Westchester RiverWalk

17
5/20/2018 WestchesterRiverWalk-slidepdf.com http://slidepdf.com/reader/full/westchester-riverwalk 1/17 Westchester RiverWalk Transforming the Hudson River Shoreline November 15 , 2012 Paul Gisondo Westchester County Department of Planning Westchester RiverWalk Comes of Age in an Era of Global Climate Change and Sea Rise Irvington November 15 , 2012 Paul Gisondo Westchester County Department of Planning Ossining Hastings-on-Hudson

description

Transforming the Hudson River Shoreline

Transcript of Westchester RiverWalk

  • 1Westchester RiverWalkTransforming the Hudson River Shoreline

    November 15 , 2012

    Paul GisondoWestchester County Department of Planning

    Westchester RiverWalkComes of Age in an

    Era of Global Climate Change and Sea Rise

    Irvington

    November 15 , 2012

    Paul GisondoWestchester County Department of Planning

    Ossining Hastings-on-Hudson

  • 2Roughed up by Sandy

    Croton-on-Hudson

    Westchester RiverWalk WCDP 2012

    Roughed up by Sandy

    Croton-on-Hudson

    Westchester RiverWalk WCDP 2012

  • 3Roughed up by Sandy

    Westchester RiverWalk WCDP 2012

    Storm Surge Zones

    Westchester RiverWalk WCDP 2012

  • 4Its all about Rebirth

    Westchester RiverWalk WCDP 2012

    Tarrytown RiverWalk

    A Waterfront in TransitionHastings-on-Hudson

    Westchester RiverWalk WCDP 2012

    Tarrytown - Sleepy Hollow

  • 5A Transitioned Waterfront

    Irvington Waterfront

    Scenic Hudson Park

    Westchester RiverWalk WCDP 2012

    Westchester RiverWalkThe Vision

    A 51.5-mile Greenway Trail along the Hudson River fromHudson River from Peekskill to Yonkers

  • 6By the Numbers

    51.5 miles long14 municipalities33 miles (64%) in place as paved and unpaved paths, promenades and sidewalks2.7 miles in design or planning stagesConnects directly with13 of 14 Metro-North Hudson Line Stations and 27 Bee-Line Bus Routes75% of route on publicly accessible lands including parks, road rights-of-way, and p , g y,public institutions.25% of route on restricted lands including Metro North ROW, industrial areas and private sites.

    Westchester RiverWalk WCDP 2012

    A Multifaceted Trail

    Esplanades

    Paved Path

    Westchester RiverWalk WCDP 2012

  • 7A Multifaceted Trail

    Unpaved PathSections

    SidewalkSections

    Old Croton Aqueduct Trail

    Rockwood Hall State Park

    Sections

    Westchester RiverWalk WCDP 2012

    Mapping the Route2003

    Westchester RiverWalk WCDP 2012

  • 8Mapping the Route 2003

    This report presented the initial routing of gRiverWalk, providing a detailed outline of the proposed route, divided into 29 segments, and documented existing conditions.

    Westchester RiverWalk WCDP 2012

    Setting the Design Standards2005

    Westchester RiverWalk WCDP 2012

  • 9Setting the Design Standards2005

    Establishes a design vocabularydesign vocabulary for logos, signage furniture, trail materials and landscape design treatments.

    Westchester RiverWalk WCDP 2012

    New Sections andin the Works Projects

    Croton Landing Park

    Scenic Hudson PeekskillLanding Park

    By Peekskill and Scenic Hudson

    Sleepy Hollow & Tarrytown

    Ichabods Landing Scenic Hudson RiverWalk Park Kraft - Lyndhurst

    Mariandale Crawbuckie

    New Sections

    In Design/Planning

    Dobbs FerryWaterfront

    JFK MarinaYonkers

  • 10

    New SectionsTarrytown North at Pierson & Scenic Hudson Parks

    Westchester RiverWalk WCDP 2012

    New SectionsTarrytown North at Scenic Hudson Waterfront Park

    Westchester RiverWalk WCDP 2012

  • 11

    New SectionsTarrytown South at Lyndhurst, Kraft & Metro-North

    Westchester RiverWalk WCDP 2012

    New SectionsCroton Landing Park

    Westchester RiverWalk WCDP 2012

  • 12

    New SectionsCroton Landing Park

    Westchester RiverWalk WCDP 2012

    New SectionsIchabods Landing, Sleepy Hollow

    Westchester RiverWalk WCDP 2012

  • 13

    Sections In DesignMariandale-Crawbuckie, Ossining

    Westchester RiverWalk WCDP 2012

    Sections In DesignMariandale-Crawbuckie, Ossining

    Westchester RiverWalk WCDP 2012

  • 14

    Sections In DesignDobbs Ferry Waterfront Park

    Westchester RiverWalk WCDP 2012

    Sections In DesignJFK Marina Yonkers

    Westchester RiverWalk WCDP 2012

  • 15

    ChallengesArdsley-on-Hudson Station to Scenic Hudson Park, Irvington

    Croton-Oscawana , Croton

    Westchester RiverWalk WCDP 2012

    Westchester RiverWalk

    t h t / i lkwww.westchestergov.com/riverwalk

  • 16

    Part of the Bigger Picture

    Westchester RiverWalk WCDP 2012

    By the Numbers

    Type/Status MileageExistingPath(Paved) 7.4

    ExistingPath(Unpaved) 15.8*ExistingPromenade 1.1ExistingSidewalk 8.6

    EXISTING SUBTOTAL 32 9EXISTINGSUB TOTAL 32.9UnderConstruction 0.0InDesign&Planning 2.7

    RemainingProposedRoute 15.9SUBTOTAL 18.6TOTAL 51.5

    Westchester RiverWalk WCDP 2012

  • 17

    Revitalizing Hudson Riverfronts in an Era of Global Climate Change and Sea Rise, a day-long conference exploring how re-development of waterfronts along the Hudson River can:

    prepare for rising sea levels along the Hudson;

    connect people to the river;

    protect the environment; andprotect the environment; and

    stimulate the economy and create jobs.