Well Name: Sample 11 - Full Data
Report Print ed: 2009-09-14www.peloton.com
Daily Drilling
AFE Number
9876543 AFE+Supp Amt (Cost)
10,343,000.00Day Total (Cost)
142,830.79Cum To Date (Cost)
684,304.01Mud Field Est (Cost) Cum Mud Field Est (Co…
Start Depth (ftKB)
1,610.9End Depth (ftKB)
2,01Target Formation
Blue Heron ShaleTarget Depth (ftKB)
11,50Last Casing String
Structural Casing, 1,598.8ftKB
Daily ContactsJob Contact Mobile
Tom Black 555-133-9427Jim Green 555-029-9115David BrownRigsNABORS, 432Contractor
NABORSRig Number
432Rig Supervisor
Sam WhitePhone Mobile
555-300-3991, OILWELL, A 1700-PTPump #
1Pwr (hp) Rod Dia (in)
2.24Liner Size (in)
6 1/2Stroke (in)
18.00Vol/Stk OR (
0.P (psi)
1,400.0Slow Spd
NoStrokes (s…
100Eff (%)
2, OILWELL, A 1700-PTPump #
2Pwr (hp) Rod Dia (in)
2.24Liner Size (in)
6 1/2Stroke (in)
18.00Vol/Stk OR (
0.P (psi)
1,400.0Slow Spd
NoStrokes (s…
100Eff (%)
3, OILWELL, A 1700-PTPump #
3Pwr (hp) Rod Dia (in)
2.24Liner Size (in) Stroke (i n) Vol/S tk OR (b…
P (psi) Slow Spd Strokes (s… Eff (%)
Mud Additive Amounts
DesField Est
(Cost/unit)Consu
d
Safety ChecksTime Type Des
02:15 SafetyMeeting
Safety meetinto run 30"casing
WellboresWellbore Name KO MD (ftKB)
Original Hole 1,381
Report #: 2.0, DFS: 2.00
API/UWI
0987656789Surface Legal Location License #
8818838State/Province
TexasSpud Date
2000-02-21 00:00Rig Release Date
2000-03-18 00:00Ground Elevation (ft) KB-Ground Distance (ft)
Weather Temperature (°F) Road Condition Hole Condition
Operations at Report Time
DRILLING SURFACE HOLEOperations Next Report Period
RUN AND CMT CSGOperations Summary
Time LogStartTime End Time Dur (hr)
Cum Dur(hr)
Code1 Code 2 Com
00:00 01:45 1.75 1.75 6 CSG POOH AND RACK BACK 36" BHA01:45 02:15 0.50 2.25 6 CSG PREP TO RUN 30" CASING02:15 02:30 0.25 2.50 6 CSG CONDUCT SAFETY MEETING AND RUN 30" CASING02:30 06:15 3.75 6.25 6 CSG RUN CASING AND MU WELLHEAD06:15 07:00 0.75 7.00 6 CSG RD CSG EQUIP AND RUN CMT STRING07:00 08:45 1.75 8.75 6 CSG FINISH RUNNING CMT STRING AND FILL CSG WITH
SEAWATER08:45 10:30 1.75 10.50 6 CSG LAND CASING10:30 10:45 0.25 10.75 6 CSG RU CEMENTING HOSE10:45 11:15 0.50 11.25 6 CSG CIRCULATE HOLE CLEAN11:15 12:45 1.50 12.75 6 CSG CEMENT 30" CASING.12:45 15:00 2.25 15.00 6 CSG POOH W/ RUNNING TOOLS15:00 15:15 0.25 15.25 6 CSG CLEAR RIG FLOOR15:15 16:15 1.00 16.25 6 CSG LD 36" DRLG ASSY.16:15 18:15 2.00 18.25 6 CSG MU 26" BHA18:15 18:45 0.50 18.75 21 RR ROV TROUBLE18:45 20:45 2.00 20.75 20 DRLCMT RIH TO TOC20:45 22:00 1.25 22.00 20 DRLCMT DRILL CMT AND FLOATS22:00 00:00 2.00 24.00 3 DRLG DRILL SURFACE HOLEMud Checks1,610.9ftKB, 2000-02-22 12:00Type
hi-vis sweepsTime
12:00Depth (ftKB)
1,610.9Density (lb/gal)
8.50Funnel Viscosity (s/qt)
14688PV Overr ide (cp) YP OR ( lbf/100ft² )
Gel 10 sec (lbf/100ft²) Gel 10 min (lbf/100ft²) Filtrate (mL/30min) Filter Cake (1/32") pH Sand (%) Solids (%)
MBT (lb/bbl) Alkalinity (mL/mL) Chlorides (mg/L) Calcium (mg/L) Pf (mL/mL) Pm (mL/mL) Gel 30 min (lbf/100ft²)
W hole Mud Added (bbl) Mud Lost to Hole (bbl) Mud Lost to Surface (bbl)1132.2
Reserve Mud Volume (bbl) Active Mud Volume (bbl)
Drill StringsBHA #2, 26" Drilling AssyBit Run
2Drill Bit
26in, S3SJ, 456789Length (ft)
1.87IADC Bit Dull
1-1-NO-A-2-0-NO-TDTFA (incl Noz) (in²)
2.11BHA ROP …
161.5Nozzles (1/32")
20/20/20String Length (ft)
2,258.87Max Nominal OD (in)
26.000String Components
Security S3SJ, Float Sub, Drill Collar, Intergral Blade Stabilizer, Drill Collar, Cross Over, Non-Mag Drill Collar, DrillCollar, Drilling Jar, Drill Collar, Cross Over, Heavy Weight Drill Pipe, Drill PipeComment
Drilling Parameters
Wellbore Start (ftKB)End Depth
(ftKB)Cum Depth
(ft)
CumDrill
Time(hr)
Int ROP(ft/hr)
Q Flow(gpm)
WOB(1000lbf)
RPM(rpm) SPP (psi)
Drill Str Wt(1000lbf)
PU Str Wt(1000lbf) Drill Tq
1,610.9 2,014.4 403.54 2.00 201.8
Depth Progress: 403.54
Report for: 2000-02-22