Westinghouse/Southern/SCANA - Transition from Construction to Operation CM
-
Upload
august-lester -
Category
Documents
-
view
25 -
download
0
description
Transcript of Westinghouse/Southern/SCANA - Transition from Construction to Operation CM
![Page 1: Westinghouse/Southern/SCANA - Transition from Construction to Operation CM](https://reader030.fdocuments.us/reader030/viewer/2022032708/56812e07550346895d937025/html5/thumbnails/1.jpg)
1
Westinghouse/Southern/SCANA - Transition from
Construction to Operation CM
Josh OlsonSouthern Nuclear - Vogtle 3&4
Configuration Management Supervisor
![Page 2: Westinghouse/Southern/SCANA - Transition from Construction to Operation CM](https://reader030.fdocuments.us/reader030/viewer/2022032708/56812e07550346895d937025/html5/thumbnails/2.jpg)
2
Objectives
• Provide an update on construction progress for Vogtle 3&4 and Summer 2&3.
• Provide an overview of the collaborative effort that is currently underway between Southern Nuclear Company (SNC), South Carolina Electric and Gas (SCE&G) and Westinghouse Electric Company to establish and implement the turnover process Vogtle 3&4 and Summer 2&3.
![Page 3: Westinghouse/Southern/SCANA - Transition from Construction to Operation CM](https://reader030.fdocuments.us/reader030/viewer/2022032708/56812e07550346895d937025/html5/thumbnails/3.jpg)
3
![Page 4: Westinghouse/Southern/SCANA - Transition from Construction to Operation CM](https://reader030.fdocuments.us/reader030/viewer/2022032708/56812e07550346895d937025/html5/thumbnails/4.jpg)
4
![Page 5: Westinghouse/Southern/SCANA - Transition from Construction to Operation CM](https://reader030.fdocuments.us/reader030/viewer/2022032708/56812e07550346895d937025/html5/thumbnails/5.jpg)
5Summer 2&3 Construction Update
![Page 6: Westinghouse/Southern/SCANA - Transition from Construction to Operation CM](https://reader030.fdocuments.us/reader030/viewer/2022032708/56812e07550346895d937025/html5/thumbnails/6.jpg)
6
Background
• Scope of Turnover information• Development of Turnover Infrastructure• Joint Information Turnover Meetings• Pilot Project
– Objectives– Participants– Scope– Deliverables
![Page 7: Westinghouse/Southern/SCANA - Transition from Construction to Operation CM](https://reader030.fdocuments.us/reader030/viewer/2022032708/56812e07550346895d937025/html5/thumbnails/7.jpg)
7
Turnover Pilot Objectives
• Perform an inventory of available consortium information
• Identify the required utility program information• Determine the transfer processes required for
turnover of the information from the consortium to the customerEffective, efficient turnover and transfer of
design and jurisdictional authority
![Page 8: Westinghouse/Southern/SCANA - Transition from Construction to Operation CM](https://reader030.fdocuments.us/reader030/viewer/2022032708/56812e07550346895d937025/html5/thumbnails/8.jpg)
8
Turnover Pilot Participants
• Core Team– Configuration Management– Engineering – Information Technology– Initial Testing Program– Document Control
• Steering Committee
![Page 9: Westinghouse/Southern/SCANA - Transition from Construction to Operation CM](https://reader030.fdocuments.us/reader030/viewer/2022032708/56812e07550346895d937025/html5/thumbnails/9.jpg)
9
Turnover Pilot Scope• Standard Plant System (WEC Design)
– SFS – Spent Fuel Pool Cooling System • Standard Plan System (CB&I Design)
– EDS – Non Class 1E DC and UPS System • Site Specific System (CB&I Design)
– YFS – Yard Fire Water System • Area – Main Control Room• Program – MOV Program
![Page 10: Westinghouse/Southern/SCANA - Transition from Construction to Operation CM](https://reader030.fdocuments.us/reader030/viewer/2022032708/56812e07550346895d937025/html5/thumbnails/10.jpg)
10
Turnover Pilot Deliverables
• Scope of Turnover Information• Document / Data Delivery Process• Acceptance Process• Repeatable process applicable to other systems,
areas and programs
![Page 11: Westinghouse/Southern/SCANA - Transition from Construction to Operation CM](https://reader030.fdocuments.us/reader030/viewer/2022032708/56812e07550346895d937025/html5/thumbnails/11.jpg)
11
Lessons Learned
• Dedication of resources• Start Early• Project Manager Needed• Teamwork is key• Design Authority Transfer• Contract Detail
![Page 12: Westinghouse/Southern/SCANA - Transition from Construction to Operation CM](https://reader030.fdocuments.us/reader030/viewer/2022032708/56812e07550346895d937025/html5/thumbnails/12.jpg)
12
Questions?