West Lake Update March 24, 2016 EPA Releases First Round of Comprehensive Phase 1 Investigation Information EPA is releasing selected data, tables, and figures collected during the Phase 1 site investiga- tion to determine the extent of RIM in Operable Unit 1, Area 1, of the West Lake Landfill. e data, tables, and figures depict the locations of soil borings, sampling locations, and gamma scans that were used to determine the extent of RIM in the landfill. EPA is conducting a thorough Quality Control/Quality Assurance review of the Compre- hensive Phase 1 report and will release it once it’s finalized. EPA Region 7 has conducted a quality control review of the Comprehensive Phase I investigation data and information provided by the Potentially Responsible Parties (PRPs). e information and data, including a map depicting the revised ex- tent of radiologically-impacted material (RIM) is now available on the agency’s West Lake Landfill website. e information and map released today pro- vide data from the field work including the Gam- ma Cone Penetrometer Testing. EPA is releasing the information consistent with its past practices of releasing final information aſter completion of an extensive review and qual- ity control process. EPA’s review process that is still underway for the final report is a robust effort designed to ensure that the PRPs’ work, and analy- ses meet the agency’s strict scientific standards and the goals of the investigation. As soon as the final report is complete and approved, EPA will post that document to the website. e data and map released help answer the follow- ing three questions: 1.Where is the radiologically-impacted mate- rial (RIM)? e Extent of RIM map depicts areas of RIM based on sampling points included in the Phase 1 Investigation and from historical site investiga- tions. e Phase 1 investigation was conducted to determine the extent of RIM in Operable Unit 1 (OU-1), Area 1 of the West Lake Landfill. To accom- plish the Phase 1 objective, contractors for the responsible parties under EPA oversight collected more than 120 soil samples from 110 borings and conducted gamma scans from across Area 1, to determine areas with RIM present. e soil samples were then analyzed in a certified labora- tory to ensure the scientific accuracy and integrity of the data. e Phase 1 investigation identified RIM in areas of the landfill not identified during previous site investiga- tions as shown on the Extent of RIM map. e Phase 1 investigation also determined that RIM was not present in certain areas previously presumed to contain RIM. 2. Is there any change to health risks associated with the site as a result of the new data? While the footprint of RIM within the West Lake Landfill has been revised, the health risks associated with the site remain consistent with previous studies. For the community surrounding the site, there are no significant health risks posed by the radiological wastes contained at the West Lake Landfill. Health risks for on-site work- ers also remain consistent with previous studies. On-site workers that conduct activities on Area 1 and Area 2 are subject to strict health and safety protocols while on-site, including scanning for radiological contamination before exiting the controlled exclusion zones. Additionally, risks associated with the potential for surface fires occurring in areas where RIM is near the surface are being mitigated by the current Removal Action to install the non-combus- tible cover in portions of Areas 1 and 2 of OU-1. 3. How does this new data relate to the subsurface smoldering event (SSE) in the Bridgeton Landfill? e Phase 1 data indicate that RIM has been identi- fied further south and beneath a portion of the Bridgeton landfill known as the “Muffin Top”. However, on-site monitoring from temperature monitoring probes, gas extraction wells, and landfill subsidence, indicate that the SSE remains in the South Quarry, hundreds of feet from the RIM and that there is no rapid movement of the SSE towards the North Quarry or the RIM in OU-1. e SSE is monitored and managed under the regulatory author- ity of the Missouri Department of Natural Resources. All information related to oversight and monitoring of the Bridgeton Landfill is posted on their website (http:// dnr.mo.gov/bridgeton/). In December, EPA announced

Transcript of West Lake Update - Public Interactivemediad.publicbroadcasting.net/p/kwmu/files/201603/0324...West...

  • West Lake UpdateMarch 24, 2016

    EPA Releases First Round of Comprehensive Phase 1 Investigation Information

    EPA is releasing selected data, tables, and figures collected during the Phase 1 site investiga-tion to determine the extent of RIM in Operable Unit 1, Area 1, of the West Lake Landfill. The data, tables, and figures depict the locations of soil borings, sampling locations, and gamma scans that were used to determine the extent of RIM in the landfill. EPA is conducting a thorough Quality Control/Quality Assurance review of the Compre-hensive Phase 1 report and will release it once it’s finalized.

    EPA Region 7 has conducted a quality control review of the Comprehensive Phase I investigation data and information provided by the Potentially Responsible Parties (PRPs). The information and data, including a map depicting the revised ex-tent of radiologically-impacted material (RIM) is now available on the agency’s West Lake Landfill website.

    The information and map released today pro-vide data from the field work including the Gam-ma Cone Penetrometer Testing. EPA is releasing the information consistent with its past practices of releasing final information after completion of an extensive review and qual-ity control process. EPA’s review process that is still underway for the final report is a robust effort designed to ensure that the PRPs’ work, and analy-ses meet the agency’s strict scientific standards and the goals of the investigation. As soon as the final report is complete and approved, EPA will post that document to the website. The data and map released help answer the follow-ing three questions:

    1.Where is the radiologically-impacted mate-rial (RIM)?

    The Extent of RIM map depicts areas of RIM based on sampling points included in the Phase 1 Investigation and from historical site investiga-tions. The Phase 1 investigation was conducted to determine the extent of RIM in Operable Unit

    1 (OU-1), Area 1 of the West Lake Landfill. To accom-plish the Phase 1 objective, contractors for the responsible parties under EPA oversight collected more than 120 soil samples from 110 borings and conducted gamma scans from across Area 1, to determine areas with RIM present. The soil samples were then analyzed in a certified labora-tory to ensure the scientific accuracy and integrity of the data. The Phase 1 investigation identified RIM in areas of the landfill not identified during previous site investiga-tions as shown on the Extent of RIM map. The Phase 1 investigation also determined that RIM was not present in certain areas previously presumed to contain RIM.

    2. Is there any change to health risks associated with the site as a result of the new data?

    While the footprint of RIM within the West Lake Landfill has been revised, the health risks associated with the site remain consistent with previous studies. For the community surrounding the site, there are no significant health risks posed by the radiological wastes contained at the West Lake Landfill. Health risks for on-site work-ers also remain consistent with previous studies. On-site workers that conduct activities on Area 1 and Area 2 are subject to strict health and safety protocols while on-site, including scanning for radiological contamination before exiting the controlled exclusion zones. Additionally, risks associated with the potential for surface fires occurring in areas where RIM is near the surface are being mitigated by the current Removal Action to install the non-combus-tible cover in portions of Areas 1 and 2 of OU-1.

    3. How does this new data relate to the subsurface smoldering event (SSE) in the Bridgeton Landfill?

    The Phase 1 data indicate that RIM has been identi-fied further south and beneath a portion of the Bridgeton landfill known as the “Muffin Top”. However, on-site monitoring from temperature monitoring probes, gas extraction wells, and landfill subsidence, indicate that the SSE remains in the South Quarry, hundreds of feet from the RIM and that there is no rapid movement of the SSE towards the North Quarry or the RIM in OU-1. The SSE is monitored and managed under the regulatory author-ity of the Missouri Department of Natural Resources. All information related to oversight and monitoring of the Bridgeton Landfill is posted on their website (http://dnr.mo.gov/bridgeton/). In December, EPA announced

    http://dnr.mo.gov/bridgeton/http://dnr.mo.gov/bridgeton/

  • Find Us Onwww.facebook.com/WestLakeLandfillSuperfundSite

    www.twitter.com/WestLakeSitewww.scribd.com/eparegion7

    www3.epa.gov/region07/cleanup/west_lake_landfill

    Community InquiriesBen Washburn913-551-7364

    [email protected]

    its decision to require the Potentially Respon-sible Parties at the site to construct a physical isolation barrier, as well as install additional engineering controls, to prevent the SSE from contacting or impacting the RIM in OU-1. EPA will release additional information regarding the isolation barrier when the technical and legal details of this work are complete.

    Progress on Surface Fire Mitigation Field Work

    In December 2015, EPA Region 7 issued a unilateral order to the parties at the site to prepare and implement surface fire mitigation measures in Operable Unit 1, Areas 1 and 2, of the West Lake Landfill where radiologically impacted material (RIM) may be at or near the surface. The work includes cutting and laying in place brush, covering the brush with a per-meable geotextile cover, and then placing eight inches of crushed rock on top of the geotextile cover. This layered cover is collectively known as the non-combustible cover. This work will alleviate concerns with potential surface fires in areas where RIM is at or near the surface and reduces the risk of off-site migration of con-taminants that could result from removing the

    vegetation. In addition to reducing the risk of surface fires, the non-combustible cover also reduces the health risks for on-site workers who enter OU-1 by providing additional shielding between the RIM and the workers.Work crews under EPA oversight began installing the non-combustible cover in February 2016, and the work is progressing at a steady pace. Construction of the non-combustible cover in Operable Unit 1, Area 1, is complete. Final confirmation from soil sampling will ensure that all areas with RIM known to be at or near the surface are cleared of vegetation and covered. Re-sults from recently collected soil samples are being ana-lyzed for confirmation that identified areas of surface RIM have been covered. In Area 1, about two acres have been covered with the non-combustible cover, while in Area 2, more than eight acres have been covered so far, totaling 21,000 tons of crushed rock for both areas. Crews working for the PRPs under EPA oversight are continuing to work on placing the non-combustible cover in Area 2.

    EPA expects the surface fire mitigation field work to be completed later this spring. EPA is providing regu-lar updates, including progress photographs of the site work, to its Facebook and Twitter pages. Links to those pages are included in the West Lake Update.

    http://www.facebook.com/WestLakeLandfillSuperfundSitehttp://www.twitter.com/WestLakeSitehttps://www.scribd.com/user/193013012/EPA-Region-7-Midwesthttp://www3.epa.gov/region07/cleanup/west_lake_landfill

  • GC

    PT

    1-1A

    GC

    PT

    1-1

    GC

    PT

    1-2

    GC

    PT

    2-1

    GC

    PT

    2-2

    GC

    PT

    2-2A

    GC

    PT

    2-2B

    GC

    PT

    2-3

    GC

    PT

    3-1

    GC

    PT

    3-1A

    GC

    PT

    3-2

    GC

    PT

    4-1

    GC

    PT

    4-2

    GC

    PT

    5-1

    GC

    PT

    5-2 G

    CP

    T 5-

    3

    GC

    PT

    5-4A

    GC

    PT

    5-4

    GC

    PT

    6-2

    GC

    PT

    6-3

    GC

    PT

    6-4

    GC

    PT

    6-5

    GC

    PT

    7-1

    GC

    PT

    7-2

    GC

    PT

    7-3

    GC

    PT

    8-1

    GC

    PT

    9-1 G

    CP

    T 9-

    2

    GC

    PT

    9-3A

    GC

    PT

    9-3

    GC

    PT

    10-1

    GC

    PT

    10-2

    GC

    PT

    10-3

    AG

    CP

    T 10

    -3G

    CP

    T 10

    -4A

    GC

    PT

    10-4

    GC

    PT

    11-1

    GC

    PT

    11-2

    GC

    PT

    11-3 GC

    PT

    11-4

    GC

    PT

    12-1

    GC

    PT

    12-2

    GC

    PT

    12-3

    GC

    PT

    12-4

    GC

    PT

    12-5

    GC

    PT

    12-6G

    CP

    T 13

    -1

    GC

    PT

    13-2

    AG

    CP

    T 13

    -2

    GC

    PT

    13-3

    GC

    PT

    13-4

    GC

    PT

    13-5

    GC

    PT

    13-6

    GC

    PT

    13-7

    GC

    PT

    14-1

    GC

    PT

    14-2

    GC

    PT

    14-3

    GC

    PT

    14-4 G

    CP

    T 14

    -5

    GC

    PT

    14-6

    GC

    PT

    14-7

    GC

    PT

    15-1

    GC

    PT

    15-2

    GC

    PT

    15-3

    GC

    PT

    15-4

    GC

    PT

    15-5

    GC

    PT

    15-6

    GC

    PT

    15-7

    GC

    PT

    15-8

    GC

    PT

    16-1

    GC

    PT

    16-2

    GC

    PT

    16-4

    GC

    PT

    16-5

    GC

    PT

    16-6

    GC

    PT

    16-7

    GC

    PT

    16-8

    GC

    PT-

    108

    GC

    PT-

    111A

    GC

    PT-

    28A

    GC

    PT-

    25

    GC

    PT-

    36

    GC

    PT

    2-4

    GC

    TP 9

    -4

    GC

    PT

    1C-1

    AG

    CP

    T 1C

    -1 GC

    PT

    1C-2

    GC

    PT

    1C-3

    GC

    PT

    1C-4

    GC

    PT

    1C-5

    GC

    PT

    1C-5

    A

    GC

    PT

    1C-7

    GC

    PT

    1C-8

    GC

    PT

    1C-9

    GC

    PT

    1C-1

    0

    GC

    PT

    1C-1

    1

    GC

    PT

    1C-1

    3

    GC

    PT

    28

    GC

    PT

    111

    GC

    PT

    5-5

    GC

    PT

    5-6 G

    CP

    T 6-

    6

    GC

    PT

    13-4

    S

    GC

    PT

    13-5

    S

    GC

    PT

    13-6

    S GC

    PT

    13-7

    S

    GC

    PT

    14-3

    S

    GC

    PT

    14-5

    S

    GC

    PT

    14-6

    S

    GP

    CT

    1C-4

    R

    GC

    PT

    1C-6

    GC

    PT

    1C-6

    T1

    GC

    PT

    1C-6

    T

    PV

    C-2

    5R

    GP

    1-2

    GP

    1C

    -12

    GP

    1C

    -12B

    GP

    1C

    -12C

    GP

    1C

    -2R

    A

    GP

    1C

    -4R

    B

    GP

    1C

    -6T1

    GP

    2-2

    GP

    2-3

    GP

    8-1

    GP

    8-1

    BG

    P W

    L-11

    9G

    P W

    L-11

    9B

    GP

    WL-

    119C

    S1-

    2

    S2-

    2

    S5-

    3

    S8-

    1

    S12

    -5S13

    -3

    S13

    -6

    S14

    -2

    S14

    -4

    S14

    -5

    S14

    -7

    S15

    -2A

    S15

    -2

    S16

    -6

    S1C

    -6

    SW

    L-11

    9

    1D-1

    1D-2

    1D-3

    1D-4

    1D-5

    1D-6 1D

    -7

    1D-8

    A1D

    -8

    1D-9

    A1D

    -9

    1D-1

    0

    1D-1

    1A

    1D-1

    1

    1D-1

    2

    1D-1

    3B1D

    -13A

    1D-1

    3 1D-1

    3C

    1D-1

    4

    1D-1

    51D

    -16

    1D-1

    6A

    1D-1

    7A1D

    -17

    1D-1

    8

    1D-1

    8A

    1D-1

    S

    1D-2

    S1D

    -3S

    1D-4

    S

    1D-5

    S

    1D-6

    S

    1D-7

    S

    1D-8

    S

    1D-9

    S

    1D-1

    0S

    1D-1

    1S

    1D-1

    2S

    1D-1

    3S

    1D-1

    4S

    1D-1

    5S1D

    -16S

    1D-1

    7S

    1D-1

    8S

    1D-1

    9S

    1D-2

    0S

    PV

    C-2

    4

    PV

    C-2

    6

    PV

    C-2

    7

    PV

    C-2

    8

    PV

    C-2

    9

    PV

    C-3

    6

    PV

    C-3

    7

    PV

    C-3

    8

    PV

    C-4

    1

    WL-

    101

    WL-

    102

    WL-

    103

    WL-

    104

    WL-

    105A

    WL-

    105B

    WL-

    105C

    WL-

    106

    WL-

    106A

    WL-

    107

    WL-

    108

    WL-

    109A

    WL-

    109B

    WL-

    109C

    WL-

    109D

    WL-

    110

    WL-

    111

    WL-

    112

    WL-

    113

    WL-

    114

    WL-

    115

    WL-

    116

    WL-

    117

    WL-

    118

    WL-

    119

    WL-

    120

    WL-

    121

    WL-

    122

    WL-

    123

    WL-

    124

    S16

    -3G

    CP

    T 16

    -3

    GP

    1C

    -4R

    GC

    PT

    1C-1

    2

    GC

    PT-

    119

    S8-

    1A

    GC

    PT

    2-2C

    GC

    PT

    2-3A

    GC

    PT

    1C-2

    R

    PV

    C-2

    5

    Eng

    inee

    ring

    Man

    agem

    ent S

    uppo

    rt, In

    c.EM

    SI

    Wes

    t Lak

    e La

    ndfil

    l Sup

    erfu

    nd S

    ite

    Figu

    re 1

    5

    M:\clients\EMSI\westlake\2015\Comp Report\WL-Fig-15-Extent ofRIM.dwg

    NO

    TES

    :

    AE

    RIA

    L TO

    PO

    GR

    AP

    HY

    PR

    OV

    IDE

    D B

    YC

    OO

    PE

    R A

    ER

    IAL

    SU

    RV

    EY

    S C

    O. A

    ND

    ISD

    ATE

    D F

    EB

    RU

    AR

    Y 1

    0, 2

    015

    A

    LL E

    LEV

    ATI

    ON

    S A

    RE

    AB

    OV

    E M

    EA

    N S

    EA

    LE

    VE

    L (A

    MS

    L)

    EX

    TEN

    T O

    F R

    IM

    OU

    -1 W

    AS

    TE D

    ISP

    OS

    AL

    AR

    EA

    1

    OU

    -1 A

    PP

    RO

    XIM

    ATE

    ED

    GE

    OF

    RE

    FUS

    E

    LEG

    EN

    D

    BO

    RIN

    GS

    WIT

    H E

    LEV

    ATE

    D G

    AM

    MA

    AN

    D/O

    RR

    AD

    IUM

    OR

    TH

    OR

    IUM

    AB

    OV

    E U

    NR

    ES

    TRIC

    TED

    US

    E L

    EV

    ELS

    AP

    PR

    OX

    IMA

    TE E

    DG

    E O

    F R

    EFU

    SE

    ED

    GE

    OF

    QU

    AR

    RY

    HIG

    HW

    ALL

    Ext

    ent o

    f Rad

    iolo

    gica

    lly-Im

    pact

    edM

    ater

    ial i

    n A

    rea

    1