocuments.us/reader036/viewer/2022082819/56813b36550346895da4071e/html5/thumbnails/4.jpg)
www.mercersec.org
Why do we need SRC/IRBsWhy do we need SRC/IRBs Rules – all participants must follow the rules
or their project will be rejected Supervision – to make sure researchers are
supervised by trained personel Safety – to make sure researchers are
performing experiments properly. Subjects must be treated properly and substances must be handled in a safe fashion
Informed Consent – required if human subjects are part of an experiment
Restricted Experiments – its in the rules. Not all experiments will be permitted
![Page 5: What is an SRC/IRB](https://reader036.fdocuments.us/reader036/viewer/2022082819/56813b36550346895da4071e/html5/thumbnails/5.jpg)
www.mercersec.org
Is an SRC/IRB required for Is an SRC/IRB required for all projectsall projects
Yes, SRC reviews are done for all project submissions to the fair
And no, SRC and/or IRB reviews are required only for projects that perform research on restricted areas (discussed later). These reviews MUST occur BEFORE experimentation is started
![Page 6: What is an SRC/IRB](https://reader036.fdocuments.us/reader036/viewer/2022082819/56813b36550346895da4071e/html5/thumbnails/6.jpg)
www.mercersec.org
What is the sequence of affairsWhat is the sequence of affairs
1. Choose a project topic
2. Determine what forms are needed
3. Fill out forms and submit for SRC/IRB approval (depends on form)
4. Begin experimentation
5. Complete project
6. Submit forms when entering the fair
![Page 7: What is an SRC/IRB](https://reader036.fdocuments.us/reader036/viewer/2022082819/56813b36550346895da4071e/html5/thumbnails/7.jpg)
www.mercersec.org
How do I know what is requiredHow do I know what is required
1. Check out the rules and forms
2. Submit an SRC/IRB precheck email from the club’s website
3. Use the ISEF Rules Wizard on the Science Service website
4. Contact the Mercer Science and Engineering Club
![Page 8: What is an SRC/IRB](https://reader036.fdocuments.us/reader036/viewer/2022082819/56813b36550346895da4071e/html5/thumbnails/8.jpg)
www.mercersec.org
What forms are involvedWhat forms are involved
Form 1C: Regulated Research Institutional/Industrial Setting
Form 2: Qualified ScientistForm 3: Designated Supervisor Form 4: Human SubjectsForms 5A, 5B: Vertebrate AnimalForm 6: Human and Vertebrate
Animal Tissue
![Page 9: What is an SRC/IRB](https://reader036.fdocuments.us/reader036/viewer/2022082819/56813b36550346895da4071e/html5/thumbnails/9.jpg)
www.mercersec.org
Forms 1C and 2Forms 1C and 2 Form 1C: Regulated Research
Institutional/Industrial Setting– Must be completed by the scientist supervising the
student research conducted in a regulated research institution (e.g., universities, medical centers, NIH, etc.) or industrial setting.
Form 2: Qualified Scientist– Required for research involving pathogens; may
be required for research involving rDNA, vertebrate animals, controlled substances and humans.
![Page 10: What is an SRC/IRB](https://reader036.fdocuments.us/reader036/viewer/2022082819/56813b36550346895da4071e/html5/thumbnails/10.jpg)
www.mercersec.org
Forms 3 and 4Forms 3 and 4
Form 3: Designated Supervisor– Required for projects using hazardous materials or
devices, tissue studies or if a required Qualified Scientist is unable to supervise the experimentation.
Form 4: Human Subjects– Required for all research involving humans. IRB
approval required before experimentation.
![Page 11: What is an SRC/IRB](https://reader036.fdocuments.us/reader036/viewer/2022082819/56813b36550346895da4071e/html5/thumbnails/11.jpg)
www.mercersec.org
Forms 5A, 5B and 6Forms 5A, 5B and 6
Form 5A, 5B: Designated Supervisor– All research involving vertebrate animals that is
conducted in a Non-Regulated (A) or Regulated (B) Research Site.
Form 6: Human Subjects– Required for all projects using fresh tissue, organs,
primary cell cultures, established cell and tissue cultures, meat or meat by-products, human or animal parts, including blood, blood products, teeth and body fluids.
![Page 12: What is an SRC/IRB](https://reader036.fdocuments.us/reader036/viewer/2022082819/56813b36550346895da4071e/html5/thumbnails/12.jpg)
www.mercersec.org
Who has the final sayWho has the final say
For the Mercer Science and Engineering Fair the final review is done by the Mercer Science and Engineering Fair’s SRC
For the Intel International Science and Engineering Fair the final review is done by the Intel International Science and Engineering Fair’s SRC
![Page 13: What is an SRC/IRB](https://reader036.fdocuments.us/reader036/viewer/2022082819/56813b36550346895da4071e/html5/thumbnails/13.jpg)
www.mercersec.org
SummarySummaryMSEC’s SRC checks all entriesProjects that require IRB/SRC
approval must have the appropriateforms before starting experiments
The grand prize winner’s entry will be check by ISEF’s IRB/SRC
Projects that require and do not have proper approval will be rejected