West Wall Compressor Requirements
West Wall Mezzanine•Move compressors to the West Wall to distance from magnetic field•Find compressor position on West Wall to meet <= 30m hose lengths•Build necessary structure to support compressors & services•Additional requirements
• Personnel access• Compressor access (for installation & swap)• Equipment delivery & assembly space (esp MICE Devices)
Compressor Line Routing
Different Routing Layouts Many routes tried
Compressor Locations (based on hose routing)
15 xCryomech Compressors
4 xSumitomo Compressors Step V
& VI racks
Step IV racks
Other Features
Ramp to north mezzanine
Walkway over hose & cables
Stairs access to south
mezzanine
Compressor on a scissor
jack trolley
Equipment Delivery & Assembly Area
SS in lifting position with tandem lifting frame
RFCCas delivered
(laid down & no RF couplings)
MLCR & Rack Room #2
Extended MLCR
Existing locker room
= Rack Room #2
2D Layout from John Webb
ISIS Plant room door move (position TBD)
Toilets will be removed for new ISIS
switchgear (2014)New access doors
Cables routed under stairs
with access via Rack Room #2 (volume to be
fireproofed)Existing rack room = Rack Room #1
Cables routed under false floor
then into Hall (not an insignificant
task!)
ISIS switchgear