Station ProposalStation ProposalStation ProposalStation Proposal
Community Forum #4Community Forum #4Community Forum #4Community Forum #4
Division of Fire Protection Services
Mission StatementThe West Sand Lake Fire District #1 Board of Commissioners, in partnership with the Fire Department’s volunteers, recognizes the need to undertake a comprehensive study of its existing facilities and analyze how they are currently meeting the needs of both the District and the community.st ct a d t e co u tyThe Committee, approved by the WSL Board of Fire Commissioners, is chaired by Mr. Dan Hartstein. The task of the Committee, at the directive of the Board, is to develop a “cost effective way to meet existing facility needs currently not met, and to prepare th Di t i t’ f iliti f i d f t d ”the District’s facilities for perceived future needs”.The consideration the Committee must incorporate into its analysis is the District’s demand that any new construction be carefully designed so as not to have a negative impact on the existing neighbors and / or community streetscape.impact on the existing neighbors and / or community streetscape.The goal of the Feasibility Study is to accurately and without bias, document the existing building conditions and evaluate, based on National standards, how those existing conditions contribute to the level of service being provided by the WSLFD.The culmination of this 4 month study will be a detailed final report that will document the Committee’s findings and propose an “action plan” outlining the District’s proposed next steps.We believe it is this pro active thorough approach that will allow The West Sand LakeWe believe it is this pro-active, thorough approach that will allow The West Sand Lake Fire District to continue to provide the highest level of emergency services they have since 1872.
Facility Assessment ProcessAnalyze the Existing Facilities and Program.Compare Existing Program as it Relates to C it R i t d R d S f tCommunity Requirements and Responder Safety.Identify the Need.Id tif th O ti d A i t d M it d fIdentify the Options and Associated Magnitudes of Cost.
Present the most Cost EffectivePresent the most Cost Effective, Beneficial Option to the West Sand Lake Community.
TONIGHT
Division of Fire Protection Services
Let’s Review the OptionsLet s Review the Options
Prior to identifying any one plan of action, thePrior to identifying any one plan of action, the Facility Assessment Committee thoroughly analyzed ALL possible Options for the West Sand Lake Fire District. Following is a brief review of the Options.
Division of Fire Protection Services
Option 1A: New Construction on Existing Site
Square Footage: 17,600
Budget: $ 4,975,000
Square Footage: 17,600
Budget: $ 4,975,000
Division of Fire Protection Services
Option 1B: New Construction on New Site
Square Footage: 17,600
Budget: $ 5,380,000
Square Footage: 17,600
Budget: $ 5,380,000
Division of Fire Protection Services
Option 2A: Demo Station only –Build New
Square Footage: 12,000
Budget: $ 3,675,000
Square Footage: 12,000
Budget: $ 3,675,000
Division of Fire Protection Services
Option 2B: Demo Station only –Build New Station /
Renovate Recreation BuildingRenovate Recreation Building Square Footage 10,500 New plus Renovation Square Footage 10,500 New plus Renovation p
Budget: $ 3,520,000
p
Budget: $ 3,520,000
Division of Fire Protection Services
Option 3: Demolish Rec Building. R t E i ti St tiRenovate Existing Station.
Build an Addition.Construction to be completed in Phases:
Phase 1:
Construction to be completed in Phases:
Phase 1:• Demolish Rec Bldg• Renovate Existing Station• Construct New Admin and 2-Bay
Drive-thru
• Demolish Rec Bldg• Renovate Existing Station• Construct New Admin and 2-Bay
Drive-thruDrive-thru
Phase 2:• Demolish Old Station
Drive-thru
Phase 2:• Demolish Old Station• Construct 4,700 SF Fire Bay• Construct 4,700 SF Fire Bay
Division of Fire Protection Services
Option 4: New Station with 4 BaysOption 4: New Station with 4 Bays(2 vs. 4 Bay Drive Thru Analysis)
Square Footage: 17,600Square Footage: 17,600
2 of 4 Baysto be Drive-thru $ 4,975,0004 of 4 Bays
2 of 4 Baysto be Drive-thru $ 4,975,0004 of 4 Baysto be Drive-thru $ 5,215,000to be Drive-thru $ 5,215,000
Division of Fire Protection Services
Community Forum #3Post-Meeting Survey
1A 1B 2A 2B 3 4 noneWhich Option are you in favor of? 14 5 1Does the current Station Location best YES 16 votesserve the Community? YES – 16 votes
Division of Fire Protection Services
Community Forum #3Post-Meeting Survey Comments
Breigle Lane house acquisitionBreigle Lane house acquisitionBreigle Lane and Firehouse Lane drivewaysLandscapingLandscapingCommunity Room needs to be same size or largerBunk-inBunk inTemporary relocationSiren
Division of Fire Protection Services
Committee Process for the S l t d O tiSelected Option
Reviewed percent of needs met for each OptionConsidered allowable Bond Rate for each OptionAnalyzed construction cost escalationsC id d fi l ibilit f i ti i i tiConsidered fiscal responsibility of investing in existing Recreation BuildingAnalyzed long term street scape impactAnalyzed long term street-scape impactOverall tax implications to residentsCommunity Forum Post Meeting Surveys – thank you !Community Forum Post Meeting Surveys – thank you !
Division of Fire Protection Services
ProposedProposed Project
C t lConceptual Floor Plan
Division of Fire Protection Services
AerialView of
ProposedProposed Project
Division of Fire Protection Services
Annual Tax ImplicationsBOND COST TERM TAX
IMPLICATIONS *
$ 4.5 million 30 year 90
$ 5.0 million 30 year 101
* Note that these are estimates only based on a $100,000 assessed value home. Final tax implications are to be confirmed by fiscal advisors.
Division of Fire Protection Services
What’s Next ?Thursday, July 21, 7:00 pm – Community Forum #5
Thursday, Aug. 11, 7:00 pm – Community Forum #6
Tuesday, Aug. 16, 9:00 am to 9:00 pm –
R f d V tR f d V tReferendum VoteReferendum Vote